Printable · GCSE Foundation · ages 14-16
Direct and inverse proportion worksheet — GCSE Foundation
Fifteen questions on "direct and inverse proportion" — DfE statement R10. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Direct and inverse proportion worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A shop sells ribbon by the metre. 2 m costs £3.00, 4 m costs £6.00, and 7 m costs £10.50. Does this data show that the cost is directly proportional to the length of ribbon bought? Choose the correct verdict and reason.
- 2.Two numbers a and b are in the ratio a : b = 3 : 4. Given that a = 15, work out the value of b.
- 3.Paint costs £14.40 for every 20 m² of wall it covers. Assuming the same rate, work out the cost of the paint needed to cover 56 m² of wall.
- 4.3 pencils cost £1.20. Work out the cost of 7 pencils.
- 5.y is inversely proportional to x. When x = 5, y = 8. Work out the value of y when x = 10.
- 6.A factory machine produces bottles at a constant rate. In 45 minutes it produces 810 bottles. The factory needs 2,160 bottles for an order. Working at the same rate, work out how many minutes it will take to produce the order.
- 7.A spring's extension is directly proportional to the force applied to it. A force of 5 N produces an extension of 12 mm. Work out the extension produced by a force of 20 N.
- 8.6 identical printers can print a batch of exam papers in 40 minutes, all working at the same rate. Working at the same rate, work out how many minutes 4 of these printers would take to print the same batch.
- 9.Two numbers are in the ratio 2 : 3. The smaller number is 8. Work out the larger number.
- 10.3 kg of apples cost £6. Work out the cost of 5 kg of the same apples.
- 11.Zara is paid £9 per hour. Her wage is directly proportional to the number of hours she works. Work out her wage for working 6 hours.
- 12.A car uses fuel at a constant rate. It uses 24 litres of fuel to travel 300 km. Assuming the same rate, work out how many litres of fuel are needed for a journey of 175 km.
- 13.6 identical taps fill a paddling pool in 20 minutes. Each tap fills at the same steady rate. Work out how long 3 of these taps would take to fill the same pool.
- 14.A recipe for pancakes uses 240 g of flour to make pancakes for 6 people. Work out how many grams of flour are needed to make pancakes for 15 people, using the same recipe.
- 15.It takes 8 painters 6 days to paint a fence. Working at the same rate, work out how many days 4 painters would take to paint the same fence.
Answer key
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (d) 20 — Method: equivalent ratios are linked by a single multiplier, so find it from the part you know and apply it to the other part. Working: 15 ÷ 3 = 5, so the multiplier is 5, and 4 × 5 = 20. Answer: 20. The distractors: 16 comes from adding the difference between the ratio parts, 4 − 3 = 1, to 15, treating the ratio as a difference; 60 comes from multiplying 15 by 4 without first dividing by 3; 11.25 comes from using the ratio the wrong way round, working out 15 × 3 ÷ 4.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (a) £2.80 — Method: find the cost of one pencil first, then use it to find the cost of 7 pencils. Working: £1.20 ÷ 3 = £0.40 for one pencil, and £0.40 × 7 = £2.80. So 7 pencils cost £2.80. Distractor £8.40 comes from multiplying £1.20 by 7 without first dividing by 3 to find the cost of one pencil. Distractor £1.20 comes from assuming the price stays the same no matter how many pencils are bought. Distractor £0.40 is the cost of one pencil, found correctly but never multiplied by 7.
- (a) 4 — Method: for inverse proportion, x × y always stays the same value. Working: when x = 5 and y = 8, the constant is 5 × 8 = 40. When x = 10, y = 40 ÷ 10 = 4. So y = 4. Distractor 16 comes from treating the relationship as direct proportion instead of inverse, working out 8 × 10 ÷ 5. Distractor 3 comes from assuming y decreases by the same amount that x increases, an additive rather than proportional idea. Distractor 0.8 comes from dividing the given y-value, 8, by the new x-value, 10, without first finding the constant.
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
- (a) 60 minutes — Method: for inverse proportion, printers × time is constant. Working: 6 × 40 = 240 (the constant). With 4 printers: 240 ÷ 4 = 60 minutes. Wrong options: 26.7 minutes comes from treating the relationship as direct proportion, scaling the time down as printers decrease (40 × 4 ÷ 6); 24 minutes comes from multiplying the two printer counts together instead of using the constant; 40 minutes comes from not adjusting the time at all for the change in printers.
- (b) 12 — Method: work out what one part of the ratio is worth, then multiply that by the number of parts in the other share. Working: the smaller number matches the 2 parts, so 8 ÷ 2 = 4 for one part, and 3 × 4 = 12. Answer: 12. The distractors: 16 comes from multiplying 8 by 2, the ratio part that belongs to the smaller number; 24 comes from multiplying 8 by 3 without first finding the value of one part; 9 comes from adding the difference between the ratio parts, 3 − 2 = 1, to 8.
- (b) £10 — Method: find the cost of 1 kg by dividing, then multiply by the mass wanted — the unitary method for direct proportion. Working: £6 ÷ 3 = £2 per kg, and £2 × 5 = £10. Answer: £10. The distractors: £11 comes from adding 5 to the £6 instead of scaling; £30 comes from multiplying £6 by 5 without first dividing by 3; £3.60 comes from turning the proportion upside down, dividing by 5 and multiplying by 3.
- (a) £54 — Method: for direct proportion, wage = rate × hours. Working: £9 × 6 = £54. Wrong options: £15 comes from adding the rate and the hours instead of multiplying (£9 + 6); £63 comes from using 7 hours instead of 6; £1.50 comes from dividing the rate by the hours instead of multiplying (£9 ÷ 6).
- (c) 14 litres — Method: find the amount of fuel used per km first, then use it to find the fuel needed for 175 km. Working: 24 ÷ 300 = 0.08 litres per km, and 0.08 × 175 = 14 litres. So 14 litres are needed. Distractor 24 litres comes from assuming the same amount of fuel is used no matter the distance, without scaling. Distractor 21 litres comes from misreading the original distance as 200 km instead of 300 km. Distractor 1.4 litres comes from a decimal-point slip, giving an answer ten times too small.
- (c) 40 minutes — Method: this is inverse proportion — fewer taps means longer, not shorter — so the number of taps × the time taken stays constant. Working: 6 × 20 = 120, and with 3 taps the time is 120 ÷ 3 = 40 minutes. So 3 taps take 40 minutes. Distractor 10 minutes comes from treating it as direct proportion instead of inverse, working out 20 × 3 ÷ 6. Distractor 30 minutes comes from halving the number of taps and adding half the original time, 20 + 10, instead of doubling the time. Distractor 17 minutes comes from subtracting the number of taps removed, 3, directly from the original time, 20.
- (d) 600 g — Find the flour used for one person: 240 ÷ 6 = 40 g per person. Then scale up to 15 people: 40 × 15 = 600 g. Dividing 240 by 15 and then multiplying by 6 gives 96 g — that uses the ratio the wrong way round, scaling down instead of up. Stopping at 40 g only gives the amount for one person, not for 15. Adding 15 − 6 = 9 to 240 gives 249 g, which treats the number of people and the grams of flour as if they were the same kind of quantity — proportion means scaling, not adding. The recipe needs 600 g of flour.
- (b) 12 days — This is inverse proportion: fewer painters take longer. Multiply the original numbers to find the total painter-days needed: 8 × 6 = 48 painter-days. Divide by the new number of painters: 48 ÷ 4 = 12 days. Working out 6 × 4 ÷ 8 = 3 days treats it as direct proportion, as if fewer painters needed less time. Stopping at 48 gives the total painter-days, not the number of days. Working out 6 + (8 − 4) = 10 days adds the change in the number of painters straight onto the number of days, treating painters and days as the same kind of quantity. 4 painters take 12 days.
Build your own mix at the worksheet builder.