- 1.Work out the time taken to travel 120 km at an average speed of 60 km/h.
- 2.A statue exerts a downward force of 68.4 N on its base, which has an area of 2.85 m². Work out the pressure that the statue exerts on its base, in N/m².
- 3.Ffion is paid £11.20 per hour. She works 6 hours on Monday and 4.5 hours on Tuesday. Work out her total pay for the two days.
- 4.A concrete block exerts a force of 45 N on the ground through a base with an area of 0.05 m². Work out the pressure on the ground, in N/m².
- 5.A metal block has a mass of 270 g and a volume of 30 cm³. Work out the density of the block, in g/cm³.
- 6.Two cars leave the same point at the same time and travel in opposite directions. One travels at 80 km/h and the other at 60 km/h. Work out how long it takes until the cars are 350 km apart.
- 7.A cyclist rides 19.3 km in 47 minutes. Work out her average speed, in km/h, to 1 decimal place.
- 8.A car travels 150 km in 3 hours at a constant speed. Work out the average speed of the car, in km/h.
- 9.A force of 126 N acts on an area of 3.5 m². Work out the pressure on the area, in N/m².
- 10.A crate exerts a force of 84 N on the floor through a base with an area of 2.4 m². Work out the pressure on the floor, in N/m².
- 11.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 12.Priya is paid £58.50 for working 7.5 hours on a Saturday. Work out her rate of pay, in £ per hour.
- 13.A metal sample has a mass of 342.6 g and a volume of 18 cm³. Work out the density of the sample, in g/cm³, to 1 decimal place.
- 14.A metal cylinder has a mass of 356.5 g and a volume of 47 cm³. Work out the density of the cylinder, in g/cm³, to 1 decimal place.
- 15.Noah runs 2 km in 10 minutes. Work out how long he takes to run 5 km at the same speed.
Answer key
- (c) 2 hours — Method: time = distance ÷ speed, and the units of the speed fix the unit of the time. Working: 120 ÷ 60 = 2, and because the speed is in kilometres per hour the time is in hours. Answer: 2 hours. The distractors: 0.5 hours comes from dividing the speed by the distance, 60 ÷ 120, the division the wrong way round; 2 minutes comes from the correct division but the wrong unit, reading kilometres per hour as kilometres per minute; 180 minutes comes from adding 120 and 60 instead of dividing.
- (a) 24 N/m² — Pressure = force ÷ area. 68.4 ÷ 2.85 = 24 N/m². 194.94 N/m² comes from multiplying the force by the area instead of dividing (68.4 × 2.85). 65.55 N/m² comes from subtracting the area from the force (68.4 − 2.85) instead of dividing. 0.04 N/m² comes from dividing the area by the force instead of the force by the area (2.85 ÷ 68.4).
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (b) 900 N/m² — Pressure = force ÷ area, so 45 ÷ 0.05 = 900 N/m². Working out 45 ÷ 5 = 9 misplaces the decimal point in the area, treating 0.05 m² as 5 m². Working out 45 × 0.05 = 2.25 multiplies force and area together instead of dividing. Working out 45 + 0.05 = 45.05 simply adds the two given numbers, which does not give a pressure at all. The pressure on the ground is 900 N/m².
- (c) 9 g/cm³ — Density = mass ÷ volume, so 270 ÷ 30 = 9 g/cm³. Working out 270 − 30 = 240 subtracts the volume from the mass instead of dividing. Writing 270 gives the mass on its own, without dividing by the volume at all. Working out 270 × 30 = 8100 multiplies mass and volume together instead of dividing. The density of the block is 9 g/cm³.
- (b) 2.5 hours — Method: when two objects move in opposite directions the gap between them grows at the sum of their speeds, so divide the required gap by that combined rate. Working: 80 + 60 = 140 km of gap each hour, and 350 ÷ 140 = 2.5. Answer: 2.5 hours. The distractors: 17.5 hours comes from subtracting the speeds, 80 − 60 = 20, which is the rate for two cars travelling in the same direction; 5 hours comes from using the mean of the two speeds, 70 km/h, instead of their sum; 4.375 hours comes from dividing 350 by 80 and ignoring the second car altogether.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (d) 50 — Speed = distance ÷ time, so 150 ÷ 3 = 50 km/h. (450 comes from multiplying 150 by 3 instead of dividing. 153 comes from adding 150 and 3. 147 comes from subtracting 3 from 150 — none of these use the correct compound-unit calculation, distance ÷ time.)
- (a) 36 — Pressure = force ÷ area, so 126 ÷ 3.5 = 36 N/m². (0.03 comes from dividing the area by the force instead of the force by the area, the wrong way round. 129.5 comes from adding 126 and 3.5 instead of dividing. 441 comes from multiplying 126 by 3.5 instead of dividing.)
- (b) 35 N/m² — Pressure = force ÷ area. 84 ÷ 2.4 = 35 N/m². 201.6 N/m² comes from multiplying the force by the area instead of dividing (84 × 2.4). 81.6 N/m² comes from subtracting the area from the force (84 − 2.4) instead of dividing. 0.03 N/m² comes from dividing the area by the force instead of the force by the area (2.4 ÷ 84).
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (b) 19.0 g/cm³ — Density = mass ÷ volume. 342.6 ÷ 18 = 19.0333…, which rounds to 19.0 g/cm³ (1 d.p.). 6166.8 g/cm³ comes from multiplying the mass by the volume instead of dividing (342.6 × 18). 324.6 g/cm³ comes from subtracting the volume from the mass (342.6 − 18) instead of dividing. 0.1 g/cm³ comes from dividing the volume by the mass instead of the mass by the volume (18 ÷ 342.6 = 0.0525…, rounded to 1 d.p.).
- (c) 7.6 — Density = mass ÷ volume, so 356.5 ÷ 47 = 7.585..., which rounds to 7.6 g/cm³ (1 d.p.). (0.1 comes from dividing the volume by the mass instead of the mass by the volume, the wrong way round. 7.5 comes from rounding 7.585 down instead of up to 1 decimal place. 403.5 comes from adding the mass and the volume instead of dividing.)
- (d) 25 minutes — Method: find the time for one kilometre, then multiply by the number of kilometres — the unitary method with a rate. Working: 10 ÷ 2 = 5 minutes per km, and 5 × 5 = 25. Answer: 25 minutes. The distractors: 20 minutes comes from multiplying the 10 minutes by 2, the distance in the given rate, instead of by the scale factor 2.5; 50 minutes comes from multiplying 10 by 5, treating the 10 minutes as the time for a single kilometre; 15 minutes comes from adding the 5 km on to the 10 minutes, adding quantities that are not the same kind.