Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 5/9 — Method: a bead cannot be two colours at once, so white and purple are mutually exclusive and their probabilities are added over the common total. Working: there are 1 + 4 + 4 = 9 beads, so P(white) = 1/9 and P(purple) = 4/9; adding gives 1/9 + 4/9, and 1 + 4 = 5 ninths. Answer: 5/9. The distractors: 4/9 comes from giving the probability of a purple bead alone and forgetting to include the white one; 5/8 comes from counting 5 favourable beads but using 8 as the total, leaving the single white bead out of the count of the box; 5/18 comes from adding 1/9 and 4/9 by adding the denominators as well as the numerators.
- (b) 5/12 — There are 36 equally likely ordered pairs. Listing the pairs where the red score is smaller than the blue score gives 15 outcomes, so the probability is 15/36 = 5/12. Choosing 1/2 comes from assuming the 36 outcomes split evenly between 'red smaller' and 'red bigger', which ignores the 6 outcomes where the two dice show the same score. Choosing 7/12 comes from including the outcomes where the two scores are equal, 15 + 6 = 21, giving 21/36 = 7/12, instead of using 'less than' strictly. Choosing 5/36 comes from counting only the outcomes where the two scores differ by exactly 1, such as (1, 2) and (2, 3), which is 5 outcomes, and missing the pairs that differ by more than 1.
- (a) 5/12 — Method: a win, a draw and a loss are the only outcomes and no two can happen together, so the three probabilities form an exhaustive set of mutually exclusive events and add to 1; add the two given probabilities, then subtract from 1. Working: 1/4 + 1/3 over the common denominator 12 is 3/12 + 4/12 = 7/12, and 1 − 7/12 = 12/12 − 7/12. Answer: 5/12. The distractors: 7/12 comes from stopping at the probability of a win or a draw and never subtracting from 1; 1/12 comes from subtracting the two given probabilities from each other, 1/3 − 1/4, instead of adding them and taking the total from 1; 5/7 comes from adding 1/4 and 1/3 by adding the numerators and the denominators to get 2/7 and then subtracting that from 1.
- (b) likely — On the probability scale, 'certain' is reserved for a probability of exactly 1, and 'evens' describes a probability of exactly 0.5. A probability of 0.9 is high but not equal to 1, so the correct word is 'likely'. Choosing 'certain' treats a probability close to 1 as if it were exactly 1, which it is not. Choosing 'evens' misjudges 0.9 as being close to the midpoint of the scale, when it is close to the 'certain' end instead. Choosing 'unlikely' reads the scale the wrong way round, as if a high probability meant a low chance of happening.
- (c) 0.5 — Method: count the favourable outcomes, write them over the total number of equally likely outcomes and then divide to turn the fraction into a decimal. Working: the odd scores are 1, 3 and 5, which is 3 of the 6 equally likely scores, so the probability is 3/6, and 3 ÷ 6 = 0.5. Answer: 0.5, the middle of the 0 to 1 probability scale. The distractors: 0.33 comes from listing only 3 and 5 as odd and working out 2 ÷ 6; 0.17 comes from giving the probability of one particular odd score, 1 ÷ 6; 0.3 comes from writing '3 out of 6' as 0.3, reading the 3 straight off as tenths instead of dividing.
- (a) 0.2 — Method: for independent events, the probability that both happen is the product of the two probabilities. Working: the first set is green with probability 0.4 and the second with probability 0.5, so the calculation is 0.4 × 0.5. Since 4 × 5 = 20 and the two factors carry one decimal place each, the product carries two. Answer: the probability is 0.2. The distractors: 0.9 comes from adding 0.4 and 0.5 instead of multiplying them; 0.45 comes from averaging the two probabilities; 0.1 comes from subtracting 0.4 from 0.5, treating the question as a difference.
- (b) 1/4 — There are 4 × 4 = 16 equally likely ordered outcomes for the two dice. The pairs that total 5 are: first dice 1 with second dice 4; first dice 2 with second dice 3; first dice 3 with second dice 2; and first dice 4 with second dice 1 — which is 4 outcomes, so the probability is 4/16 = 1/4. A candidate who answers 1/8 has listed only 2 of the four pairs, forgetting that first dice 1 with second dice 4 and first dice 4 with second dice 1 are separate outcomes because the dice are different. A candidate who answers 3/16 has found 3 pairs instead of 4, missing one from the list. A candidate who answers 1/16 has counted only a single pair, such as first dice 2 with second dice 3, and treated the order of the dice as not mattering.
- (b) 1/8 — Shrubs, bedding plants and trees are the three branches at the first stage of the tree, so they must total 240: tree sales = 240 − 96 − 114 = 30. So P(tree) = 30/240 = 1/8. Using the shrub count instead, 96/240 = 2/5, is the probability of a shrub sale, not a tree sale. Using the bedding-plant count instead, 114/240 = 19/40, is the probability of a bedding-plant sale. Subtracting the bedding count from the shrub count (114 − 96 = 18) instead of subtracting both from 240 gives 18/240 = 3/40, which is not the number of tree sales at all.
- (b) 0.225 — The relative frequency of rain is the number of rainy days out of all days recorded: 9 ÷ 40 = 0.225, which is noticeably less than the forecaster's claimed 0.3. Using the number of dry days, 40 − 9 = 31, as the denominator instead of the total of 40 gives 9 ÷ 31 = 0.29 (2 d.p.). Simply reporting the forecaster's claimed value, 0.3, without calculating anything from the data at all, ignores the recorded results completely. Misplacing the decimal point, treating 9 out of 40 as 9%, gives 0.09 instead of 0.225.
- (a) 1/6 — Method: write the results of the two dice as ordered pairs, count the pairs whose scores add to the total asked for, divide by the number of ordered pairs there are, then cancel the fraction down. Working: there are 6 × 6 = 36 equally likely ordered pairs. The pairs whose scores add to 7 are (1, 6), (2, 5), (3, 4), (4, 3), (5, 2) and (6, 1), which is 6 pairs, so the probability is 6/36. Dividing the top and the bottom by 6 gives 1/6. Answer: the probability is 1/6. The distractors: 7/36 comes from taking the number of favourable pairs to be 7 because 7 is the total asked for, confusing the size of a total with the number of ways of making it; 1/7 comes from using the 21 different combinations of two scores as the equally likely results, finding the 3 combinations 1 and 6, 2 and 5, 3 and 4, and cancelling 3/21; 6/11 comes from counting the 6 favourable pairs correctly but dividing by the 11 possible totals from 2 to 12 rather than by the 36 pairs.
- (b) 41/160 — In total, 27 + 14 = 41 of the 160 employees cycle to work, so the probability is 41/160 (41 and 160 share no common factor, so this is already in its simplest form). Writing 27/160 is wrong because it only counts the full-time cyclists and leaves out the 14 part-time cyclists. Writing 41/90 is wrong because it uses the full-time total (90) as the denominator instead of the whole survey (160). Writing 1/5 is wrong because it only uses the part-time branch, simplifying 14/70 to 1/5 and ignoring the full-time cyclists completely. The probability is 41/160.
- (b) 11/12 — Method: raining and not raining are the only two outcomes, so their probabilities add to 1; subtract the given probability from 1. Working: writing 1 as 12/12 gives 12/12 − 1/12, and only the numerators are subtracted, 12 − 1 = 11. Answer: 11/12, close to the right-hand end of the 0 to 1 scale because rain is unlikely. The distractors: 1/12 comes from giving back the probability that it does rain; 1/11 comes from subtracting the 1 from the denominator instead of subtracting the fraction from 1; 11/11 comes from subtracting 1 from the numerator and from the denominator of 12/12 rather than from the numerator alone.
- (d) 15/64 — Method: because the first marble is put back, the second draw is made from the same 8 marbles, so the two draws are independent and their probabilities are multiplied. Working: the bag holds 8 marbles both times, so yellow first has probability 5/8 and blue second has probability 3/8. Multiplying fractions gives 5 × 3 = 15 on the top and 8 × 8 = 64 on the bottom. Answer: the probability is 15/64. The distractors: 9/64 comes from working out the probability that BOTH marbles are blue, 3/8 × 3/8, instead of one of each colour in the stated order; 15/16 comes from multiplying the numerators but adding the denominators; 5/8 comes from writing down the first draw only and never combining it with the second.
- (c) 0.512 — Method: independent events that must all happen are combined by multiplying their probabilities. Working: the first two questions give 0.8 × 0.8 = 0.64. Bringing in the third gives 0.64 × 0.8, and since 64 × 8 = 512 with three decimal places in the product, this is 0.512. Answer: the probability is 0.512. The distractors: 0.64 comes from multiplying only two of the three probabilities and stopping; 0.8 comes from reading 'independent' as meaning the probability never changes and writing down the single-question figure; 0.0512 comes from a place-value slip in the last multiplication, counting four decimal places instead of three.
- (b) 11/36 — Method: 'at least one' is the opposite of 'none at all', so work out the probability of no 5 on either roll and take it away from 1. Working: a roll that is not a 5 has probability 5/6, and the rolls are independent, so no 5 at all has probability 5/6 × 5/6 = 25/36. Taking this from 36/36 leaves 11/36. Answer: the probability is 11/36. The distractors: 25/36 is the probability of no 5 at all, written down without the final subtraction; 12/36 comes from counting the 6 pairs with a 5 on the first roll and the 6 pairs with a 5 on the second and adding them, which counts the pair (5, 5) twice; 30/36 comes from working out 1 − 1/6 as though only one roll were made.
Build your own mix at the worksheet builder.