- 1.A straight-line graph shows the cost, C pounds, of hiring a small van for m miles driven. The line passes through the origin and the point (25, 20). Work out the gradient of the line.
- 2.A straight-line graph shows the cost, C pounds, of buying n litres of paint. The line passes through the origin and through the point (5, 40). Work out the gradient of the line.
- 3.Line P passes through the origin and the point (3, 21). Line Q passes through the origin and the point (5, 45). Both lines represent the distance, in metres, run by an athlete against the time, in seconds. Work out the gradient of the steeper line.
- 4.Four graphs are described below. Each shows one quantity plotted against another. Write down the description of the graph that shows two quantities in direct proportion.
- 5.Two taxi firms show their charges on straight-line graphs, with the cost in pounds on the vertical axis and the distance in miles on the horizontal axis. Firm A's line passes through (0, 4) and (5, 14). Firm B's line passes through (0, 6) and (5, 21). Work out which firm charges more per mile.
- 6.Two hikers' journeys are shown on separate distance-time graphs. Hiker A's graph has gradient 4.5 km/h. Hiker B's graph has gradient 3.2 km/h. Work out how much faster Hiker A walks than Hiker B, in km/h.
- 7.A plumber charges a call-out fee plus an hourly rate. The total charge, C pounds, for a job lasting h hours is shown on a straight-line graph. The line passes through the points (2, 70) and (5, 130). Work out the call-out fee, in pounds.
- 8.A mobile phone tariff is shown on a straight-line graph with the monthly cost, C pounds, on the vertical axis and the amount of data used, g gigabytes, on the horizontal axis. The line passes through (0, 10) and (8, 26). Work out the gradient and say what it represents.
- 9.The number of calories burned, E, by a runner is plotted against the time, m minutes, on a straight-line graph. The line passes through the origin and the point (10, 80). Work out the gradient of the line.
- 10.A straight-line graph shows the cost, C pounds, of hiring a bike for h hours. The line passes through the points (1, 12) and (4, 27). Which of these statements about the line is true?
- 11.A dog walker's charge, C pounds, for walking a dog for m minutes is shown on a straight-line graph. The line passes through the points (20, 14) and (50, 26). Work out the charge for a 65-minute walk.
- 12.A gym charges members a joining fee plus a fixed amount per month. The total amount paid, C pounds, is shown on a straight-line graph against the number of months, m. The line passes through the points (3, 130) and (7, 210). Work out the total amount a member will have paid after 12 months.
- 13.An oven is preheating. Its temperature, T °C, is plotted against time, t minutes, on a straight-line graph. The line passes through the points (2, 60) and (6, 140). Work out the gradient of the line.
- 14.A plumber's charge, C pounds, for a job lasting h hours is shown on a straight-line graph. The line passes through the points (1, 45) and (3, 85). Work out what the gradient of this line represents, in context.
- 15.Two printers' running costs are shown on separate straight-line graphs of total cost against number of pages printed. Printer A's graph has gradient £0.04 per page. Printer B's graph has gradient £0.05 per page. Work out how much cheaper it is to print 200 pages on Printer A than on Printer B, based on these running costs alone.
Answer key
- (a) 0.8 — The gradient of a line through the origin is the y-coordinate of a point divided by its x-coordinate: 20 ÷ 25 = 0.8. Choosing 1.25 comes from dividing the wrong way round, 25 ÷ 20. Choosing 20 comes from reading off the cost at the point instead of dividing it by the number of miles. Choosing 5 comes from subtracting the two coordinates (25 − 20) instead of dividing them.
- (b) 8 — Method: the gradient of a straight line is the change in the vertical value divided by the change in the horizontal value between two points on the line. Working: from the origin (0, 0) to (5, 40) the vertical change is 40 − 0 = 40 and the horizontal change is 5 − 0 = 5, so the gradient is 40 ÷ 5 = 8, which here means a cost of £8 for each litre. Answer: 8. The distractors: 0.125 comes from dividing the horizontal change by the vertical change, 5 ÷ 40, which gives litres per pound instead of the gradient; 40 comes from reading off the vertical value of the point and calling it the gradient, ignoring the 5 litres it took to reach that cost; 35 comes from subtracting the two coordinates, 40 − 5, instead of dividing them.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (c) A straight line through the origin, rising from left to right — Two quantities are in direct proportion when one is a constant multiple of the other, so their graph is a straight line through the origin: when one quantity is 0 the other is 0 as well, and doubling one doubles the other. A straight line crossing the vertical axis at 5 has a fixed amount added on, so when the horizontal quantity is 0 the vertical quantity is 5, not 0 — a straight line on its own is not enough for direct proportion. A curve that falls steeply and then levels off without touching either axis shows inverse proportion: one quantity grows as the other shrinks, and their product stays the same. A horizontal line at a height of 3 shows a quantity that does not change at all as the other one grows, so it is not proportional to it.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (a) 1.3 — The gradient of a distance-time graph gives the speed. Difference in speed = 4.5 − 3.2 = 1.3 km/h. A student who subtracts the speeds the wrong way round, 3.2 − 4.5, gets −1.3. A student who adds the two speeds instead of comparing them gets 7.7. A student who multiplies the two gradients gets 14.4.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (b) 8 — The gradient of a line through the origin is the y-value divided by the x-value at any point on the line. Using (10, 80): gradient = 80 ÷ 10 = 8.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (c) £310 — Gradient = (210 − 130) ÷ (7 − 3) = 80 ÷ 4 = 20, so the monthly rate is £20. Using C = 20m + c with the point (3, 130): 130 = 60 + c, so c = 70. After 12 months: C = 20 × 12 + 70 = 240 + 70 = £310.
- (d) 20 — Gradient = change in T ÷ change in t = (140 − 60) ÷ (6 − 2) = 80 ÷ 4 = 20. A student who subtracts in the wrong order gets −20. A student who divides 80 by 2 instead of 4 gets 40. A student who wrongly treats the line as passing through the origin and uses the point (2, 60) on its own gets 60 ÷ 2 = 30.
- (a) The plumber charges £20 for each extra hour worked — The gradient is the change in C divided by the change in h: (85 − 45) ÷ (3 − 1) = 40 ÷ 2 = £20. On this graph the gradient represents the extra amount charged for each extra hour worked, so the answer is 'The plumber charges £20 for each extra hour worked'. Not dividing by the change in h gives 40, the option that reads 'charges £40 for each extra hour worked' — that is the total change in cost between the two points, not the rate per hour. Reading off the C-value of the first point, 45, gives the option using £45 — that is the cost of a job lasting 1 hour, not the rate. Treating the gradient as a flat total charge regardless of the time taken misunderstands what a straight-line graph through two different h-values shows: the cost does depend on h, so it cannot be a single fixed total.
- (d) £2.00 — Cost for Printer A = 200 × £0.04 = £8. Cost for Printer B = 200 × £0.05 = £10. Difference = £10 − £8 = £2.00.