Printable · GCSE Foundation · ages 14-16
Compound units: speed, density, pressure worksheet — GCSE Foundation
Fifteen questions on "compound units: speed, density, pressure" — DfE statement R11. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Compound units: speed, density, pressure worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A block of wood has a mass of 60 g and a volume of 100 cm³. Work out the density of the block, in g/cm³.
- 2.A delivery driver travels 45 km in the first 30 minutes of a journey, and then a further 75 km in the next 1 hour. Work out her average speed for the whole journey, in km/h.
- 3.A metal block has a mass of 270 g and a volume of 30 cm³. Work out the density of the block, in g/cm³.
- 4.A coach travels 210 miles at an average speed of 70 mph. Work out how long the journey takes.
- 5.A statue exerts a downward force of 68.4 N on its base, which has an area of 2.85 m². Work out the pressure that the statue exerts on its base, in N/m².
- 6.A cyclist travels 18 km in 45 minutes. Work out the average speed, in km/h.
- 7.Priya is paid £58.50 for working 7.5 hours on a Saturday. Work out her rate of pay, in £ per hour.
- 8.The density of a type of wood is 0.8 g/cm³. Work out the mass of a piece of this wood with a volume of 150 cm³.
- 9.A cyclist rides at an average speed of 24 km/h for 1 hour 15 minutes. Work out the distance travelled, in km.
- 10.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 11.A crate exerts a force of 84 N on the floor through a base with an area of 2.4 m². Work out the pressure on the floor, in N/m².
- 12.A 5 kg bag of potatoes costs £4.50. Work out the cost per kilogram.
- 13.A cyclist rides 19.3 km in 47 minutes. Work out her average speed, in km/h, to 1 decimal place.
- 14.Work out the time taken to travel 120 km at an average speed of 60 km/h.
- 15.Noah runs 2 km in 10 minutes. Work out how long he takes to run 5 km at the same speed.
Answer key
- (d) 0.6 g/cm³ — Density = mass ÷ volume. 60 ÷ 100 = 0.6 g/cm³. 1.67 g/cm³ comes from dividing the volume by the mass instead of the mass by the volume (100 ÷ 60). 6000 g/cm³ comes from multiplying the mass by the volume instead of dividing (60 × 100). 40 g/cm³ comes from subtracting the mass from the volume (100 − 60) instead of dividing.
- (a) 80 km/h — Average speed = total distance ÷ total time. Total distance = 45 + 75 = 120 km. Total time = 30 minutes + 1 hour = 1.5 hours. 120 ÷ 1.5 = 80 km/h. 60 km/h comes from treating the 30 minutes as a whole hour, giving a total time of 2 hours instead of 1.5 (120 ÷ 2). 82.5 km/h comes from averaging the two separate speeds (45 ÷ 0.5 = 90 km/h and 75 ÷ 1 = 75 km/h, then (90 + 75) ÷ 2) instead of using total distance over total time. 75 km/h comes from using only the second part of the journey (75 km in 1 hour) and ignoring the first part.
- (c) 9 g/cm³ — Density = mass ÷ volume, so 270 ÷ 30 = 9 g/cm³. Working out 270 − 30 = 240 subtracts the volume from the mass instead of dividing. Writing 270 gives the mass on its own, without dividing by the volume at all. Working out 270 × 30 = 8100 multiplies mass and volume together instead of dividing. The density of the block is 9 g/cm³.
- (c) 3 hours — Time = distance ÷ speed, so 210 ÷ 70 = 3 hours. Working out 210 − 70 = 140 subtracts the speed from the distance instead of dividing. Working out 210 + 70 = 280 adds the two values together, which does not give a time. Working out 210 × 70 = 14700 multiplies distance and speed together instead of dividing. The journey takes 3 hours.
- (a) 24 N/m² — Pressure = force ÷ area. 68.4 ÷ 2.85 = 24 N/m². 194.94 N/m² comes from multiplying the force by the area instead of dividing (68.4 × 2.85). 65.55 N/m² comes from subtracting the area from the force (68.4 − 2.85) instead of dividing. 0.04 N/m² comes from dividing the area by the force instead of the force by the area (2.85 ÷ 68.4).
- (b) 24 km/h — First convert 45 minutes to hours: 45 ÷ 60 = 0.75 hours. Then divide the distance by the time: 18 ÷ 0.75 = 24 km/h. Reading 45 minutes as 0.45 hours (writing the minutes after the decimal point instead of dividing by 60) gives 18 ÷ 0.45 = 40 km/h. Working out 18 × 0.75 = 13.5 multiplies by the time instead of dividing. Working out 18 ÷ 45 = 0.4 divides by 45 without ever converting the minutes to hours. The cyclist's average speed is 24 km/h.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (d) 120 g — Mass = density × volume, so 0.8 × 150 = 120 g. Working out 150 ÷ 0.8 = 187.5 divides by the density instead of multiplying, the wrong way round for finding a mass. Working out 150 × 8 = 1200 misplaces the decimal point in the density, treating 0.8 g/cm³ as 8 g/cm³. Working out 150 − 0.8 = 149.2 simply subtracts the density from the volume, which does not give a mass. The piece of wood has a mass of 120 g.
- (c) 30 km — First convert 1 hour 15 minutes to hours: 15 minutes is a quarter of an hour, so the time is 1.25 hours. Then multiply by the speed: 24 × 1.25 = 30 km. Reading 15 minutes as 0.15 hours (writing the minutes after the decimal point instead of as a fraction of 60) gives 24 × 1.15 = 27.6 km. Working out 24 × 75 = 1800 multiplies by the number of minutes instead of converting to hours first. Working out 24 ÷ 1.25 = 19.2 divides by the time instead of multiplying. The cyclist travels 30 km.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (b) 35 N/m² — Pressure = force ÷ area. 84 ÷ 2.4 = 35 N/m². 201.6 N/m² comes from multiplying the force by the area instead of dividing (84 × 2.4). 81.6 N/m² comes from subtracting the area from the force (84 − 2.4) instead of dividing. 0.03 N/m² comes from dividing the area by the force instead of the force by the area (2.4 ÷ 84).
- (c) £0.90 — Cost per kilogram = total cost ÷ mass. £4.50 ÷ 5 = £0.90. £1.11 comes from dividing the mass by the cost instead of the cost by the mass (5 ÷ 4.50). £22.50 comes from multiplying the cost by the mass instead of dividing (£4.50 × 5). £0.50 comes from subtracting the two numbers (5 − 4.50) instead of dividing.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (c) 2 hours — Method: time = distance ÷ speed, and the units of the speed fix the unit of the time. Working: 120 ÷ 60 = 2, and because the speed is in kilometres per hour the time is in hours. Answer: 2 hours. The distractors: 0.5 hours comes from dividing the speed by the distance, 60 ÷ 120, the division the wrong way round; 2 minutes comes from the correct division but the wrong unit, reading kilometres per hour as kilometres per minute; 180 minutes comes from adding 120 and 60 instead of dividing.
- (d) 25 minutes — Method: find the time for one kilometre, then multiply by the number of kilometres — the unitary method with a rate. Working: 10 ÷ 2 = 5 minutes per km, and 5 × 5 = 25. Answer: 25 minutes. The distractors: 20 minutes comes from multiplying the 10 minutes by 2, the distance in the given rate, instead of by the scale factor 2.5; 50 minutes comes from multiplying 10 by 5, treating the 10 minutes as the time for a single kilometre; 15 minutes comes from adding the 5 km on to the 10 minutes, adding quantities that are not the same kind.
Build your own mix at the worksheet builder.