Printable · GCSE Foundation · ages 14-16
Gradient as a rate of change worksheet — GCSE Foundation
Fifteen questions on "gradient as a rate of change" — DfE statement R14. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Answer key: Gradient as a rate of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) 5 — The gradient equals the amount gained divided by the time taken: 15 ÷ 3 = 5 litres per minute.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (d) A falling curve that never touches either axis — Method: inverse proportion means the product of the two quantities is constant, so P = k ÷ Q; as Q grows P shrinks, and P can never reach zero because k divided by a number is never zero. Working: taking k = 12 as an example, the pairs (1, 12), (2, 6), (3, 4), (6, 2) and (12, 1) drop steeply at first and then flatten out, so the graph is a curve that approaches both axes without meeting either of them. Answer: a falling curve that never touches either axis. The distractors: 'a straight line through the origin' is the graph of direct proportion, P = kQ, which is the opposite relationship; 'a straight line with a negative gradient' is the commonest error, reading 'P falls as Q rises' as a straight line, but on such a line P would drop by the same amount for every increase in Q and would cross the horizontal axis into negative values; 'a straight line crossing the vertical axis above zero' is a relationship of the form P = mQ + c, in which P and Q are not proportional at all.
- (a) 0.62 miles — The gradient of the line is the change in miles divided by the change in kilometres: 31 ÷ 50 = 0.62, so 1 kilometre converts to 0.62 miles. Dividing the wrong way round, 50 ÷ 31 = 1.612..., rounds to 1.61 miles — that finds how many kilometres are in 1 mile, not the reverse. Doubling the gradient, 1.24 miles, comes from using 62 ÷ 50 instead of 31 ÷ 50. Reading off the y-coordinate of the given point without dividing by the x-coordinate gives 31.00 miles, which is the number of miles for 50 kilometres, not for 1 kilometre.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (b) −3 — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, with both changes taken in the same direction along the line. Working: going from (1, 20) to (5, 8) the change in y is 8 − 20 = −12 and the change in x is 5 − 1 = 4, so the gradient is −12 ÷ 4 = −3. Answer: −3, and the negative sign is expected because the line falls from left to right. The distractors: 3 comes from subtracting the smaller y from the larger, 20 − 8 = 12, while still taking the x values from left to right, which loses the minus sign that says the line falls; −12 is the change in y left undivided by the change in x of 4; −1/3 comes from dividing the change in x by the change in y, 4 ÷ (−12), turning the gradient upside down.
- (a) £3.00 per window — The gradient is the change in C divided by the change in w. Change in C = 26 − 14 = 12. Change in w = 6 − 2 = 4. Gradient = 12 ÷ 4 = £3.00 per window. Dividing the change in w by the change in C instead gives 4 ÷ 12 = £0.33 per window. Dividing 12 by the larger w-value only, 12 ÷ 6 = £2.00 per window, comes from not subtracting the smaller w-value first. Adding the w-values instead of subtracting, 12 ÷ (6 + 2) = £1.50 per window, comes from a sign error when finding the change in w.
- (b) 8 — The gradient of a line through the origin is the y-value divided by the x-value at any point on the line. Using (10, 80): gradient = 80 ÷ 10 = 8.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (d) The line is straight and passes through the origin. — Direct proportion means y = kx for a constant k. This is a straight line, and when x = 0, y = 0, so it passes through the origin. For a positive k it slopes upward from left to right.
- (a) Inverse proportion — A curve that decreases and never touches either axis is the standard shape for inverse proportion, y = k/x. Direct proportion graphs are straight lines through the origin, which this is not, so it must be inverse proportion rather than neither.
- (d) 25 — Gradient = (60 − 20) ÷ (15 − 5) = 40 ÷ 10 = 4 litres per minute. Since the butt is empty at t = 0, V = 4t. Setting V = 100 gives t = 100 ÷ 4 = 25 minutes.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (b) Provider Y — £21.00 against Provider X's £23.00 — Provider X's gradient is (35 − 15) ÷ 100 = 0.2, so cost = 15 + 0.2 × 40 = 15 + 8 = £23.00. Provider Y's gradient is (45 − 5) ÷ 100 = 0.4, so cost = 5 + 0.4 × 40 = 5 + 16 = £21.00. £21.00 is less than £23.00, so Provider Y is cheaper: 'Provider Y — £21.00 against Provider X's £23.00'. Getting both costs right but naming Provider X as cheaper compares the two numbers the wrong way round — £23.00 is more than £21.00, not less. Comparing only the fixed fees, £15.00 and £5.00, ignores the cost of the 40 gigabytes actually used. Reading off the costs at 100 gigabytes, £35.00 and £45.00, directly from the graph answers a different usage from the 40 gigabytes the question asks about.
Build your own mix at the worksheet builder.