Printable · GCSE Foundation · ages 14-16
Compound units: speed, density, pressure worksheet — GCSE Foundation
Fifteen questions on "compound units: speed, density, pressure" — DfE statement R11. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Answer key: Compound units: speed, density, pressure worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (d) 120 g — Mass = density × volume, so 0.8 × 150 = 120 g. Working out 150 ÷ 0.8 = 187.5 divides by the density instead of multiplying, the wrong way round for finding a mass. Working out 150 × 8 = 1200 misplaces the decimal point in the density, treating 0.8 g/cm³ as 8 g/cm³. Working out 150 − 0.8 = 149.2 simply subtracts the density from the volume, which does not give a mass. The piece of wood has a mass of 120 g.
- (c) 3 hours — Time = distance ÷ speed, so 210 ÷ 70 = 3 hours. Working out 210 − 70 = 140 subtracts the speed from the distance instead of dividing. Working out 210 + 70 = 280 adds the two values together, which does not give a time. Working out 210 × 70 = 14700 multiplies distance and speed together instead of dividing. The journey takes 3 hours.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (d) 0.6 g/cm³ — Density = mass ÷ volume. 60 ÷ 100 = 0.6 g/cm³. 1.67 g/cm³ comes from dividing the volume by the mass instead of the mass by the volume (100 ÷ 60). 6000 g/cm³ comes from multiplying the mass by the volume instead of dividing (60 × 100). 40 g/cm³ comes from subtracting the mass from the volume (100 − 60) instead of dividing.
- (a) 36 — Pressure = force ÷ area, so 126 ÷ 3.5 = 36 N/m². (0.03 comes from dividing the area by the force instead of the force by the area, the wrong way round. 129.5 comes from adding 126 and 3.5 instead of dividing. 441 comes from multiplying 126 by 3.5 instead of dividing.)
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (b) 900 N/m² — Pressure = force ÷ area, so 45 ÷ 0.05 = 900 N/m². Working out 45 ÷ 5 = 9 misplaces the decimal point in the area, treating 0.05 m² as 5 m². Working out 45 × 0.05 = 2.25 multiplies force and area together instead of dividing. Working out 45 + 0.05 = 45.05 simply adds the two given numbers, which does not give a pressure at all. The pressure on the ground is 900 N/m².
- (b) 2.5 hours — Method: when two objects move in opposite directions the gap between them grows at the sum of their speeds, so divide the required gap by that combined rate. Working: 80 + 60 = 140 km of gap each hour, and 350 ÷ 140 = 2.5. Answer: 2.5 hours. The distractors: 17.5 hours comes from subtracting the speeds, 80 − 60 = 20, which is the rate for two cars travelling in the same direction; 5 hours comes from using the mean of the two speeds, 70 km/h, instead of their sum; 4.375 hours comes from dividing 350 by 80 and ignoring the second car altogether.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (a) 15 km/h — Speed = distance ÷ time, so 45 ÷ 3 = 15 km/h. Working out 45 × 3 = 135 multiplies distance and time together instead of dividing. Working out 45 + 3 = 48 and 45 − 3 = 42 both combine the two values by addition or subtraction, which does not give a speed at all. The cyclist's average speed is 15 km/h.
- (d) 25 minutes — Method: find the time for one kilometre, then multiply by the number of kilometres — the unitary method with a rate. Working: 10 ÷ 2 = 5 minutes per km, and 5 × 5 = 25. Answer: 25 minutes. The distractors: 20 minutes comes from multiplying the 10 minutes by 2, the distance in the given rate, instead of by the scale factor 2.5; 50 minutes comes from multiplying 10 by 5, treating the 10 minutes as the time for a single kilometre; 15 minutes comes from adding the 5 km on to the 10 minutes, adding quantities that are not the same kind.
- (c) 7.6 — Density = mass ÷ volume, so 356.5 ÷ 47 = 7.585..., which rounds to 7.6 g/cm³ (1 d.p.). (0.1 comes from dividing the volume by the mass instead of the mass by the volume, the wrong way round. 7.5 comes from rounding 7.585 down instead of up to 1 decimal place. 403.5 comes from adding the mass and the volume instead of dividing.)
- (c) 10 g — Method: mass = density × volume. Working: 2 × 5 = 10, in grams because the density is in grams per cubic centimetre. Answer: 10 g. The distractors: 2.5 g comes from dividing the volume by the density, 5 ÷ 2, instead of multiplying; 0.4 g comes from dividing the density by the volume, 2 ÷ 5; 7 g comes from adding the density and the volume.
- (a) £9.00 — Rate of pay = total pay ÷ number of hours. £54 ÷ 6 = £9.00 per hour. £324.00 comes from multiplying the pay by the hours instead of dividing (£54 × 6). £0.11 comes from dividing the hours by the pay instead of the pay by the hours (6 ÷ 54). £48.00 comes from subtracting the hours from the pay (£54 − 6) instead of dividing.
Build your own mix at the worksheet builder.