Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) 60 — The probability of landing on purple in a single spin is 2/6. The expected number of times it lands on purple in 180 spins is 180 × 2/6 = 60. A candidate who answers 90 has used 3/6 instead of 2/6, miscounting the purple sections as 3. A candidate who answers 30 has used 1/6 instead of 2/6, forgetting one of the two purple sections. A candidate who answers 120 has used the probability of NOT landing on purple, 4/6, by mistake.
- (b) 0.55 — Method: it is easier to find the probability that Ffion wins NEITHER stage, then subtract that from 1. Working: P(lose stage 1) = 1 − 0.4 = 0.6, and P(lose stage 2) = 1 − 0.25 = 0.75. P(neither) = 0.6 × 0.75 = 0.45. P(at least one) = 1 − 0.45 = 0.55. Answer: 0.55. Watch out: adding the two win probabilities, 0.4 + 0.25 = 0.65, treats winning both as impossible and overcounts — that is not how independent probabilities combine. Multiplying the two win probabilities, 0.4 × 0.25 = 0.1, gives the probability of winning BOTH stages, not at least one. And stopping at 0.45, the probability of winning neither stage, forgets the final step of subtracting from 1.
- (c) No — 7/30 is the relative frequency; theory stays 1/6. — The theoretical probability of rolling a 6 on an ordinary dice is fixed at 1/6, worked out from the number of equally likely outcomes, and does not change however the dice is actually rolled. The relative frequency from this trial is 7/30, found from what happened in these particular 30 rolls. Since 7/30 and 1/6 are different numbers, the correct statement is 'No — 7/30 is the relative frequency; theory stays 1/6.' Assuming the two values must always match because they describe the same event gives 'Yes — relative frequency always equals theory.' Believing that an observed result redefines the theoretical probability gives 'Yes — the theoretical probability has now become 7/30.' Refusing to work out either value at all gives 'Neither can be found — 30 rolls is too few to tell', which ignores that both numbers CAN be calculated from the information given.
- (c) 170 — 68% of the 250 packets germinated: 250 × 0.68 = 170. Using the complement, the 32% that did NOT germinate, gives 250 × 0.32 = 80. Shifting the decimal point, using 0.068 instead of 0.68, gives 250 × 0.068 = 17. Rounding 68% up to 70% before multiplying gives 250 × 0.70 = 175.
- (c) 9/16 — There are 180 students in total and 84 are in Year 11, so Year 10 has 180 − 84 = 96 students. Of those 96, 42 travel by bus, so 96 − 42 = 54 walk. P(Year 10 student walks) = 54/96 = 9/16. Using the whole school of 180 as the denominator instead of just the 96 Year 10 students gives 54/180 = 3/10. Using the bus count, 42, as if it were the number who walk gives 42/96 = 7/16, the wrong branch of the Year 10 row. Working out the probability for Year 11 instead of Year 10 — 46 walkers out of 84 — gives 46/84 = 23/42.
- (c) 0.15 — Method: for two independent events, multiply along the branches of the tree to find the probability of both outcomes happening together. Working: P(red and heads) = P(red) × P(heads) = 0.3 × 0.5 = 0.15. Answer: 0.15. Watch out: adding the two probabilities, 0.3 + 0.5 = 0.8, does not give the probability of both — probabilities along one path of a tree are multiplied, not added. Writing down 0.5 ignores the spinner altogether and gives only the coin's probability. And writing down 0.65 is the probability of red OR heads, which is 0.3 + 0.5 − 0.15 = 0.65, a different question from the one asked here.
- (a) 43/70 — There are 140 − 85 = 55 Zone B households, and 55 − 21 = 34 of them recycle glass. In total, 52 + 34 = 86 households recycle glass, out of 140: 86/140 = 43/70. Writing 13/35 is wrong because 52/140 simplifies to 13/35, and 52 only counts Zone A, leaving out the 34 Zone B recyclers. Writing 17/70 is wrong because 34/140 simplifies to 17/70, and 34 only counts Zone B, leaving out the 52 Zone A recyclers. Writing 73/140 is wrong because it adds the 52 Zone A recyclers to the 21 Zone B households that do NOT recycle, mixing up two different groups instead of adding the two recycling groups. The probability is 43/70.
- (d) 0.420 — Method: use the relative frequency worked out from the larger number of trials as the best estimate of the probability, since a bigger sample tends to sit closer to the true probability. Working: 84 out of 200 drops land open end up, so the relative frequency from the total is 84 ÷ 200 = 0.420. Answer: 0.420. Watch out: writing down 0.650 comes from 13 ÷ 20, using only the first, much smaller sample instead of the total. Writing down 0.535 comes from averaging 0.650 and 0.420, treating the 20-drop run and the 200-drop run as equally reliable instead of using the larger sample on its own. And writing down 0.580 comes from 1 − 0.420, working out the probability that the bottle top lands the other way up instead of open end up.
- (d) 24 — There are 4 choices for the first digit. Once that digit is used, 3 digits remain for the second position, and then 2 digits remain for the third position: 4 × 3 × 2 = 24 codes. Choosing 64 comes from allowing a digit to be reused at every position, 4 × 4 × 4 = 64, which is not allowed here since no digit repeats. Choosing 12 comes from multiplying only the first two positions, 4 × 3 = 12, and forgetting that a third digit is also chosen from the digits that remain. Choosing 6 comes from counting only the arrangements of one single set of three digits, 3 × 2 × 1 = 6, and forgetting that there are 4 different sets of three digits that can be chosen from 2, 3, 4 and 5.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (b) 70 — Saloon, estate and hatchback are exhaustive, so their probabilities sum to 1: the probability of a hatchback is 1 − 0.28 − 0.37 = 0.35. The number of hatchbacks is 0.35 × 200 = 70. Treating the SUM of the other two probabilities, 0.28 + 0.37 = 0.65, as the probability of a hatchback instead of its complement gives 0.65 × 200 = 130. Multiplying the correct probability, 0.35, by 100 instead of the 200 cars actually surveyed gives 35. Averaging the two given probabilities, (0.28 + 0.37) ÷ 2 = 0.325, instead of subtracting them from 1, and then multiplying by 200 gives 65.
- (a) 753 — The estimate from 2000 spins is the most reliable, since it comes from the largest sample size, so the best estimate of the probability is 0.251. Over a further 3000 spins, the expected number landing on green is 3000 × 0.251 = 753. Writing 1050 is wrong because 3000 × 0.350 = 1050 uses the estimate from only 20 spins, the LEAST reliable of the three. Writing 870 is wrong because 3000 × 0.290 = 870 uses the estimate from 200 spins rather than the more reliable 2000-spin estimate. Writing 750 is wrong because 3000 × 0.25 = 750 ignores the recorded data completely and simply assumes each of the 4 colours is equally likely. The best estimate is 753 expected green spins.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
- (b) 8,100 — First find the total number of alerts sent in the month: 1,500 × 30 = 45,000. Then apply the probability of a 'STOP' reply: 45,000 × 0.18 = 8,100. Stopping after finding only one day's expected replies, 1,500 × 0.18 = 270, forgets to scale up to the whole month. Multiplying the number of days by the probability instead of by the daily total of alerts gives 30 × 0.18 = 5.4, which rounds to 5. Shifting the decimal point in the probability, using 0.018 instead of 0.18, gives 45,000 × 0.018 = 810.
- (a) 60 — Method: because the counter goes back each time, every draw is the same experiment, so the expected number of reds is the number of draws multiplied by P(red). Working: there are 8 red counters out of 20, so P(red) = 8 ÷ 20 = 0.4. Over 150 draws the expected number of reds is 150 × 0.4 = 60. Answer: about 60 red counters would be expected. The distractors: 90 uses P(blue) by mistake, 150 × 12 ÷ 20 = 90; 100 comes from writing the probability from the red to blue ratio of 8 to 12, giving 150 × 8 ÷ 12 = 100; 75 comes from treating red and blue as equally likely because there are two colours, which gives 150 ÷ 2 = 75.
Build your own mix at the worksheet builder.