- (c) Noah — 11/32 = 0.34375, above 34%. — Converting 11/32 to a decimal gives 11 ÷ 32 = 0.34375, which is greater than 34% (0.34), so Noah has the better save rate: 'Noah — 11/32 = 0.34375, above 34%.' Comparing the raw numbers 34 and 11 directly, without converting the fraction to the same form, gives 'Elin — 34 is bigger than 11.' Treating a larger denominator as meaning a bigger value, rather than smaller equal shares, gives 'Noah — 32 is a bigger denominator.' Rounding 34.375% to 34% to the nearest whole percent hides the difference and gives 'Equal — both round to 34% to the nearest percent.'
- (b) 100 — The sample shows a proportion of 8/60 = 2/15 faulty. Apply that proportion to the new batch of 750: 750 × 2/15 = 100. Flipping the ratio, calculating 8/750 × 60 instead of 8/60 × 750, gives 0.64, which rounds to about 1. Assuming the same number of faulty items applies to the new batch, without scaling for its larger size, just repeats the sample's count of 8. Rounding the proportion 8/60 = 0.1333... down to 0.1 before multiplying gives 750 × 0.1 = 75.
- (d) 1/20 — Method: add the counts on the faulty end branches, divide by the total number of items in the experiment, then cancel. Working: the faulty items number 15 + 5 = 20, and 400 items were checked, so the probability is 20/400. Dividing the top and the bottom by 20 gives 1/20. Answer: the probability is 1/20. The distractors: 3/50 is 15/250 and comes from dividing machine A's faults by machine A's output, which is that machine's own fault rate rather than the probability for the whole batch; 1/30 is 5/150 and does the same on machine B's branch; 19/20 is 380/400 and gives the probability that the item picked is not faulty.
- (b) 22.8% — Relative frequency as a percentage is the faulty count divided by the total, then multiplied by 100: 33 ÷ 145 × 100 = 22.76, which rounds to 22.8%. Giving 33.0% as the answer uses the frequency, 33, directly as a percentage without dividing by the total 145 at all. Rounding 22.76 down to 22.7% instead of up applies the wrong rounding direction at the first decimal place. Finding the relative frequency of the bulbs that were NOT faulty first: 145 − 33 = 112, and 112 ÷ 145 × 100 = 77.24, answers the opposite question and rounds to 77.2%.
- (b) 40% — 32 out of the 80 people chose Coffee, so the percentage is (32 ÷ 80) × 100 = 40%. Choosing 32% comes from treating 32 as if it were already a percentage out of 100, instead of dividing by the actual total of 80 people surveyed. Choosing 25% comes from using the Tea row instead of the Coffee row, (20 ÷ 80) × 100 = 25%. Choosing 20% comes from using the Juice row instead of the Coffee row, (16 ÷ 80) × 100 = 20%.
- (c) 11/20 — 'Red or white' combines two mutually exclusive events, so add their probabilities: 3/10 = 6/20 and 1/4 = 5/20, giving 6/20 + 5/20 = 11/20. Multiplying the two probabilities instead of adding them, 3/10 × 1/4, gives 3/40, which would be the probability of red and white together, not red or white — and a bead can't be both colours. Subtracting the sum from 1, 1 − 11/20 = 9/20, gives the probability of the bead being black instead of red or white. Converting 1/4 as 4/20 instead of 5/20 (dividing 20 by 4 but forgetting to scale the numerator) gives 6/20 + 4/20 = 1/2.
- (a) 50 — To find the number of shots needed for an expected 12 hits, divide the number of hits wanted by the probability of a hit: 12 ÷ 0.24 = 50. Multiplying the number of hits by the probability instead of dividing gives 12 × 0.24 = 2.88, which rounds to 3 shots. Rounding 0.24 to 0.25 before dividing gives 12 ÷ 0.25 = 48. Using the probability of missing, 1 − 0.24 = 0.76, instead of the probability of hitting, gives 12 ÷ 0.76 = 15.79, which rounds to 16.
- (b) 39 — Method: put the counts into a two-way table and fill each missing cell by subtracting along a row or down a column. Working: the number of female members is 150 − 80 = 70. The pool column holds 66 members and 35 of them are male, so the number of female pool users is 66 − 35 = 31. Subtracting along the female row, 70 − 31 = 39 female members use the gym. Answer: 39 female members use the gym. The distractors: 45 comes from subtracting along the male row instead, 80 − 35 = 45, which counts male gym users; 31 is the female pool cell, written down one step before the gym cell; 84 is 150 − 66 and counts every gym user, male and female together.
- (d) 56 — Method: count the trials over the whole period first, then multiply the number of trials by the probability. Working: 4 weeks is 4 × 7 = 28 days, and at 25 trains a day that is 25 × 28 = 700 trains. The expected number of late trains is 700 × 0.08 = 56. Answer: about 56 late trains over the 4 weeks. The distractors: 2 is the expected number for a single day, 25 × 0.08 = 2, with the 28 days never brought in; 14 uses one week instead of four, 25 × 7 × 0.08 = 14; 644 is 700 − 56 and counts the trains expected to be on time.
- (c) 120 — 27 of the 45 sweets are orange (45 − 18 = 27), so the probability of taking an orange sweet is 27/45 = 3/5, and 200 × 3/5 = 120. Writing 80 is wrong because 200 × 18/45 = 80 uses the LEMON sweets' fraction instead of orange. Writing 182 is wrong because it takes the 18 lemon sweets away from the 200 repeats (200 − 18 = 182), applying the ‘the rest are orange’ subtraction to the number of goes instead of to the 45 sweets in the bag. Writing 27 is wrong because it is simply the number of orange sweets in the bag — it has not been scaled up to account for the 200 repeats. The expected number of times an orange sweet is taken is 120.
- (b) £0.30 profit for the stall — The stall keeps the £1.50 entry fee whatever happens, and expects to pay out prize × probability of winning = £6 × 0.2 = £1.20 on average. So its expected profit per game is £1.50 − £1.20 = £0.30. Reporting the expected pay-out of £1.20 itself as the profit forgets that the stall also keeps the entry fee. Assuming the player always wins gives an expected cost of £6 − £1.50 = £4.50, treated as a loss for the stall. Using the probability of NOT winning, 0.8, to find the expected pay-out gives £6 × 0.8 = £4.80, and £1.50 − £4.80 = −£3.30, a £3.30 loss.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
- (b) 500 — Method: when a dice is known to be fair, the theoretical probability is the best thing to work from, and the more trials there are the closer the results tend to it. Working: for a fair dice the probability of a six is 1/6, so the expected number of sixes in 3000 rolls is 3000 × 1 ÷ 6 = 500. The class experiment gave a relative frequency of 14/60, but 60 trials is far too few to overturn a known theoretical value, and the school's 3000 rolls will tend towards 1/6 in any case. Answer: about 500 sixes. The distractors: 700 comes from using the class relative frequency instead of the theory, 3000 × 14 ÷ 60 = 700; 600 comes from splitting the difference between the two, since 1/6 is about 0.167 and 14/60 is about 0.233, whose mean is 0.2, and 3000 × 0.2 = 600; 2500 uses 5/6 instead of 1/6 and counts the rolls expected not to be a six.
- (b) likely — On the probability scale, 'certain' is reserved for a probability of exactly 1, and 'evens' describes a probability of exactly 0.5. A probability of 0.9 is high but not equal to 1, so the correct word is 'likely'. Choosing 'certain' treats a probability close to 1 as if it were exactly 1, which it is not. Choosing 'evens' misjudges 0.9 as being close to the midpoint of the scale, when it is close to the 'certain' end instead. Choosing 'unlikely' reads the scale the wrong way round, as if a high probability meant a low chance of happening.
- (d) 140 — 90 pupils were in Year 8 on the coach branch. The minibus branch has 200 − 150 = 50 pupils, and all of them are Year 8 too, so the total number of Year 8 pupils is 90 + 50 = 140. Writing 90 alone is wrong because it only counts the coach's Year 8 pupils and misses the minibus ones. Writing 60 is wrong because that is the number of Year 9 pupils on the coach (150 − 90 = 60), not Year 8 at all. Writing 50 alone is wrong because it only counts the minibus pupils and misses the coach's Year 8 pupils. The total is 140.