Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 160 — Expected number = probability × number of trials = 0.08 × 2,000 = 160. Moving the decimal point one place too far, using 0.008 instead of 0.08, gives 2,000 × 0.008 = 16. Working out the expected number of customers who do NOT buy a bag, using the complement 1 − 0.08 = 0.92, gives 2,000 × 0.92 = 1,840. Rounding 0.08 up to 0.1 before multiplying gives 2,000 × 0.1 = 200.
- (c) 325 — Method: first find the relative frequency of NOT landing on red from the 200 spins, then scale that up to 500 spins. Working: non-red results = 50 + 80 = 130, out of 200 spins, so P(not red) = 130 ÷ 200 = 0.65. Expected non-red results in 500 spins = 500 × 0.65 = 325. Answer: 325. Watch out: writing down 175 finds the expected number of RED results instead, 70 ÷ 200 × 500 = 175, answering the opposite of what was asked. Writing down 250 assumes landing red or not landing red must be a fair 50-50 split, but the spinner is biased and the actual results do not split evenly. And writing down 130 stops after finding how many of the 200 spins were non-red and forgets to scale that figure up to the 500 spins asked for.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
- (b) 80 — To find the number of attempts needed, divide the target number of successes by the probability of success: 60 ÷ 0.75 = 80. Writing 45 is wrong because 60 × 0.75 = 45 multiplies instead of dividing — that is the number of successes expected from 60 attempts, not the number of attempts needed for 60 successes. Writing 240 is wrong because 60 ÷ 0.25 = 240 uses 0.25, the probability of MISSING, instead of 0.75, the probability of scoring. Writing 90 is wrong because it comes from misremembering 0.75 as 2/3 and dividing by that instead: 60 ÷ (2/3) = 90. She needs to attempt 80 free throws.
- (a) Game B, by £8 — Game A's expected total is 40 × 0.2 × £5 = £40. Game B's expected total is 40 × 0.1 × £12 = £48. Game B is higher, by £48 − £40 = £8. Writing 'Game A, by £8' is wrong because it has the right difference but the wrong game — Game A's total (£40) is actually LOWER than Game B's, not higher. Writing 'Game B, by £48' is wrong because £48 is Game B's whole expected total, not the DIFFERENCE between the two games. Writing 'Game A, by £40' is wrong in the same way, using Game A's whole total as if it were the margin, and naming the wrong game as the winner. Game B gives the higher expected total, by £8.
- (b) 8,100 — First find the total number of alerts sent in the month: 1,500 × 30 = 45,000. Then apply the probability of a 'STOP' reply: 45,000 × 0.18 = 8,100. Stopping after finding only one day's expected replies, 1,500 × 0.18 = 270, forgets to scale up to the whole month. Multiplying the number of days by the probability instead of by the daily total of alerts gives 30 × 0.18 = 5.4, which rounds to 5. Shifting the decimal point in the probability, using 0.018 instead of 0.18, gives 45,000 × 0.018 = 810.
- (d) 3400 — Combining all three greenhouses gives 200 + 150 + 250 = 600 seeds planted in total, and 172 + 126 + 212 = 510 germinated, so the combined estimate of the germination probability is 510/600 = 0.85. Out of a new batch of 4000 seeds, the expected number to germinate is 4000 × 0.85 = 3400. Writing 3440 is wrong because it uses only Greenhouse 1's rate, 172/200 = 0.86, instead of the combined rate from all three: 4000 × 0.86 = 3440. Writing 3360 is wrong because it uses only Greenhouse 2's rate, 126/150 = 0.84: 4000 × 0.84 = 3360. Writing 510 is wrong because that is the total number that germinated in the ORIGINAL trial, not scaled up to the new batch of 4000 seeds at all. The best estimate is 3400 seeds.
- (b) 100 — The sample shows a proportion of 8/60 = 2/15 faulty. Apply that proportion to the new batch of 750: 750 × 2/15 = 100. Flipping the ratio, calculating 8/750 × 60 instead of 8/60 × 750, gives 0.64, which rounds to about 1. Assuming the same number of faulty items applies to the new batch, without scaling for its larger size, just repeats the sample's count of 8. Rounding the proportion 8/60 = 0.1333... down to 0.1 before multiplying gives 750 × 0.1 = 75.
- (a) 0.48 — There are two ways to score exactly one throw: scoring on the first and missing the second, 0.6 × 0.4 = 0.24, or missing the first and scoring the second, 0.4 × 0.6 = 0.24. Adding these gives 0.24 + 0.24 = 0.48. Choosing 0.24 comes from working out only one of the two paths and forgetting the other one also gives exactly one score. Choosing 0.36 comes from working out the probability of scoring BOTH throws, 0.6 × 0.6 = 0.36, instead of exactly one. Choosing 0.84 comes from working out the probability of scoring AT LEAST one throw, 1 − 0.4 × 0.4 = 0.84, instead of exactly one.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (c) 9/16 — There are 180 students in total and 84 are in Year 11, so Year 10 has 180 − 84 = 96 students. Of those 96, 42 travel by bus, so 96 − 42 = 54 walk. P(Year 10 student walks) = 54/96 = 9/16. Using the whole school of 180 as the denominator instead of just the 96 Year 10 students gives 54/180 = 3/10. Using the bus count, 42, as if it were the number who walk gives 42/96 = 7/16, the wrong branch of the Year 10 row. Working out the probability for Year 11 instead of Year 10 — 46 walkers out of 84 — gives 46/84 = 23/42.
- (b) 500 — Method: when a dice is known to be fair, the theoretical probability is the best thing to work from, and the more trials there are the closer the results tend to it. Working: for a fair dice the probability of a six is 1/6, so the expected number of sixes in 3000 rolls is 3000 × 1 ÷ 6 = 500. The class experiment gave a relative frequency of 14/60, but 60 trials is far too few to overturn a known theoretical value, and the school's 3000 rolls will tend towards 1/6 in any case. Answer: about 500 sixes. The distractors: 700 comes from using the class relative frequency instead of the theory, 3000 × 14 ÷ 60 = 700; 600 comes from splitting the difference between the two, since 1/6 is about 0.167 and 14/60 is about 0.233, whose mean is 0.2, and 3000 × 0.2 = 600; 2500 uses 5/6 instead of 1/6 and counts the rolls expected not to be a six.
- (a) 6.75% — Finishing, retiring and being disqualified are exhaustive, so the three percentages sum to 100%: 100% − 68.5% − 24.75% = 6.75%. Adding the two given percentages instead of subtracting them from 100% gives 68.5% + 24.75% = 93.25%, the combined probability of finishing or retiring, not of being disqualified. Subtracting only the retiring percentage from 100% and forgetting the finishing percentage gives 100% − 24.75% = 75.25%. Subtracting only the finishing percentage and forgetting the retiring percentage gives 100% − 68.5% = 31.50%.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (d) 12/25 — The group holds 40 of the 250 tickets, so for any one prize the probability the group wins it is 40/250 = 4/25. There are 3 prizes and the group has the same chance at each one, so the expected number won is 3 × 4/25 = 12/25. Writing 4/25 is wrong because it is the chance of winning just ONE prize, without multiplying by the 3 prizes available. Writing 4/75 is wrong because it divides by the 3 prizes instead of multiplying (4/25 ÷ 3 = 4/75), which would mean the group did worse the more prizes were on offer. Writing 64/15625 is wrong because it multiplies the single-prize probability by itself three times, (4/25)³, as though all three prizes had to be won together, instead of adding up the expected number across the three separate prizes. The expected number of prizes won by the group is 12/25.
Build your own mix at the worksheet builder.