Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
- (b) 40% — 32 out of the 80 people chose Coffee, so the percentage is (32 ÷ 80) × 100 = 40%. Choosing 32% comes from treating 32 as if it were already a percentage out of 100, instead of dividing by the actual total of 80 people surveyed. Choosing 25% comes from using the Tea row instead of the Coffee row, (20 ÷ 80) × 100 = 25%. Choosing 20% comes from using the Juice row instead of the Coffee row, (16 ÷ 80) × 100 = 20%.
- (b) 8,100 — First find the total number of alerts sent in the month: 1,500 × 30 = 45,000. Then apply the probability of a 'STOP' reply: 45,000 × 0.18 = 8,100. Stopping after finding only one day's expected replies, 1,500 × 0.18 = 270, forgets to scale up to the whole month. Multiplying the number of days by the probability instead of by the daily total of alerts gives 30 × 0.18 = 5.4, which rounds to 5. Shifting the decimal point in the probability, using 0.018 instead of 0.18, gives 45,000 × 0.018 = 810.
- (b) 0.55 — Method: it is easier to find the probability that Ffion wins NEITHER stage, then subtract that from 1. Working: P(lose stage 1) = 1 − 0.4 = 0.6, and P(lose stage 2) = 1 − 0.25 = 0.75. P(neither) = 0.6 × 0.75 = 0.45. P(at least one) = 1 − 0.45 = 0.55. Answer: 0.55. Watch out: adding the two win probabilities, 0.4 + 0.25 = 0.65, treats winning both as impossible and overcounts — that is not how independent probabilities combine. Multiplying the two win probabilities, 0.4 × 0.25 = 0.1, gives the probability of winning BOTH stages, not at least one. And stopping at 0.45, the probability of winning neither stage, forgets the final step of subtracting from 1.
- (a) 43/70 — There are 140 − 85 = 55 Zone B households, and 55 − 21 = 34 of them recycle glass. In total, 52 + 34 = 86 households recycle glass, out of 140: 86/140 = 43/70. Writing 13/35 is wrong because 52/140 simplifies to 13/35, and 52 only counts Zone A, leaving out the 34 Zone B recyclers. Writing 17/70 is wrong because 34/140 simplifies to 17/70, and 34 only counts Zone B, leaving out the 52 Zone A recyclers. Writing 73/140 is wrong because it adds the 52 Zone A recyclers to the 21 Zone B households that do NOT recycle, mixing up two different groups instead of adding the two recycling groups. The probability is 43/70.
- (b) 24/125 — On the fiction branch, 160 − 112 = 48 books were returned late. None of the non-fiction books were late, so the total number of late books is 48, out of 250 books altogether: 48/250 = 24/125. Writing 3/10 is wrong because it divides the 48 late fiction books by the fiction total (160) instead of the whole library total (250). Writing 56/125 is wrong because 112/250 simplifies to 56/125, and 112 is the number of fiction books returned ON TIME, not late. Writing 9/25 is wrong because 90/250 simplifies to 9/25, and 90 is simply the number of non-fiction books, which has nothing to do with late returns. The probability is 24/125.
- (a) 75% — 'Percentage of the women' restricts the group to the 80 women, of whom 60 attend yoga: 60/80 = 0.75 = 75%. Dividing by the number of men (200 − 80 = 120) instead of the number of women gives 60/120 = 0.5 = 50%. Dividing by all 200 members instead of just the 80 women gives 60/200 = 0.3 = 30%. Using the 20 women who do NOT attend yoga (80 − 60) as the numerator instead of the 60 who do gives 20/80 = 0.25 = 25%.
- (a) £150 — Each game, the expected payout is 0.1 × £20 = £2, so the fête's expected profit per game is the £3 charged minus the £2 expected payout, £1. Over 150 games, that is 150 × £1 = £150. Writing £300 is wrong because 150 × £2 = £300 is the total expected PAYOUT, not the profit — it has not been subtracted from the entry fees. Writing £450 is wrong because 150 × £3 = £450 is the total money taken in entry fees, without accounting for what is expected to be paid out in prizes. Writing £1 is wrong because that is only the expected profit for ONE game — it has not been scaled up to all 150 games. The fête's expected profit is £150.
- (b) £100 — Over 250 games, the expected total winnings are 250 × (1/5) × £12 = £600, since a player wins on 1 of the 5 equally likely sections. The total cost of playing is 250 × £2 = £500. The players' expected profit is the winnings minus the cost: £600 − £500 = £100. Writing £500 is wrong because that is only the total cost of playing, without any winnings included. Writing £600 is wrong because that is only the total expected winnings, without subtracting what was paid to play. Writing £2,500 is wrong because it assumes a win on every single game (250 × £12 = £3,000) instead of using the 1-in-5 probability, then subtracts the cost: £3,000 − £500 = £2,500. The players' expected profit over the 250 games is £100.
- (c) 325 — Method: first find the relative frequency of NOT landing on red from the 200 spins, then scale that up to 500 spins. Working: non-red results = 50 + 80 = 130, out of 200 spins, so P(not red) = 130 ÷ 200 = 0.65. Expected non-red results in 500 spins = 500 × 0.65 = 325. Answer: 325. Watch out: writing down 175 finds the expected number of RED results instead, 70 ÷ 200 × 500 = 175, answering the opposite of what was asked. Writing down 250 assumes landing red or not landing red must be a fair 50-50 split, but the spinner is biased and the actual results do not split evenly. And writing down 130 stops after finding how many of the 200 spins were non-red and forgets to scale that figure up to the 500 spins asked for.
- (b) likely — On the probability scale, 'certain' is reserved for a probability of exactly 1, and 'evens' describes a probability of exactly 0.5. A probability of 0.9 is high but not equal to 1, so the correct word is 'likely'. Choosing 'certain' treats a probability close to 1 as if it were exactly 1, which it is not. Choosing 'evens' misjudges 0.9 as being close to the midpoint of the scale, when it is close to the 'certain' end instead. Choosing 'unlikely' reads the scale the wrong way round, as if a high probability meant a low chance of happening.
- (b) 41/160 — In total, 27 + 14 = 41 of the 160 employees cycle to work, so the probability is 41/160 (41 and 160 share no common factor, so this is already in its simplest form). Writing 27/160 is wrong because it only counts the full-time cyclists and leaves out the 14 part-time cyclists. Writing 41/90 is wrong because it uses the full-time total (90) as the denominator instead of the whole survey (160). Writing 1/5 is wrong because it only uses the part-time branch, simplifying 14/70 to 1/5 and ignoring the full-time cyclists completely. The probability is 41/160.
- (b) 3/10 — The number who use at least one app is 90 − 20 = 70. Since 55 + 42 double-counts the overlap, n(X ∩ Y) = 55 + 42 − 70 = 27, so P(both) = 27/90 = 3/10. Forgetting to subtract the 20 who use neither, and using the full 90 as the union, gives 55 + 42 − 90 = 7, so 7/90. Reporting the probability of using X or Y (or both), 70/90 = 7/9, answers a different question about the union, not the overlap. Reporting the probability of using neither app, 20/90 = 2/9, is the complement of the union, not the intersection.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (c) 11/20 — 'Red or white' combines two mutually exclusive events, so add their probabilities: 3/10 = 6/20 and 1/4 = 5/20, giving 6/20 + 5/20 = 11/20. Multiplying the two probabilities instead of adding them, 3/10 × 1/4, gives 3/40, which would be the probability of red and white together, not red or white — and a bead can't be both colours. Subtracting the sum from 1, 1 − 11/20 = 9/20, gives the probability of the bead being black instead of red or white. Converting 1/4 as 4/20 instead of 5/20 (dividing 20 by 4 but forgetting to scale the numerator) gives 6/20 + 4/20 = 1/2.
Build your own mix at the worksheet builder.