Printable · GCSE Foundation · ages 14-16
Gradient as a rate of change worksheet — GCSE Foundation
Fifteen questions on "gradient as a rate of change" — DfE statement R14. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Answer key: Gradient as a rate of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 0.8 — The gradient of a line through the origin is the y-coordinate of a point divided by its x-coordinate: 20 ÷ 25 = 0.8. Choosing 1.25 comes from dividing the wrong way round, 25 ÷ 20. Choosing 20 comes from reading off the cost at the point instead of dividing it by the number of miles. Choosing 5 comes from subtracting the two coordinates (25 − 20) instead of dividing them.
- (b) 8 — Method: the gradient of a straight line is the change in the vertical value divided by the change in the horizontal value between two points on the line. Working: from the origin (0, 0) to (5, 40) the vertical change is 40 − 0 = 40 and the horizontal change is 5 − 0 = 5, so the gradient is 40 ÷ 5 = 8, which here means a cost of £8 for each litre. Answer: 8. The distractors: 0.125 comes from dividing the horizontal change by the vertical change, 5 ÷ 40, which gives litres per pound instead of the gradient; 40 comes from reading off the vertical value of the point and calling it the gradient, ignoring the 5 litres it took to reach that cost; 35 comes from subtracting the two coordinates, 40 − 5, instead of dividing them.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (c) A straight line through the origin, rising from left to right — Two quantities are in direct proportion when one is a constant multiple of the other, so their graph is a straight line through the origin: when one quantity is 0 the other is 0 as well, and doubling one doubles the other. A straight line crossing the vertical axis at 5 has a fixed amount added on, so when the horizontal quantity is 0 the vertical quantity is 5, not 0 — a straight line on its own is not enough for direct proportion. A curve that falls steeply and then levels off without touching either axis shows inverse proportion: one quantity grows as the other shrinks, and their product stays the same. A horizontal line at a height of 3 shows a quantity that does not change at all as the other one grows, so it is not proportional to it.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (a) 1.3 — The gradient of a distance-time graph gives the speed. Difference in speed = 4.5 − 3.2 = 1.3 km/h. A student who subtracts the speeds the wrong way round, 3.2 − 4.5, gets −1.3. A student who adds the two speeds instead of comparing them gets 7.7. A student who multiplies the two gradients gets 14.4.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (b) 8 — The gradient of a line through the origin is the y-value divided by the x-value at any point on the line. Using (10, 80): gradient = 80 ÷ 10 = 8.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (c) £310 — Gradient = (210 − 130) ÷ (7 − 3) = 80 ÷ 4 = 20, so the monthly rate is £20. Using C = 20m + c with the point (3, 130): 130 = 60 + c, so c = 70. After 12 months: C = 20 × 12 + 70 = 240 + 70 = £310.
- (d) 20 — Gradient = change in T ÷ change in t = (140 − 60) ÷ (6 − 2) = 80 ÷ 4 = 20. A student who subtracts in the wrong order gets −20. A student who divides 80 by 2 instead of 4 gets 40. A student who wrongly treats the line as passing through the origin and uses the point (2, 60) on its own gets 60 ÷ 2 = 30.
- (a) The plumber charges £20 for each extra hour worked — The gradient is the change in C divided by the change in h: (85 − 45) ÷ (3 − 1) = 40 ÷ 2 = £20. On this graph the gradient represents the extra amount charged for each extra hour worked, so the answer is 'The plumber charges £20 for each extra hour worked'. Not dividing by the change in h gives 40, the option that reads 'charges £40 for each extra hour worked' — that is the total change in cost between the two points, not the rate per hour. Reading off the C-value of the first point, 45, gives the option using £45 — that is the cost of a job lasting 1 hour, not the rate. Treating the gradient as a flat total charge regardless of the time taken misunderstands what a straight-line graph through two different h-values shows: the cost does depend on h, so it cannot be a single fixed total.
- (d) £2.00 — Cost for Printer A = 200 × £0.04 = £8. Cost for Printer B = 200 × £0.05 = £10. Difference = £10 − £8 = £2.00.
Build your own mix at the worksheet builder.