- 1.Water flows into a tank at a constant rate. After 8 minutes the tank holds 200 litres. Write the ratio of time in minutes to volume in litres, in its simplest form.
- 2.Map A has a scale of 1 : 25000 and Map B has a scale of 1 : 50000, both showing the same area. A real distance of 10 km is measured on each map. On which map does this distance appear as the longer length, and how long is it on that map, in centimetres?
- 3.A cyclist rides at a steady speed of 20 mph. Given that 1 mile ≈ 1.6 km, work out the cyclist's speed in km/h.
- 4.A metal has a density of 7.8 g/cm³. Work out the density of the metal in kg/m³.
- 5.A tap fills a tank at a rate of 15 litres per minute. Given that 1 litre = 1000 cm³, work out the rate at which the tank fills in cm³ per second.
- 6.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 7.A photo is enlarged so that its new width is 1.4 times its original width. Write the multiplier that would scale the new width back down to the original width, as a fraction in its simplest form.
- 8.6 identical printers can print a batch of exam papers in 40 minutes, all working at the same rate. Working at the same rate, work out how many minutes 4 of these printers would take to print the same batch.
- 9.A film runs for 2.25 hours. Work out the length of the film in minutes.
- 10.A shop sells rope by the metre. 3 m costs £7.50 and 5 m costs £11.00. Does this data show that the cost is directly proportional to the length of rope bought? Choose the correct verdict and reason.
- 11.Two taxi firms show their charges on straight-line graphs, with the cost in pounds on the vertical axis and the distance in miles on the horizontal axis. Firm A's line passes through (0, 4) and (5, 14). Firm B's line passes through (0, 6) and (5, 21). Work out which firm charges more per mile.
- 12.The value of a motorbike falls by 12% each year. The motorbike is worth £3200 now. Write down the calculation that gives its value after 3 years.
- 13.A shop sells ribbon by the metre. 2 m costs £3.00, 4 m costs £6.00, and 7 m costs £10.50. Does this data show that the cost is directly proportional to the length of ribbon bought? Choose the correct verdict and reason.
- 14.y is directly proportional to x. When x = 5, y = 18. Work out the value of y when x = 15.
- 15.A crate exerts a force of 84 N on the floor through a base with an area of 2.4 m². Work out the pressure on the floor, in N/m².
Answer key
- (b) 1:25 — Write the ratio time : volume using the numbers in the question: 8 : 200. Divide both parts by their highest common factor, 8, to give 1 : 25. (25:1 comes from writing the ratio the wrong way round, volume : time. 8:25 comes from dividing only the volume by 8 and leaving the time unchanged. 25:8 is that same mistake written the wrong way round.)
- (c) Map A, where the distance is 40 cm — 10 km = 1,000,000 cm. On Map A: 1000000 ÷ 25000 = 40 cm. On Map B: 1000000 ÷ 50000 = 20 cm. Since 40 cm is longer than 20 cm, the same real distance appears longer on Map A, the map with the smaller scale number. 'Map B, where the distance is 20 cm' has the correct working for Map B but names the wrong map as the one with the longer length. 'Map A, where the distance is 20 cm' correctly identifies Map A but pairs it with Map B's length. 'Map B, where the distance is 40 cm' correctly identifies Map A's length but attaches it to the wrong map.
- (c) 32 km/h — Method: to change mph into km/h, multiply by the number of kilometres in a mile. Working: 20 × 1.6 = 32 km/h. So the cyclist's speed is 32 km/h. Distractor 12.5 km/h comes from dividing by 1.6 instead of multiplying. Distractor 21.6 km/h comes from adding 1.6 instead of multiplying by it. Distractor 20 km/h comes from not converting the units at all.
- (c) 7800 kg/m³ — Method: build the conversion factor from the two unit changes separately — one for the mass, one for the volume. Working: 1 kg = 1000 g, so the mass figure is divided by 1000; 1 m = 100 cm, so 1 m³ = 100 × 100 × 100 = 1000000 cm³ and the volume figure is multiplied by 1000000. The density figure is therefore multiplied by 1000000 ÷ 1000 = 1000, giving 7.8 × 1000 = 7800. So the density of the metal is 7800 kg/m³. Distractor 780 kg/m³ comes from multiplying by 100 instead of 1000. Distractor 78000 kg/m³ comes from multiplying by 10000, an extra zero. Distractor 7.8 kg/m³ comes from not converting the units at all.
- (d) 250 cm³/s — Method: first change litres per minute into cm³ per minute, then change per minute into per second. Working: 15 × 1000 = 15000 cm³ per minute, then 15000 ÷ 60 = 250 cm³ per second. So the tank fills at 250 cm³ per second. Distractor 15000 cm³/s comes from stopping after the first step and forgetting to change minutes into seconds. Distractor 900000 cm³/s comes from multiplying by 60 instead of dividing. Distractor 2500 cm³/s comes from dividing by 6 instead of 60.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (b) 5/7 — The enlargement multiplier is 1.4, which as a fraction is 7/5. To reverse an enlargement, use the reciprocal of the multiplier: flip 7/5 to get 5/7. 7/5 comes from using the enlargement multiplier again, instead of reversing it. 3/5 comes from treating the reverse as 'give back the extra amount', working out 1 − (1.4 − 1) = 0.6, instead of using the reciprocal. 5/2 comes from ignoring the whole number in 1.4 and inverting only the decimal part, 0.4, as if it were the whole multiplier.
- (a) 60 minutes — Method: for inverse proportion, printers × time is constant. Working: 6 × 40 = 240 (the constant). With 4 printers: 240 ÷ 4 = 60 minutes. Wrong options: 26.7 minutes comes from treating the relationship as direct proportion, scaling the time down as printers decrease (40 × 4 ÷ 6); 24 minutes comes from multiplying the two printer counts together instead of using the constant; 40 minutes comes from not adjusting the time at all for the change in printers.
- (a) 135 minutes — Method: to change hours into minutes, multiply by 60. Working: 2.25 × 60 = 135 minutes. So the film runs for 135 minutes. Distractor 145 minutes comes from reading the '.25' as 25 minutes instead of a quarter of an hour, giving 2 hours 25 minutes. Distractor 225 minutes comes from multiplying by 100 instead of 60. Distractor 150 minutes comes from rounding 2.25 hours to 2.5 hours before converting.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (d) 3200 × 0.88³ — A fall of 12% leaves 88% of the value, because 100 − 12 = 88, and 88% written as a decimal multiplier is 0.88. Decay repeats that multiplier once for each year, so over 3 years it is applied three times: 0.88 × 0.88 × 0.88, which is written 0.88³. The calculation is therefore 3200 × 0.88³. Adding the percentages to make a single fall of 36% would be wrong, because each year's fall is taken from a smaller value than the year before.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
- (b) 35 N/m² — Pressure = force ÷ area. 84 ÷ 2.4 = 35 N/m². 201.6 N/m² comes from multiplying the force by the area instead of dividing (84 × 2.4). 81.6 N/m² comes from subtracting the area from the force (84 − 2.4) instead of dividing. 0.03 N/m² comes from dividing the area by the force instead of the force by the area (2.4 ÷ 84).