Printable · GCSE Foundation · ages 14-16
Gradient as a rate of change worksheet — GCSE Foundation
Fifteen questions on "gradient as a rate of change" — DfE statement R14. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Gradient as a rate of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A straight-line graph shows the number of pages printed, p, plotted against the time in minutes, t, since a printer started a print job. The line passes through the points (2, 30) and (5, 90). Work out the gradient of the line.
- 2.An oven is preheating. Its temperature, T °C, is plotted against time, t minutes, on a straight-line graph. The line passes through the points (2, 60) and (6, 140). Work out the gradient of the line.
- 3.Four graphs are described below. Each shows one quantity plotted against another. Write down the description of the graph that shows two quantities in direct proportion.
- 4.Two broadband providers show their monthly cost on straight-line graphs, with the cost in pounds on the vertical axis and the data used in gigabytes on the horizontal axis. Provider X's line passes through (0, 15) and (100, 35). Provider Y's line passes through (0, 5) and (100, 45). Work out which provider is cheaper for a customer who uses 40 gigabytes in a month.
- 5.Two printers' running costs are shown on separate straight-line graphs of total cost against number of pages printed. Printer A's graph has gradient £0.04 per page. Printer B's graph has gradient £0.05 per page. Work out how much cheaper it is to print 200 pages on Printer A than on Printer B, based on these running costs alone.
- 6.A plumber charges a call-out fee plus an hourly rate. The total charge, C pounds, for a job lasting h hours is shown on a straight-line graph. The line passes through the points (2, 70) and (5, 130). Work out the call-out fee, in pounds.
- 7.Two taxi firms show their charges on straight-line graphs, with the cost in pounds on the vertical axis and the distance in miles on the horizontal axis. Firm A's line passes through (0, 4) and (5, 14). Firm B's line passes through (0, 6) and (5, 21). Work out which firm charges more per mile.
- 8.A straight-line graph shows the cost, C pounds, of hiring a small van for m miles driven. The line passes through the origin and the point (25, 20). Work out the gradient of the line.
- 9.A conversion graph between kilometres and miles passes through the origin and the point (50, 31), with the number of kilometres on the horizontal axis and the number of miles on the vertical axis. Work out the number of miles equivalent to 1 kilometre.
- 10.A straight-line graph shows the cost, C pounds, of buying n litres of paint. The line passes through the origin and through the point (5, 40). Work out the gradient of the line.
- 11.A plumber's charge, C pounds, for a job lasting h hours is shown on a straight-line graph. The line passes through the points (1, 45) and (3, 85). Work out what the gradient of this line represents, in context.
- 12.Two quantities, P and Q, are in inverse proportion. A graph is drawn with P on the vertical axis and Q on the horizontal axis. Write down which description fits the shape of this graph.
- 13.A dog walker's charge, C pounds, for walking a dog for m minutes is shown on a straight-line graph. The line passes through the points (20, 14) and (50, 26). Work out the charge for a 65-minute walk.
- 14.A hosepipe fills a paddling pool at a constant rate. The volume of water in the pool increases by 15 litres every 3 minutes. Write down the gradient of the graph of volume against time.
- 15.Line P passes through the origin and the point (3, 21). Line Q passes through the origin and the point (5, 45). Both lines represent the distance, in metres, run by an athlete against the time, in seconds. Work out the gradient of the steeper line.
Answer key
- (b) 20 — The gradient is the change in p divided by the change in t: (90 − 30) ÷ (5 − 2) = 60 ÷ 3 = 20. Choosing 0.05 comes from dividing the change in t by the change in p, the wrong way round (3 ÷ 60). Choosing −20 comes from subtracting the coordinates in the wrong order for one part of the calculation, for example (30 − 90) ÷ (5 − 2), giving a negative value. Choosing 18 comes from dividing the second p-coordinate by the second t-coordinate directly (90 ÷ 5) instead of using the change between the two points.
- (d) 20 — Gradient = change in T ÷ change in t = (140 − 60) ÷ (6 − 2) = 80 ÷ 4 = 20. A student who subtracts in the wrong order gets −20. A student who divides 80 by 2 instead of 4 gets 40. A student who wrongly treats the line as passing through the origin and uses the point (2, 60) on its own gets 60 ÷ 2 = 30.
- (c) A straight line through the origin, rising from left to right — Two quantities are in direct proportion when one is a constant multiple of the other, so their graph is a straight line through the origin: when one quantity is 0 the other is 0 as well, and doubling one doubles the other. A straight line crossing the vertical axis at 5 has a fixed amount added on, so when the horizontal quantity is 0 the vertical quantity is 5, not 0 — a straight line on its own is not enough for direct proportion. A curve that falls steeply and then levels off without touching either axis shows inverse proportion: one quantity grows as the other shrinks, and their product stays the same. A horizontal line at a height of 3 shows a quantity that does not change at all as the other one grows, so it is not proportional to it.
- (b) Provider Y — £21.00 against Provider X's £23.00 — Provider X's gradient is (35 − 15) ÷ 100 = 0.2, so cost = 15 + 0.2 × 40 = 15 + 8 = £23.00. Provider Y's gradient is (45 − 5) ÷ 100 = 0.4, so cost = 5 + 0.4 × 40 = 5 + 16 = £21.00. £21.00 is less than £23.00, so Provider Y is cheaper: 'Provider Y — £21.00 against Provider X's £23.00'. Getting both costs right but naming Provider X as cheaper compares the two numbers the wrong way round — £23.00 is more than £21.00, not less. Comparing only the fixed fees, £15.00 and £5.00, ignores the cost of the 40 gigabytes actually used. Reading off the costs at 100 gigabytes, £35.00 and £45.00, directly from the graph answers a different usage from the 40 gigabytes the question asks about.
- (d) £2.00 — Cost for Printer A = 200 × £0.04 = £8. Cost for Printer B = 200 × £0.05 = £10. Difference = £10 − £8 = £2.00.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (a) 0.8 — The gradient of a line through the origin is the y-coordinate of a point divided by its x-coordinate: 20 ÷ 25 = 0.8. Choosing 1.25 comes from dividing the wrong way round, 25 ÷ 20. Choosing 20 comes from reading off the cost at the point instead of dividing it by the number of miles. Choosing 5 comes from subtracting the two coordinates (25 − 20) instead of dividing them.
- (a) 0.62 miles — The gradient of the line is the change in miles divided by the change in kilometres: 31 ÷ 50 = 0.62, so 1 kilometre converts to 0.62 miles. Dividing the wrong way round, 50 ÷ 31 = 1.612..., rounds to 1.61 miles — that finds how many kilometres are in 1 mile, not the reverse. Doubling the gradient, 1.24 miles, comes from using 62 ÷ 50 instead of 31 ÷ 50. Reading off the y-coordinate of the given point without dividing by the x-coordinate gives 31.00 miles, which is the number of miles for 50 kilometres, not for 1 kilometre.
- (b) 8 — Method: the gradient of a straight line is the change in the vertical value divided by the change in the horizontal value between two points on the line. Working: from the origin (0, 0) to (5, 40) the vertical change is 40 − 0 = 40 and the horizontal change is 5 − 0 = 5, so the gradient is 40 ÷ 5 = 8, which here means a cost of £8 for each litre. Answer: 8. The distractors: 0.125 comes from dividing the horizontal change by the vertical change, 5 ÷ 40, which gives litres per pound instead of the gradient; 40 comes from reading off the vertical value of the point and calling it the gradient, ignoring the 5 litres it took to reach that cost; 35 comes from subtracting the two coordinates, 40 − 5, instead of dividing them.
- (a) The plumber charges £20 for each extra hour worked — The gradient is the change in C divided by the change in h: (85 − 45) ÷ (3 − 1) = 40 ÷ 2 = £20. On this graph the gradient represents the extra amount charged for each extra hour worked, so the answer is 'The plumber charges £20 for each extra hour worked'. Not dividing by the change in h gives 40, the option that reads 'charges £40 for each extra hour worked' — that is the total change in cost between the two points, not the rate per hour. Reading off the C-value of the first point, 45, gives the option using £45 — that is the cost of a job lasting 1 hour, not the rate. Treating the gradient as a flat total charge regardless of the time taken misunderstands what a straight-line graph through two different h-values shows: the cost does depend on h, so it cannot be a single fixed total.
- (d) A falling curve that never touches either axis — Method: inverse proportion means the product of the two quantities is constant, so P = k ÷ Q; as Q grows P shrinks, and P can never reach zero because k divided by a number is never zero. Working: taking k = 12 as an example, the pairs (1, 12), (2, 6), (3, 4), (6, 2) and (12, 1) drop steeply at first and then flatten out, so the graph is a curve that approaches both axes without meeting either of them. Answer: a falling curve that never touches either axis. The distractors: 'a straight line through the origin' is the graph of direct proportion, P = kQ, which is the opposite relationship; 'a straight line with a negative gradient' is the commonest error, reading 'P falls as Q rises' as a straight line, but on such a line P would drop by the same amount for every increase in Q and would cross the horizontal axis into negative values; 'a straight line crossing the vertical axis above zero' is a relationship of the form P = mQ + c, in which P and Q are not proportional at all.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (d) 5 — The gradient equals the amount gained divided by the time taken: 15 ÷ 3 = 5 litres per minute.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
Build your own mix at the worksheet builder.