Printable · GCSE Foundation · ages 14-16
Probability worksheet — GCSE Foundation
Fifteen questions across the probability statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Probability worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 0.2 — Method: for independent events, the probability that both happen is the product of the two probabilities. Working: the first set is green with probability 0.4 and the second with probability 0.5, so the calculation is 0.4 × 0.5. Since 4 × 5 = 20 and the two factors carry one decimal place each, the product carries two. Answer: the probability is 0.2. The distractors: 0.9 comes from adding 0.4 and 0.5 instead of multiplying them; 0.45 comes from averaging the two probabilities; 0.1 comes from subtracting 0.4 from 0.5, treating the question as a difference.
- (a) 1/6 — Method: for equally likely outcomes, write the number of favourable outcomes over the total number of outcomes. Working: the dice has one face showing 6, and there are 6 equally likely faces in total, so the probability is 1 over 6. Answer: 1/6, which is close to the left-hand end of the 0 to 1 scale because the outcome is unlikely. The distractors: 5/6 comes from giving the probability of not rolling a 6; 1/2 comes from treating 'a 6' and 'not a 6' as two equally likely outcomes; 1/5 comes from writing the one favourable face over the 5 faces that are not a 6 instead of over all 6 faces.
- (c) £3.10 — Aisha's tickets cost 8 × 50p = £4.00. Her expected winnings are (8/400) × £45 = £0.90, since she holds 8 of the 400 tickets. Her expected loss is the cost minus the expected winnings: £4.00 − £0.90 = £3.10. Writing £4.00 is wrong because it is only the cost of her tickets, with no account taken of the expected winnings she might get back. Writing £0.90 is wrong because that is her expected WINNINGS, not her loss — the cost has not been subtracted. Writing £3.89 is wrong because it uses 1 ticket instead of her actual 8 tickets when working out the expected winnings: (1/400) × £45 = £0.1125, giving £4.00 − £0.11 = £3.89. Aisha should expect to lose £3.10.
- (c) 9/25 — The frequency tree already shows the swim-and-cycle branch directly: 54 out of 150, which simplifies to 9/25. Adding both cycling branches together, 54 + 18 = 72, gives the total number of cyclists, so 72/150 = 12/25, not just those who also swim. Using the non-swimmers' cycling figure, 18, gives 18/150 = 3/25, the probability of cycling WITHOUT swimming. Using the swimmers' total of 90, before splitting by cycling, gives 90/150 = 3/5, the probability of swimming on its own.
- (d) 0.80 — Evens is exactly halfway along the scale, at 0.5, and 3/10 written as a decimal is 0.3. A probability 3/10 higher than evens is 0.5 + 0.3 = 0.80. Giving 0.30 as the answer converts the increase but never adds it to the value of evens. Adding the increase to 1, the 'certain' end of the scale, instead of to evens gives 1 + 0.3 = 1.30, which cannot be a probability. Writing 3/10 as 0.03 instead of 0.3, a place-value slip, gives 0.5 + 0.03 = 0.53.
- (b) 11/12 — Method: raining and not raining are the only two outcomes, so their probabilities add to 1; subtract the given probability from 1. Working: writing 1 as 12/12 gives 12/12 − 1/12, and only the numerators are subtracted, 12 − 1 = 11. Answer: 11/12, close to the right-hand end of the 0 to 1 scale because rain is unlikely. The distractors: 1/12 comes from giving back the probability that it does rain; 1/11 comes from subtracting the 1 from the denominator instead of subtracting the fraction from 1; 11/11 comes from subtracting 1 from the numerator and from the denominator of 12/12 rather than from the numerator alone.
- (a) 1200 — Method: take the estimate from the larger sample, because an unbiased relative frequency tends towards the true probability as the sample grows, then multiply by the number of bulbs made in a week. Working: Inspector B tested 500 bulbs, far more than Inspector A's 40, so use B's relative frequency: 30 ÷ 500 = 0.06. A week's production is 4000 × 5 = 20000 bulbs. The expected number of faulty bulbs is 20000 × 0.06 = 1200. Answer: about 1200 faulty bulbs a week. The distractors: 2000 uses Inspector A's estimate, 4 ÷ 40 = 0.1, giving 20000 × 0.1 = 2000, and so rests on a sample of only 40 bulbs; 1600 comes from averaging the two estimates of 0.1 and 0.06 to get 0.08, and 20000 × 0.08 = 1600, which gives the small sample equal weight with the large one; 240 uses the right estimate but stops at a single day, 4000 × 0.06 = 240.
- (b) 1/20 — Method: two draws with nothing put back are combined by multiplying, with the second probability worked out from the tickets still in the bag. Working: the first draw takes the wanted ticket with probability 1/5. That ticket is kept out, so 4 tickets remain and only one of them is the ticket wanted second, giving 1/4. Multiplying gives 1/20. Answer: the probability is 1/20. The distractors: 1/10 comes from ignoring the order and treating the draw as a choice of two tickets from five, of which there are ten; 1/25 comes from keeping the total at 5 for the second draw, which is what happens only if the first ticket is put back; 2/5 comes from counting the two wanted tickets over the five in the bag, as though one draw decided the whole question.
- (b) 6/25 — The probability of winning on any one spin is 2/5, and the probability of losing on any one spin is 3/5. Since the spins are independent, multiply the probability of winning on the first spin by the probability of losing on the second spin: 2/5 × 3/5 = 6/25. A candidate who answers 4/25 has used the winning probability for both spins, 2/5 × 2/5. A candidate who answers 9/25 has used the losing probability for both spins, 3/5 × 3/5. A candidate who answers 3/10 has treated the spins as if they were dependent, reducing the second spin's denominator to 4.
- (a) 5/36 — Method: list every result of the two dice as an ordered pair, first score then second score, count the pairs that give the total asked for and divide by how many pairs the list holds. Working: each dice can show 6 scores, so there are 6 × 6 = 36 equally likely ordered pairs. The pairs whose scores add to 6 are (1, 5), (2, 4), (3, 3), (4, 2) and (5, 1), which is 5 pairs out of the 36. Answer: the probability is 5/36. The distractors: 4/36 comes from listing (1, 5), (5, 1), (2, 4) and (4, 2) and leaving (3, 3) out, because a double does not look like a pair that can be turned round; 5/12 comes from finding the 5 pairs but taking the number of possible results to be 6 + 6 = 12, adding the two dice instead of multiplying them; 1/11 comes from treating the eleven possible totals 2, 3, 4 and so on up to 12 as equally likely, so that a total of 6 is one result out of eleven.
- (c) 500 — Method: the expected number of successes is the number of trials multiplied by the probability, so to find the number of trials, divide the expected number by the probability. Working: let n be the number of seeds planted. Then n multiplied by 0.6 must come to 300, so n = 300 ÷ 0.6 = 500. Answer: the grower should plant 500 seeds. The distractors: 180 comes from multiplying instead of dividing, 300 × 0.6 = 180, which answers how many of 300 seeds would germinate; 750 comes from dividing by the probability of not germinating, 300 ÷ 0.4 = 750; 120 comes from multiplying by that same 0.4, 300 × 0.4 = 120.
- (b) 41/160 — In total, 27 + 14 = 41 of the 160 employees cycle to work, so the probability is 41/160 (41 and 160 share no common factor, so this is already in its simplest form). Writing 27/160 is wrong because it only counts the full-time cyclists and leaves out the 14 part-time cyclists. Writing 41/90 is wrong because it uses the full-time total (90) as the denominator instead of the whole survey (160). Writing 1/5 is wrong because it only uses the part-time branch, simplifying 14/70 to 1/5 and ignoring the full-time cyclists completely. The probability is 41/160.
- (a) 3/8 — There are 4 × 6 = 24 equally likely outcomes. The outcomes with no 3 at all have Spinner E showing 1, 2 or 4 and Spinner F showing 1, 2, 4, 5 or 6, giving 3 × 5 = 15 outcomes. So the outcomes with at least one 3 are 24 − 15 = 9, and the probability is 9/24 = 3/8. Choosing 5/12 comes from adding the two individual probabilities of a 3, 1/4 + 1/6, which counts the outcome where both spinners show 3 twice over. Choosing 1/4 comes from only counting the case where Spinner E shows 3, and forgetting the outcomes where Spinner F shows 3 instead. Choosing 5/8 comes from working out the probability of getting no 3 at all, 15/24 = 5/8, and giving that as the final answer instead of subtracting it from 1.
- (d) 3/20 — The probability of taking a red ball from Bag A is 3/5, and the probability of taking a red ball from Bag B is 1/4. Since the two picks are independent, the probabilities are multiplied: 3/5 × 1/4 = 3/20. A candidate who answers 4/9 has added the numerators and added the denominators, (3+1)/(5+4), instead of multiplying the two fractions. A candidate who answers 17/20 has added the two fractions, 3/5 + 1/4, instead of multiplying them. A candidate who answers 3/25 has misread Bag B as also containing 5 balls, using 1/5 instead of 1/4.
- (c) The green bag (7/24) — Method: fractions can only be ordered once they share a denominator, so rewrite all four over the lowest common denominator and compare the numerators. Working: the lowest common denominator of 12, 8, 24 and 3 is 24, and scaling gives 5/12 = 10/24, 3/8 = 9/24, 7/24 stays as it is, and 1/3 = 8/24; the numerators are then 10, 9, 7 and 8. Answer: the smallest numerator is 7, so the green bag, with 7/24, is the least likely and sits furthest to the left on the 0 to 1 scale. The distractors: the red bag (5/12) comes from finding the largest of the four probabilities instead of the smallest; the blue bag (3/8) comes from scaling 3/8 by changing only the denominator to 24, which turns it into 3/24 and makes it look the smallest; the yellow bag (1/3) comes from comparing numerators alone and assuming the fraction with the numerator 1 must be the smallest.
Build your own mix at the worksheet builder.