Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A conversion graph between kilometres and miles passes through the origin and the point (50, 31), with the number of kilometres on the horizontal axis and the number of miles on the vertical axis. Work out the number of miles equivalent to 1 kilometre.
- 2.A straight-line graph shows the distance travelled, d kilometres, against the time taken, t hours, for a cyclist. The line passes through the origin and has a gradient of 18. Write down what the gradient of this line represents.
- 3.A sculptor makes two mathematically similar statues. The smaller statue is 20 cm tall and 80 ml of varnish covers its surface. The larger statue is 50 cm tall. Work out how much varnish is needed to cover the surface of the larger statue.
- 4.Ffion is paid £11.20 per hour. She works 6 hours on Monday and 4.5 hours on Tuesday. Work out her total pay for the two days.
- 5.A concrete block exerts a force of 45 N on the ground through a base with an area of 0.05 m². Work out the pressure on the ground, in N/m².
- 6.The time taken for a train journey is inversely proportional to the average speed of the train. At an average speed of 60 km/h the journey takes 2 hours. Work out the time taken at an average speed of 40 km/h.
- 7.Two mathematically similar water bottles have a volume scale factor of 8 from the smaller bottle to the larger bottle. Work out the surface area scale factor from the smaller bottle to the larger bottle.
- 8.A shop sells ribbon by the metre. 2 m costs £3.00, 4 m costs £6.00, and 7 m costs £10.50. Does this data show that the cost is directly proportional to the length of ribbon bought? Choose the correct verdict and reason.
- 9.Priya is paid £58.50 for working 7.5 hours on a Saturday. Work out her rate of pay, in £ per hour.
- 10.Water flows into a tank at a constant rate. After 8 minutes the tank holds 200 litres. Write the ratio of time in minutes to volume in litres, in its simplest form.
- 11.A shop sells rope by the metre. 3 m costs £7.50 and 5 m costs £11.00. Does this data show that the cost is directly proportional to the length of rope bought? Choose the correct verdict and reason.
- 12.Jamal invests £600 in a savings account paying 3% simple interest per year. Work out the total amount in the account after 4 years.
- 13.A water butt is being filled from a hosepipe at a constant rate while a small leak drains water out at a constant rate, giving a constant net rate of change. The volume of water in the butt, V litres, is shown on a straight-line graph against time, t minutes. The line passes through the points (5, 20) and (15, 60). The butt is empty at t = 0. Work out how many minutes it takes to reach a volume of 100 litres.
- 14.A runner's speed is 8 m/s. Given that there are 3600 seconds in an hour and 1000 metres in a kilometre, work out the runner's speed in km/h.
- 15.A cartographer is choosing a scale for a map to show a small park in as much detail as possible. Which of these scales would show the MOST detail — 1 : 500, 1 : 5000, or 1 : 50 000? Give the correct scale and reason.
Answer key
- (a) 0.62 miles — The gradient of the line is the change in miles divided by the change in kilometres: 31 ÷ 50 = 0.62, so 1 kilometre converts to 0.62 miles. Dividing the wrong way round, 50 ÷ 31 = 1.612..., rounds to 1.61 miles — that finds how many kilometres are in 1 mile, not the reverse. Doubling the gradient, 1.24 miles, comes from using 62 ÷ 50 instead of 31 ÷ 50. Reading off the y-coordinate of the given point without dividing by the x-coordinate gives 31.00 miles, which is the number of miles for 50 kilometres, not for 1 kilometre.
- (d) The cyclist's speed, in kilometres per hour — Method: on any straight-line graph the gradient is the change in the quantity on the vertical axis for each 1 unit of the quantity on the horizontal axis, so its meaning is read off the two axis labels. Working: the vertical axis is distance in kilometres and the horizontal axis is time in hours, so the gradient counts kilometres for each hour, and distance for each hour is speed. Answer: the cyclist's speed, in kilometres per hour. The distractors: 'the total distance the cyclist travels, in kilometres' reads the gradient as a value taken off the vertical axis, but a gradient is a rate and no end point of the journey has been given; 'the time the cyclist takes, in hours' names the horizontal axis, which is the quantity the gradient divides by rather than the gradient itself; 'the distance the cyclist travels in 18 hours' treats the 18 as a value of t, when 18 is the steepness of the line and not a point on it.
- (d) 500 ml — Varnish covers a surface, so the amount needed scales with the area scale factor, which is the square of the length scale factor. The length scale factor is 50 ÷ 20 = 2.5, so the area scale factor is 2.5 × 2.5 = 6.25. The varnish needed for the larger statue is 80 × 6.25 = 500 ml. Using 2.5 on its own would scale a length, not a surface.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (b) 900 N/m² — Pressure = force ÷ area, so 45 ÷ 0.05 = 900 N/m². Working out 45 ÷ 5 = 9 misplaces the decimal point in the area, treating 0.05 m² as 5 m². Working out 45 × 0.05 = 2.25 multiplies force and area together instead of dividing. Working out 45 + 0.05 = 45.05 simply adds the two given numbers, which does not give a pressure at all. The pressure on the ground is 900 N/m².
- (c) 3 hours — Method: inverse proportion means speed × time is constant for the journey, so find that constant and divide it by the new speed. Working: 60 × 2 = 120, which is the distance in kilometres; at 40 km/h the time is 120 ÷ 40 = 3 hours. Answer: 3 hours. The distractors: 1.5 hours is the ratio of the speeds, 60 ÷ 40, given as a time instead of being used to scale the original 2 hours; 1 hour 20 minutes comes from treating time as directly proportional to speed, 2 × 40 ÷ 60, which has the slower train arriving sooner; 2 hours comes from finding the constant 120 and then dividing it by the original 60 km/h again, so the time never changes.
- (b) 4 — Method: find the length scale factor by taking the cube root of the volume scale factor, then square it to get the area scale factor. Working: 8 = 2³, so the length scale factor is 2, and the area scale factor is 2² = 4. Answer: 4. 8 comes from using the volume scale factor itself as if it were the area scale factor. 64 comes from squaring the volume scale factor, 8² = 64, instead of first taking its cube root. 2 comes from correctly finding the length scale factor but then forgetting to square it.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (b) 1:25 — Write the ratio time : volume using the numbers in the question: 8 : 200. Divide both parts by their highest common factor, 8, to give 1 : 25. (25:1 comes from writing the ratio the wrong way round, volume : time. 8:25 comes from dividing only the volume by 8 and leaving the time unchanged. 25:8 is that same mistake written the wrong way round.)
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (c) £672 — Simple interest per year = 3% of £600 = £18. Over 4 years the interest is 18 × 4 = £72. Total in the account = £600 + £72 = £672. A student who gives just the interest, without adding it to the principal, writes £72. A student who adds only one year's interest instead of four gets £600 + £18 = £618. A student who wrongly compounds the interest each year gets 600 × 1.03⁴ = £675.31.
- (d) 25 — Gradient = (60 − 20) ÷ (15 − 5) = 40 ÷ 10 = 4 litres per minute. Since the butt is empty at t = 0, V = 4t. Setting V = 100 gives t = 100 ÷ 4 = 25 minutes.
- (a) 28.8 km/h — Method: first change metres per second into metres per hour, then change metres into kilometres. Working: 8 × 3600 = 28800 metres per hour, then 28800 ÷ 1000 = 28.8 km/h. So the runner's speed is 28.8 km/h. Distractor 28800 km/h comes from stopping after the first step and forgetting to change metres into kilometres. Distractor 2.22 km/h comes from dividing by 3600 instead of multiplying, then multiplying by 1000. Distractor 2.88 km/h comes from using 360 instead of 3600 seconds in an hour, missing a zero.
- (b) 1 : 500 — smallest real distance per cm (5 m), most detail — Method: compare what one centimetre represents in real life for each scale — the scale with the smallest real distance per cm shows the most detail. Working: for 1 : 500, 1 cm represents 500 cm (5 m); for 1 : 5000, 1 cm represents 50 m; for 1 : 50 000, 1 cm represents 500 m. Since 5 m is the smallest, 1 : 500 shows the most detail. Wrong options: '1 : 50 000 — covers the largest real area' wrongly assumes covering more area means more detail, when it is the opposite; '1 : 5000 — the middle value' wrongly assumes the middle scale is automatically the most balanced; '1 : 500 — covers the largest real distance' picks the correct scale but states an incorrect fact, since 1 : 500 actually covers the smallest real distance per cm.
Build your own mix at the worksheet builder.