- (d) 25 — Gradient = (60 − 20) ÷ (15 − 5) = 40 ÷ 10 = 4 litres per minute. Since the butt is empty at t = 0, V = 4t. Setting V = 100 gives t = 100 ÷ 4 = 25 minutes.
- (a) £3.00 per window — The gradient is the change in C divided by the change in w. Change in C = 26 − 14 = 12. Change in w = 6 − 2 = 4. Gradient = 12 ÷ 4 = £3.00 per window. Dividing the change in w by the change in C instead gives 4 ÷ 12 = £0.33 per window. Dividing 12 by the larger w-value only, 12 ÷ 6 = £2.00 per window, comes from not subtracting the smaller w-value first. Adding the w-values instead of subtracting, 12 ÷ (6 + 2) = £1.50 per window, comes from a sign error when finding the change in w.
- (a) The plumber charges £20 for each extra hour worked — The gradient is the change in C divided by the change in h: (85 − 45) ÷ (3 − 1) = 40 ÷ 2 = £20. On this graph the gradient represents the extra amount charged for each extra hour worked, so the answer is 'The plumber charges £20 for each extra hour worked'. Not dividing by the change in h gives 40, the option that reads 'charges £40 for each extra hour worked' — that is the total change in cost between the two points, not the rate per hour. Reading off the C-value of the first point, 45, gives the option using £45 — that is the cost of a job lasting 1 hour, not the rate. Treating the gradient as a flat total charge regardless of the time taken misunderstands what a straight-line graph through two different h-values shows: the cost does depend on h, so it cannot be a single fixed total.
- (b) −3 — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, with both changes taken in the same direction along the line. Working: going from (1, 20) to (5, 8) the change in y is 8 − 20 = −12 and the change in x is 5 − 1 = 4, so the gradient is −12 ÷ 4 = −3. Answer: −3, and the negative sign is expected because the line falls from left to right. The distractors: 3 comes from subtracting the smaller y from the larger, 20 − 8 = 12, while still taking the x values from left to right, which loses the minus sign that says the line falls; −12 is the change in y left undivided by the change in x of 4; −1/3 comes from dividing the change in x by the change in y, 4 ÷ (−12), turning the gradient upside down.
- (a) 20 litres per minute — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, and its units are the vertical unit for each one of the horizontal unit. Working: from (2, 50) to (6, 130) the volume changes by 130 − 50 = 80 litres and the time changes by 6 − 2 = 4 minutes, so the gradient is 80 ÷ 4 = 20, measured in litres for each minute. Answer: 20 litres per minute. The distractors: 25 litres per minute comes from using one point on its own, 50 ÷ 2, which assumes the line starts at the origin when the tank already held 50 litres at 2 minutes; 0.05 litres per minute comes from dividing the change in time by the change in volume, 4 ÷ 80, which gives the time for each litre but is then labelled as litres for each minute; 20 minutes for each litre has the right value with the units the wrong way round, and a tank that needed 20 minutes to gain a single litre would be filling far more slowly than this one.
- (d) 20 — Gradient = change in T ÷ change in t = (140 − 60) ÷ (6 − 2) = 80 ÷ 4 = 20. A student who subtracts in the wrong order gets −20. A student who divides 80 by 2 instead of 4 gets 40. A student who wrongly treats the line as passing through the origin and uses the point (2, 60) on its own gets 60 ÷ 2 = 30.
- (a) 0.8 — The gradient of a line through the origin is the y-coordinate of a point divided by its x-coordinate: 20 ÷ 25 = 0.8. Choosing 1.25 comes from dividing the wrong way round, 25 ÷ 20. Choosing 20 comes from reading off the cost at the point instead of dividing it by the number of miles. Choosing 5 comes from subtracting the two coordinates (25 − 20) instead of dividing them.
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (c) A straight line through the origin, rising from left to right — Two quantities are in direct proportion when one is a constant multiple of the other, so their graph is a straight line through the origin: when one quantity is 0 the other is 0 as well, and doubling one doubles the other. A straight line crossing the vertical axis at 5 has a fixed amount added on, so when the horizontal quantity is 0 the vertical quantity is 5, not 0 — a straight line on its own is not enough for direct proportion. A curve that falls steeply and then levels off without touching either axis shows inverse proportion: one quantity grows as the other shrinks, and their product stays the same. A horizontal line at a height of 3 shows a quantity that does not change at all as the other one grows, so it is not proportional to it.
- (d) The line is straight and passes through the origin. — Direct proportion means y = kx for a constant k. This is a straight line, and when x = 0, y = 0, so it passes through the origin. For a positive k it slopes upward from left to right.
- (d) The candle's height decreases by 0.3 cm every minute. — A negative gradient means the quantity on the vertical axis decreases as the quantity on the horizontal axis increases. The size of the gradient, 0.3, gives the amount of decrease per minute.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (b) 8 — The gradient of a line through the origin is the y-value divided by the x-value at any point on the line. Using (10, 80): gradient = 80 ÷ 10 = 8.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (c) £310 — Gradient = (210 − 130) ÷ (7 − 3) = 80 ÷ 4 = 20, so the monthly rate is £20. Using C = 20m + c with the point (3, 130): 130 = 60 + c, so c = 70. After 12 months: C = 20 × 12 + 70 = 240 + 70 = £310.