Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) She is wrong; 12 rolls is too few to judge — Method: compare the result with what is expected, then ask whether the experiment is long enough for a difference to mean anything. Working: if the dice were fair the expected number of sixes in 12 rolls is 12 × 1 ÷ 6 = 2, so 4 sixes is 2 above what was expected. But over only 12 rolls a result like this turns up often by chance: the relative frequency here is 4/12, which is 1/3, and over so few trials a relative frequency can sit well away from 1/6 with no bias at all. Answer: Erin is wrong, because 12 rolls is far too few to decide; she should roll the dice many more times and see whether the relative frequency settles near 1/6. The distractors: saying she is right because 4 beats the expected 2 uses the correct expected value but treats any difference as proof, which so short an experiment cannot give; saying a fair dice gives each score twice in 12 rolls treats an expected value as a guaranteed one; saying that 4 sixes in 12 rolls cancels down to 1 in 6 mis-cancels the fraction, because 4/12 is 1/3, which is twice 1/6, so that comment reaches the right verdict from arithmetic that is wrong.
- (d) unlikely and evens — The marked points are impossible (0), unlikely (0.25), evens (0.5) and certain (1). Since 0.25 < 0.3 < 0.5, the probability 0.3 lies between unlikely and evens. Choosing 'impossible and unlikely' treats 0.3 as below 0.25, which it is not. Choosing 'evens and certain' treats 0.3 as above 0.5, which it is not. Choosing 'impossible and evens' skips over the unlikely marker altogether, even though 0.3 is above it.
- (b) 10 — There are 25 equally likely ordered pairs in total. Listing the pairs where the Spinner P score is less than the Spinner Q score gives 10 outcomes, running from (1, 2) up to (4, 5). Choosing 15 comes from also including the 5 pairs where the two scores are equal, such as (1, 1) and (2, 2), which do not satisfy 'less than'. Choosing 4 comes from counting only the outcomes where the scores differ by exactly 1, such as (1, 2) and (2, 3), and missing the pairs that differ by 2, 3 or 4. Choosing 20 comes from correctly excluding the 5 outcomes where the two scores are equal, 25 − 5 = 20, but forgetting to also exclude the outcomes where Spinner P is bigger than Spinner Q, rather than smaller.
- (b) (48/52) × (47/51) — Method: for two deals one after the other with nothing put back, multiply the probability of the first by the probability of the second worked out from the cards that are left. Working: 52 − 4 = 48 cards are not aces, so the first card is not an ace with probability 48/52. One card has now gone and it was not an ace, so 51 cards remain and 47 of them are not aces, giving 47/51. Answer: the probability is (48/52) × (47/51). The distractors: (48/52) × (48/52) comes from leaving the pack at 52 cards for the second deal, which is only true if the first card is replaced; (4/52) × (3/51) comes from working out the probability that both cards ARE aces instead of neither; (4/52) × (4/51) comes from the same misreading with the ace count left at 4 while the total is reduced, adjusting only half of the second fraction.
- (a) 0.15 — Let P(water) = x, so P(coffee) = 3x. The four outcomes are exhaustive: 0.36 + 0.04 + x + 3x = 1, so 0.4 + 4x = 1, giving 4x = 0.6 and x = 0.15. So P(water) = 0.15. Reporting 3x, the coffee probability, instead of water gives 0.45. Splitting the remaining 0.6 evenly between coffee and water, ignoring the 3:1 ratio, gives 0.30. Stopping once the remaining probability 0.6 is found, without dividing by the four equal shares, gives 0.60.
- (b) £100 — Method: find the expected number of wins, turn that into the expected pay out, then compare it with what the games cost. Working: the expected number of wins is 200 × 0.15 = 30. Each win pays £10, so the expected pay out is 30 × 10 = 300 pounds. Playing 200 times at £2 a go costs 200 × 2 = 400 pounds. The expected loss is 400 − 300 = 100 pounds. Answer: Amir should expect to be about £100 down. The distractors: £300 is the expected winnings on their own, with the cost of playing never taken off; £400 is the total cost of playing, with the winnings never taken off; £700 comes from adding the two totals, 400 + 300 = 700, instead of subtracting one from the other.
- (c) 0.31 — Method: a late bus can be reached along two paths of the tree. Multiply along each path, then add the paths that end in a late bus. Working: the rain path gives 0.3 × 0.8 = 0.24. No rain has probability 1 − 0.3 = 0.7, so the second path gives 0.7 × 0.1 = 0.07. Adding the two paths gives 0.24 + 0.07. Answer: the probability is 0.31. The distractors: 0.9 comes from adding the two branch probabilities 0.8 and 0.1 without first weighting them by how often it rains; 0.24 comes from following the rain path only and ignoring that the bus can also be late when it is dry; 0.27 comes from using 0.3 at the start of both paths, so that the no-rain path is given 0.3 × 0.1 instead of 0.7 × 0.1.
- (a) 1/10 — There are 4 × 5 = 20 equally likely outcomes in total. The pairs whose product is 12 are Spinner A showing 3 with Spinner B showing 4, and Spinner A showing 4 with Spinner B showing 3, which is 2 outcomes, giving a probability of 2/20 = 1/10. Choosing 1/20 comes from finding only one of the two pairs, (3, 4), and missing (4, 3) as a separate outcome. Choosing 1/8 comes from using 16 as the total number of outcomes, 4 × 4, forgetting that Spinner B has 5 sections rather than 4. Choosing 1/5 comes from listing the factor pairs of 12 as 2 × 6 and 3 × 4 and counting each one in both orders, (2, 6), (6, 2), (3, 4) and (4, 3), giving 4 outcomes out of 20 without checking that neither spinner has a 6 on it.
- (a) 1/16 — The two spins are independent, so multiply the probability of blue on each spin: 1/4 × 1/4 = 1/16. Choosing 1/2 comes from adding the two probabilities instead of multiplying, 1/4 + 1/4 = 1/2. Choosing 1/8 comes from wrongly treating the second spin as having a 1/2 chance of blue instead of the given 1/4, giving 1/4 × 1/2 = 1/8. Choosing 1/4 comes from giving the probability for a single spin and forgetting that the spinner is spun twice.
- (b) 0.4 — The two events are independent, so multiply the two probabilities: 0.8 × 0.5 = 0.4. Choosing 1.3 comes from adding the two probabilities instead of multiplying, 0.8 + 0.5 = 1.3. Choosing 0.3 comes from subtracting the two probabilities, 0.8 − 0.5 = 0.3, instead of multiplying them. Choosing 0.1 comes from using the probability that Ben is NOT on time, 1 − 0.8 = 0.2, and multiplying that by Freya's probability instead, 0.2 × 0.5 = 0.1.
- (a) 4/9 — There are 3 × 6 = 18 equally likely outcomes. The product is a multiple of 5 whenever Spinner C shows 5, whatever Spinner D shows, which is 6 outcomes, or whenever Spinner D shows 5 and Spinner C shows 2 or 3, which is 2 more outcomes. This gives 6 + 2 = 8 outcomes, so the probability is 8/18 = 4/9. Choosing 1/3 comes from only counting the 6 outcomes where Spinner C shows 5 and forgetting the 2 outcomes where Spinner D shows 5 instead. Choosing 1/9 comes from only counting the 2 outcomes where Spinner D shows 5 and forgetting the 6 outcomes where Spinner C shows 5. Choosing 1/2 comes from counting 9 outcomes instead of 8, by listing the case where Spinner C shows 5 and Spinner D shows 5 twice over.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (b) 10 — Method: the number using at least one machine is the running total plus the weights total minus the overlap, since the overlap would otherwise be added in twice; the number using neither is the survey total minus that. Working: at least one machine = 24 + 20 − 9 = 35. Neither = 45 − 35 = 10. Answer: 10. Watch out: subtracting 24 + 20 from 45 without adding the 9 back, 45 − 24 − 20 = 1, removes the overlap twice over instead of once. Writing down 15, which is 24 − 9, gives the number who use ONLY the running machines, not the number who use neither. And writing down 9 mistakes the overlap region for the region outside both circles altogether.
- (a) 0.8 — Method: the spinner cannot land on red and blue at the same time, so the two events are mutually exclusive and their probabilities are added. Working: 0.3 + 0.5, lining the decimal points up. Answer: 0.8, which also tells you that the remaining colour, green, has probability 0.2 because the three must add to 1. The distractors: 0.2 comes from subtracting 0.3 from 0.5 instead of adding the two probabilities; 0.15 comes from multiplying 0.3 by 0.5 instead of adding them; 0.4 comes from finding the mean of 0.3 and 0.5 rather than their total.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
Build your own mix at the worksheet builder.