Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A force of 250 N acts on an area of 0.5 m². Using pressure = force ÷ area, work out the pressure, in pascals.
- 2.A cyclist rides 30 km in 1 hour 30 minutes. Work out the average speed of the cyclist in km/h.
- 3.A straight line passes through the points (1, 20) and (5, 8). Work out the gradient of the line.
- 4.Aisha invests £3200 in Account A, which pays 5% compound interest each year. She also invests £3200 in Account B, which pays 3% simple interest each year. Work out how much more Account A is worth than Account B after 2 years.
- 5.Two mathematically similar cylinders have heights in the ratio 3 : 4. Write the ratio of their volumes in its simplest form.
- 6.A map has a scale of 1 : 20 000. A different map of the same area has a scale of 1 : 80 000. A lake's shoreline is drawn 5 cm long on the first map. Work out the length of the same shoreline on the second map, in centimetres.
- 7.Two taxi firms show their charges on straight-line graphs, with the cost in pounds on the vertical axis and the distance in miles on the horizontal axis. Firm A's line passes through (0, 4) and (5, 14). Firm B's line passes through (0, 6) and (5, 21). Work out which firm charges more per mile.
- 8.A cyclist travels 18 km in 45 minutes. Work out the average speed, in km/h.
- 9.Last week Priya worked 5 shifts of 7 hours. This week she worked 4 shifts of 8 hours. Write the number of hours she worked last week as a fraction of the number of hours she worked this week.
- 10.A shop sells rope by the metre. 3 m costs £7.50 and 5 m costs £11.00. Does this data show that the cost is directly proportional to the length of rope bought? Choose the correct verdict and reason.
- 11.A conversion graph between kilometres and miles passes through the origin and the point (50, 31), with the number of kilometres on the horizontal axis and the number of miles on the vertical axis. Work out the number of miles equivalent to 1 kilometre.
- 12.Triangle ABC has a right angle at C. AC = 3 cm and BC = 4 cm. Triangle ABC is mathematically similar to triangle PQR, with angle B corresponding to angle Q. Work out the value of tan(angle Q).
- 13.Jamal invests £600 in a savings account paying 3% simple interest per year. Work out the total amount in the account after 4 years.
- 14.y is inversely proportional to x. When x = 5, y = 8. Work out the value of y when x = 10.
- 15.A runner's speed is 8 m/s. Given that there are 3600 seconds in an hour and 1000 metres in a kilometre, work out the runner's speed in km/h.
Answer key
- (c) 500 — Pressure = force ÷ area = 250 ÷ 0.5 = 500 pascals. Getting 125 comes from multiplying the force by the area instead of dividing (250 × 0.5 = 125). Getting 249.5 comes from subtracting the area from the force instead of dividing. Getting 50 comes from misreading the area as 5 m² instead of 0.5 m² and dividing 250 by 5.
- (d) 20 km/h — Method: average speed = total distance ÷ total time, with the time written in hours. Working: 1 hour 30 minutes = 1.5 hours, and 30 ÷ 1.5 = 20. Answer: 20 km/h. The distractors: 45 km/h comes from multiplying 30 by 1.5 instead of dividing; 15 km/h comes from dividing by 2, as if the ride had taken 2 hours; 30 km/h comes from dividing by the whole hour only and ignoring the extra 30 minutes.
- (b) −3 — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, with both changes taken in the same direction along the line. Working: going from (1, 20) to (5, 8) the change in y is 8 − 20 = −12 and the change in x is 5 − 1 = 4, so the gradient is −12 ÷ 4 = −3. Answer: −3, and the negative sign is expected because the line falls from left to right. The distractors: 3 comes from subtracting the smaller y from the larger, 20 − 8 = 12, while still taking the x values from left to right, which loses the minus sign that says the line falls; −12 is the change in y left undivided by the change in x of 4; −1/3 comes from dividing the change in x by the change in y, 4 ÷ (−12), turning the gradient upside down.
- (c) £136 — 5% interest each year means the value becomes 100% + 5% = 105% of the previous year's value, and 105% = 1.05, so the multiplier is 1.05. Account A: £3200 × 1.05 × 1.05 = £3528. Account B (simple interest): £3200 + 2 × (£3200 × 0.03) = £3392. The difference is £3528 − £3392 = £136. (£128 comes from working out Account A with simple interest too, instead of compound: £3200 + 2 × (£3200 × 0.05) = £3520, then £3520 − £3392 = £128. £3528 is the value of Account A on its own, not the difference between the two accounts. £3392 is the value of Account B on its own, not the difference.)
- (c) 27 : 64 — For similar solids, the ratio of volumes is the ratio of lengths cubed: 3³ : 4³ = 27 : 64. 3 : 4 comes from using the height ratio itself as the volume ratio, without cubing it at all. 9 : 16 comes from squaring each part instead of cubing (3² : 4²) — squaring is the rule for area, not volume. 27 : 4 comes from cubing only the first part of the ratio (3³ = 27), and leaving the second part uncubed.
- (c) 1.25 cm — Method: find the real length using the first map's scale, then use the second map's scale to find its drawn length. Working: real length = 5 × 20 000 = 100 000 cm. On the second map: 100 000 ÷ 80 000 = 1.25 cm. Wrong options: 20 cm comes from inverting the ratio of the two scales (5 × 80 000 ÷ 20 000); 5 cm comes from wrongly assuming the length looks the same on both maps; 12.5 cm comes from dropping a zero from the second scale factor and dividing by 8 000 instead of 80 000 (100 000 ÷ 8 000).
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (b) 24 km/h — First convert 45 minutes to hours: 45 ÷ 60 = 0.75 hours. Then divide the distance by the time: 18 ÷ 0.75 = 24 km/h. Reading 45 minutes as 0.45 hours (writing the minutes after the decimal point instead of dividing by 60) gives 18 ÷ 0.45 = 40 km/h. Working out 18 × 0.75 = 13.5 multiplies by the time instead of dividing. Working out 18 ÷ 45 = 0.4 divides by 45 without ever converting the minutes to hours. The cyclist's average speed is 24 km/h.
- (a) 35/32 — Work out each weekly total first. Last week: 5 × 7 = 35 hours. This week: 4 × 8 = 32 hours. Last week's total is being written as a fraction of this week's total, so last week goes on the top and this week goes on the bottom, giving 35/32. The two totals share no common factor, so the fraction cannot be cancelled. It is greater than 1, which says that Priya worked more hours last week than this week.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (a) 0.62 miles — The gradient of the line is the change in miles divided by the change in kilometres: 31 ÷ 50 = 0.62, so 1 kilometre converts to 0.62 miles. Dividing the wrong way round, 50 ÷ 31 = 1.612..., rounds to 1.61 miles — that finds how many kilometres are in 1 mile, not the reverse. Doubling the gradient, 1.24 miles, comes from using 62 ÷ 50 instead of 31 ÷ 50. Reading off the y-coordinate of the given point without dividing by the x-coordinate gives 31.00 miles, which is the number of miles for 50 kilometres, not for 1 kilometre.
- (a) 3/4 — Method: use tan = opposite ÷ adjacent in the right-angled triangle to find tan(angle B), then use the fact that corresponding angles in similar shapes are equal, so they have equal trigonometric ratios. Working: for angle B, the opposite side is AC = 3 cm and the adjacent side is BC = 4 cm, so tan(angle B) = 3/4. Angle Q corresponds to angle B, so angle Q = angle B and tan(angle Q) = 3/4. Answer: 3/4. 4/3 comes from writing the ratio upside down, adjacent ÷ opposite, giving the reciprocal instead of the tangent. 3/7 and 4/7 come from treating 3 and 4 as if they were parts of a total of 3 + 4 = 7, which is how a ratio is shared, not how a trigonometric ratio is formed.
- (c) £672 — Simple interest per year = 3% of £600 = £18. Over 4 years the interest is 18 × 4 = £72. Total in the account = £600 + £72 = £672. A student who gives just the interest, without adding it to the principal, writes £72. A student who adds only one year's interest instead of four gets £600 + £18 = £618. A student who wrongly compounds the interest each year gets 600 × 1.03⁴ = £675.31.
- (a) 4 — Method: for inverse proportion, x × y always stays the same value. Working: when x = 5 and y = 8, the constant is 5 × 8 = 40. When x = 10, y = 40 ÷ 10 = 4. So y = 4. Distractor 16 comes from treating the relationship as direct proportion instead of inverse, working out 8 × 10 ÷ 5. Distractor 3 comes from assuming y decreases by the same amount that x increases, an additive rather than proportional idea. Distractor 0.8 comes from dividing the given y-value, 8, by the new x-value, 10, without first finding the constant.
- (a) 28.8 km/h — Method: first change metres per second into metres per hour, then change metres into kilometres. Working: 8 × 3600 = 28800 metres per hour, then 28800 ÷ 1000 = 28.8 km/h. So the runner's speed is 28.8 km/h. Distractor 28800 km/h comes from stopping after the first step and forgetting to change metres into kilometres. Distractor 2.22 km/h comes from dividing by 3600 instead of multiplying, then multiplying by 1000. Distractor 2.88 km/h comes from using 360 instead of 3600 seconds in an hour, missing a zero.
Build your own mix at the worksheet builder.