Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) 70 — Saloon, estate and hatchback are exhaustive, so their probabilities sum to 1: the probability of a hatchback is 1 − 0.28 − 0.37 = 0.35. The number of hatchbacks is 0.35 × 200 = 70. Treating the SUM of the other two probabilities, 0.28 + 0.37 = 0.65, as the probability of a hatchback instead of its complement gives 0.65 × 200 = 130. Multiplying the correct probability, 0.35, by 100 instead of the 200 cars actually surveyed gives 35. Averaging the two given probabilities, (0.28 + 0.37) ÷ 2 = 0.325, instead of subtracting them from 1, and then multiplying by 200 gives 65.
- (b) 22.8% — Relative frequency as a percentage is the faulty count divided by the total, then multiplied by 100: 33 ÷ 145 × 100 = 22.76, which rounds to 22.8%. Giving 33.0% as the answer uses the frequency, 33, directly as a percentage without dividing by the total 145 at all. Rounding 22.76 down to 22.7% instead of up applies the wrong rounding direction at the first decimal place. Finding the relative frequency of the bulbs that were NOT faulty first: 145 − 33 = 112, and 112 ÷ 145 × 100 = 77.24, answers the opposite question and rounds to 77.2%.
- (a) 1276 — Method: an unbiased relative frequency tends towards the theoretical probability as the number of trials increases, so use the record resting on the most trials, then multiply by the number of new trials. Working: the three records rest on 50, 200 and 1000 drops, so the most reliable is the one after 1000 drops, namely 0.638, and the run is indeed settling as the trials increase. The expected number of point up landings in 2000 further drops is 2000 × 0.638 = 1276. Answer: about 1276 times. The distractors: 1440 uses the earliest record, which rests on only 50 drops, giving 2000 × 0.720 = 1440; 1330 uses the middle record, treating 200 drops as a safe compromise when 1000 drops is better still, giving 2000 × 0.665 = 1330; 1348 comes from averaging the three records, since 0.720 + 0.665 + 0.638 = 2.023 and 2.023 ÷ 3 = 0.674, then 2000 × 0.674 = 1348, which gives the 50 drop record the same weight as the 1000 drop record.
- (c) 170 — 68% of the 250 packets germinated: 250 × 0.68 = 170. Using the complement, the 32% that did NOT germinate, gives 250 × 0.32 = 80. Shifting the decimal point, using 0.068 instead of 0.68, gives 250 × 0.068 = 17. Rounding 68% up to 70% before multiplying gives 250 × 0.70 = 175.
- (b) 40 — n(P ∪ Q) = n(P) + n(Q) − n(P ∩ Q) = 34 + 27 − 11 = 50. The complement is everyone outside both sets: n((P ∪ Q)′) = 90 − 50 = 40. Adding P and Q without subtracting the overlap gives 34 + 27 = 61, so 90 − 61 = 29 double-subtracts the 11 who are in both. Reporting n(P ∪ Q) itself, 50, forgets to take the complement at all. Subtracting only n(P) from the universal set, 90 − 34 = 56, ignores set Q altogether.
- (a) £150 — Each game, the expected payout is 0.1 × £20 = £2, so the fête's expected profit per game is the £3 charged minus the £2 expected payout, £1. Over 150 games, that is 150 × £1 = £150. Writing £300 is wrong because 150 × £2 = £300 is the total expected PAYOUT, not the profit — it has not been subtracted from the entry fees. Writing £450 is wrong because 150 × £3 = £450 is the total money taken in entry fees, without accounting for what is expected to be paid out in prizes. Writing £1 is wrong because that is only the expected profit for ONE game — it has not been scaled up to all 150 games. The fête's expected profit is £150.
- (d) No, because 3/8 + 5/12 + 1/6 = 23/24 — Using a common denominator of 24: 3/8 = 9/24, 5/12 = 10/24 and 1/6 = 4/24. Adding these numerators gives 9 + 10 + 4 = 23, so the three probabilities sum to 23/24, which is less than 1 — Zara is not correct. Adding the original numerators (3 + 5 + 1 = 9) over a denominator of 12 instead of converting each fraction properly gives 9/12 = 3/4, still less than 1 but the wrong fraction. Converting 1/6 to 5/24 instead of 4/24 (using the wrong scaling) makes the total 9/24 + 10/24 + 5/24 = 24/24 = 1, wrongly suggesting the probabilities are valid. Judging validity from the fact that each individual fraction lies between 0 and 1 ignores that an exhaustive set must sum to exactly 1, not merely contain valid individual values.
- (d) 3/16 — Method: work out each draw's own probability first, then multiply them together since the two draws are independent. Working: there are 8 tickets in all, 3 of them blue, so P(blue) = 3/8. P(spinner number greater than 2) = 2/4 = 1/2, since 3 and 4 qualify. Multiplying gives 3/8 × 1/2, which comes to 3/16. Answer: 3/16. Watch out: writing down 3/8 stops after the first draw and never brings in the spinner at all. Writing down 1/2 does the opposite, using only the spinner and ignoring the ticket draw. And writing down 5/16 uses 5/8, the probability of a RED ticket, instead of 3/8 for blue — reading the wrong colour off the raffle.
- (b) Organiser favoured — expected pay-out is under £1 — The expected pay-out per game is the prize times the probability of winning: £4 × 1/5 = £0.80. The expected income per game is the £1 entry fee, which the organiser collects regardless of the result. Since £0.80 is less than £1, the game favours the organiser, because the expected pay-out is under £1. The claim that the game favours the player, because the pay-out is over £1, is wrong on both counts — the pay-out is not over £1, and it is the organiser who benefits. The claim that the organiser is favoured because the pay-out is over £1 reaches the right side but the wrong reason: £0.80 is under £1, not over it. The claim that the two expected amounts are equal is also wrong: £0.80 and £1 are different amounts, so the game is not fair to both sides.
- (a) 3,860 — The probability a bulb works correctly is the complement of being defective: 1 − 0.035 = 0.965. Expected number working correctly = 0.965 × 4,000 = 3,860. Using the probability of being defective instead of its complement gives 4,000 × 0.035 = 140, the expected number of DEFECTIVE bulbs, not working ones. Shifting the decimal point in the complement, using 0.0965 instead of 0.965, gives 4,000 × 0.0965 = 386. Assuming every bulb works, ignoring the 0.035 probability altogether, gives the full batch of 4,000.
- (d) 0.420 — Method: use the relative frequency worked out from the larger number of trials as the best estimate of the probability, since a bigger sample tends to sit closer to the true probability. Working: 84 out of 200 drops land open end up, so the relative frequency from the total is 84 ÷ 200 = 0.420. Answer: 0.420. Watch out: writing down 0.650 comes from 13 ÷ 20, using only the first, much smaller sample instead of the total. Writing down 0.535 comes from averaging 0.650 and 0.420, treating the 20-drop run and the 200-drop run as equally reliable instead of using the larger sample on its own. And writing down 0.580 comes from 1 − 0.420, working out the probability that the bottle top lands the other way up instead of open end up.
- (b) 500 — Method: when a dice is known to be fair, the theoretical probability is the best thing to work from, and the more trials there are the closer the results tend to it. Working: for a fair dice the probability of a six is 1/6, so the expected number of sixes in 3000 rolls is 3000 × 1 ÷ 6 = 500. The class experiment gave a relative frequency of 14/60, but 60 trials is far too few to overturn a known theoretical value, and the school's 3000 rolls will tend towards 1/6 in any case. Answer: about 500 sixes. The distractors: 700 comes from using the class relative frequency instead of the theory, 3000 × 14 ÷ 60 = 700; 600 comes from splitting the difference between the two, since 1/6 is about 0.167 and 14/60 is about 0.233, whose mean is 0.2, and 3000 × 0.2 = 600; 2500 uses 5/6 instead of 1/6 and counts the rolls expected not to be a six.
- (d) 140 — 90 pupils were in Year 8 on the coach branch. The minibus branch has 200 − 150 = 50 pupils, and all of them are Year 8 too, so the total number of Year 8 pupils is 90 + 50 = 140. Writing 90 alone is wrong because it only counts the coach's Year 8 pupils and misses the minibus ones. Writing 60 is wrong because that is the number of Year 9 pupils on the coach (150 − 90 = 60), not Year 8 at all. Writing 50 alone is wrong because it only counts the minibus pupils and misses the coach's Year 8 pupils. The total is 140.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
Build your own mix at the worksheet builder.