Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) £100 — Over 250 games, the expected total winnings are 250 × (1/5) × £12 = £600, since a player wins on 1 of the 5 equally likely sections. The total cost of playing is 250 × £2 = £500. The players' expected profit is the winnings minus the cost: £600 − £500 = £100. Writing £500 is wrong because that is only the total cost of playing, without any winnings included. Writing £600 is wrong because that is only the total expected winnings, without subtracting what was paid to play. Writing £2,500 is wrong because it assumes a win on every single game (250 × £12 = £3,000) instead of using the 1-in-5 probability, then subtracts the cost: £3,000 − £500 = £2,500. The players' expected profit over the 250 games is £100.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (b) 0.55 — Method: it is easier to find the probability that Ffion wins NEITHER stage, then subtract that from 1. Working: P(lose stage 1) = 1 − 0.4 = 0.6, and P(lose stage 2) = 1 − 0.25 = 0.75. P(neither) = 0.6 × 0.75 = 0.45. P(at least one) = 1 − 0.45 = 0.55. Answer: 0.55. Watch out: adding the two win probabilities, 0.4 + 0.25 = 0.65, treats winning both as impossible and overcounts — that is not how independent probabilities combine. Multiplying the two win probabilities, 0.4 × 0.25 = 0.1, gives the probability of winning BOTH stages, not at least one. And stopping at 0.45, the probability of winning neither stage, forgets the final step of subtracting from 1.
- (b) £100 — Method: find the expected number of wins, turn that into the expected pay out, then compare it with what the games cost. Working: the expected number of wins is 200 × 0.15 = 30. Each win pays £10, so the expected pay out is 30 × 10 = 300 pounds. Playing 200 times at £2 a go costs 200 × 2 = 400 pounds. The expected loss is 400 − 300 = 100 pounds. Answer: Amir should expect to be about £100 down. The distractors: £300 is the expected winnings on their own, with the cost of playing never taken off; £400 is the total cost of playing, with the winnings never taken off; £700 comes from adding the two totals, 400 + 300 = 700, instead of subtracting one from the other.
- (a) 1276 — Method: an unbiased relative frequency tends towards the theoretical probability as the number of trials increases, so use the record resting on the most trials, then multiply by the number of new trials. Working: the three records rest on 50, 200 and 1000 drops, so the most reliable is the one after 1000 drops, namely 0.638, and the run is indeed settling as the trials increase. The expected number of point up landings in 2000 further drops is 2000 × 0.638 = 1276. Answer: about 1276 times. The distractors: 1440 uses the earliest record, which rests on only 50 drops, giving 2000 × 0.720 = 1440; 1330 uses the middle record, treating 200 drops as a safe compromise when 1000 drops is better still, giving 2000 × 0.665 = 1330; 1348 comes from averaging the three records, since 0.720 + 0.665 + 0.638 = 2.023 and 2.023 ÷ 3 = 0.674, then 2000 × 0.674 = 1348, which gives the 50 drop record the same weight as the 1000 drop record.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (a) 0.48 — There are two ways to score exactly one throw: scoring on the first and missing the second, 0.6 × 0.4 = 0.24, or missing the first and scoring the second, 0.4 × 0.6 = 0.24. Adding these gives 0.24 + 0.24 = 0.48. Choosing 0.24 comes from working out only one of the two paths and forgetting the other one also gives exactly one score. Choosing 0.36 comes from working out the probability of scoring BOTH throws, 0.6 × 0.6 = 0.36, instead of exactly one. Choosing 0.84 comes from working out the probability of scoring AT LEAST one throw, 1 − 0.4 × 0.4 = 0.84, instead of exactly one.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (a) Game B, by £8 — Game A's expected total is 40 × 0.2 × £5 = £40. Game B's expected total is 40 × 0.1 × £12 = £48. Game B is higher, by £48 − £40 = £8. Writing 'Game A, by £8' is wrong because it has the right difference but the wrong game — Game A's total (£40) is actually LOWER than Game B's, not higher. Writing 'Game B, by £48' is wrong because £48 is Game B's whole expected total, not the DIFFERENCE between the two games. Writing 'Game A, by £40' is wrong in the same way, using Game A's whole total as if it were the margin, and naming the wrong game as the winner. Game B gives the higher expected total, by £8.
- (b) 39 — Method: put the counts into a two-way table and fill each missing cell by subtracting along a row or down a column. Working: the number of female members is 150 − 80 = 70. The pool column holds 66 members and 35 of them are male, so the number of female pool users is 66 − 35 = 31. Subtracting along the female row, 70 − 31 = 39 female members use the gym. Answer: 39 female members use the gym. The distractors: 45 comes from subtracting along the male row instead, 80 − 35 = 45, which counts male gym users; 31 is the female pool cell, written down one step before the gym cell; 84 is 150 − 66 and counts every gym user, male and female together.
- (a) 3/10 — Germinating and not germinating are exhaustive, so their probabilities sum to 1: 1 − 7/10 = 3/10. Writing 7/10 again gives the probability that the plant DOES germinate, not its complement. Putting the difference 10 − 7 = 3 over the original numerator instead of the original denominator gives 3/7. Inverting the correct answer, swapping its numerator and denominator, gives 10/3, which is impossible as a probability since it is greater than 1.
- (c) Red — Theoretical probability is 1/3 ≈ 0.333 for each colour. Red's relative frequency is 38/90 ≈ 0.422, above 1/3, so red is over-represented. Blue's relative frequency is 26/90 ≈ 0.289, below 1/3, so blue is under-represented, not over. Green's relative frequency is also 26/90 ≈ 0.289, below 1/3 for the same reason. Since red's relative frequency clearly exceeds 1/3, it is not true that none of the colours are over-represented.
- (b) 22.8% — Relative frequency as a percentage is the faulty count divided by the total, then multiplied by 100: 33 ÷ 145 × 100 = 22.76, which rounds to 22.8%. Giving 33.0% as the answer uses the frequency, 33, directly as a percentage without dividing by the total 145 at all. Rounding 22.76 down to 22.7% instead of up applies the wrong rounding direction at the first decimal place. Finding the relative frequency of the bulbs that were NOT faulty first: 145 − 33 = 112, and 112 ÷ 145 × 100 = 77.24, answers the opposite question and rounds to 77.2%.
- (b) 80 — To find the number of attempts needed, divide the target number of successes by the probability of success: 60 ÷ 0.75 = 80. Writing 45 is wrong because 60 × 0.75 = 45 multiplies instead of dividing — that is the number of successes expected from 60 attempts, not the number of attempts needed for 60 successes. Writing 240 is wrong because 60 ÷ 0.25 = 240 uses 0.25, the probability of MISSING, instead of 0.75, the probability of scoring. Writing 90 is wrong because it comes from misremembering 0.75 as 2/3 and dividing by that instead: 60 ÷ (2/3) = 90. She needs to attempt 80 free throws.
- (a) 952 — 68% = 0.68. The relative frequency from the survey applies to the new group of 1400 shoppers, so the expected number is 0.68 × 1400 = 952. Working out 1 − 0.68 = 0.32 and applying that instead, 0.32 × 1400 = 448, finds the number who have NOT used a self-checkout, not the number who have. Applying 68% to the original sample size of 250 instead of the new total of 1400 gives 0.68 × 250 = 170. Applying the complement percentage to the original sample size, 0.32 × 250 = 80, compounds both mistakes.
Build your own mix at the worksheet builder.