Printable · GCSE Foundation · ages 14-16
Direct and inverse proportion worksheet — GCSE Foundation
Fifteen questions on "direct and inverse proportion" — DfE statement R10. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Direct and inverse proportion worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A factory machine produces bottles at a constant rate. In 45 minutes it produces 810 bottles. The factory needs 2,160 bottles for an order. Working at the same rate, work out how many minutes it will take to produce the order.
- 2.y is inversely proportional to x. When x = 5, y = 8. Work out the value of y when x = 10.
- 3.y is directly proportional to x. When x = 2, y = 9. Which of these pairs of values is also consistent with this proportion?
- 4.It takes 2 identical pumps 10 hours to empty a flooded basement. Working at the same rate, work out how many hours 5 of these pumps would take to empty the same basement.
- 5.A journey takes 4 hours at an average speed of 60 km/h. The time taken is inversely proportional to the average speed. Work out how long the same journey takes at an average speed of 80 km/h.
- 6.6 identical printers can print a batch of exam papers in 40 minutes, all working at the same rate. Working at the same rate, work out how many minutes 4 of these printers would take to print the same batch.
- 7.Zara is paid £9 per hour. Her wage is directly proportional to the number of hours she works. Work out her wage for working 6 hours.
- 8.Two numbers a and b are in the ratio a : b = 3 : 4. Given that a = 15, work out the value of b.
- 9.The exchange rate is £1 = €1.15. Convert £200 to euros.
- 10.Work out the value of x when 4/x = 2/5.
- 11.A spring's extension is directly proportional to the force applied to it. A force of 5 N produces an extension of 12 mm. Work out the extension produced by a force of 20 N.
- 12.Paint costs £14.40 for every 20 m² of wall it covers. Assuming the same rate, work out the cost of the paint needed to cover 56 m² of wall.
- 13.y is directly proportional to x. When x = 4, y = 10. Work out the value of y when x = 6.
- 14.8 identical pens cost £6.40 in total. Work out the cost of 5 of the same pens.
- 15.A shop sells ribbon by the metre. 2 m costs £3.00, 4 m costs £6.00, and 7 m costs £10.50. Does this data show that the cost is directly proportional to the length of ribbon bought? Choose the correct verdict and reason.
Answer key
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (a) 4 — Method: for inverse proportion, x × y always stays the same value. Working: when x = 5 and y = 8, the constant is 5 × 8 = 40. When x = 10, y = 40 ÷ 10 = 4. So y = 4. Distractor 16 comes from treating the relationship as direct proportion instead of inverse, working out 8 × 10 ÷ 5. Distractor 3 comes from assuming y decreases by the same amount that x increases, an additive rather than proportional idea. Distractor 0.8 comes from dividing the given y-value, 8, by the new x-value, 10, without first finding the constant.
- (a) x = 6, y = 27 — Method: for direct proportion, y = kx, so k = y ÷ x. Working: k = 9 ÷ 2 = 4.5. At x = 6: y = 4.5 × 6 = 27. Wrong options: x = 6, y = 13 comes from adding the change in x (4) onto y instead of scaling by k; x = 6, y = 3 comes from treating the relationship as inverse proportion (k = 2 × 9 = 18, then y = 18 ÷ 6 = 3); x = 6, y = 24 comes from rounding the constant of proportionality down to 4 instead of using 4.5.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (c) 3 hours — Method: in inverse proportion the product of the two quantities is constant, and here that product is the distance. Working: 60 × 4 = 240 km, so at 80 km/h the time is 240 ÷ 80 = 3. Answer: 3 hours. The distractors: 5 hours 20 minutes comes from treating the relationship as direct, working out 4 × 80 ÷ 60; 2 hours 40 minutes comes from cutting the time by the fraction the speed rose by — the speed went up by one third, so the time was cut by one third — which is not how inverse proportion works; 4 hours comes from dividing the 240 km by the original speed of 60 km/h again instead of by the new speed.
- (a) 60 minutes — Method: for inverse proportion, printers × time is constant. Working: 6 × 40 = 240 (the constant). With 4 printers: 240 ÷ 4 = 60 minutes. Wrong options: 26.7 minutes comes from treating the relationship as direct proportion, scaling the time down as printers decrease (40 × 4 ÷ 6); 24 minutes comes from multiplying the two printer counts together instead of using the constant; 40 minutes comes from not adjusting the time at all for the change in printers.
- (a) £54 — Method: for direct proportion, wage = rate × hours. Working: £9 × 6 = £54. Wrong options: £15 comes from adding the rate and the hours instead of multiplying (£9 + 6); £63 comes from using 7 hours instead of 6; £1.50 comes from dividing the rate by the hours instead of multiplying (£9 ÷ 6).
- (d) 20 — Method: equivalent ratios are linked by a single multiplier, so find it from the part you know and apply it to the other part. Working: 15 ÷ 3 = 5, so the multiplier is 5, and 4 × 5 = 20. Answer: 20. The distractors: 16 comes from adding the difference between the ratio parts, 4 − 3 = 1, to 15, treating the ratio as a difference; 60 comes from multiplying 15 by 4 without first dividing by 3; 11.25 comes from using the ratio the wrong way round, working out 15 × 3 ÷ 4.
- (b) €230.00 — Multiply the amount in pounds by the exchange rate: 200 × 1.15 = 230, so £200 = €230.00. Working out 200 + 1.15 = 201.15 treats the exchange rate as an amount to add rather than a multiplier. Working out 200 × 0.15 = 30 finds only the extra amount earned for every pound and forgets to add it back to the original £200. Working out 200 × 11.5 = 2300.00 misplaces the decimal point in the exchange rate, multiplying by 11.5 instead of 1.15. £200 converts to €230.00.
- (a) 10 — Method: two equal fractions can be rearranged by cross-multiplying, multiplying each numerator by the other denominator. Working: 4 × 5 = 2 × x, so 2x = 20 and x = 20 ÷ 2 = 10. Answer: 10. The distractors: 20 comes from cross-multiplying to 4 × 5 = 20 and stopping there, without dividing by the 2; 8 comes from multiplying the two numerators, 4 × 2; 2.5 comes from working only with the right-hand fraction, 5 ÷ 2, and ignoring the 4.
- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (c) £4.00 — Find the cost of one pen: £6.40 ÷ 8 = £0.80. Then multiply by 5 pens: £0.80 × 5 = £4.00. Dividing £6.40 by 5 and multiplying by 8 gives £10.24 — that uses the ratio the wrong way round, scaling as if 5 pens were more expensive than 8. Stopping at £0.80 only gives the price of one pen. Multiplying the price of one pen by the difference in the number of pens, (8 − 5) × £0.80, gives £2.40 — the cost of the pens NOT bought, not the cost of the 5 pens bought. 5 pens cost £4.00.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
Build your own mix at the worksheet builder.