Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A 750 g box of cereal costs £2.70. A 500 g box of the same cereal costs £1.95. Work out which box is better value, and its cost per 100 g.
- 2.A gym charges members a joining fee plus a fixed amount per month. The total amount paid, C pounds, is shown on a straight-line graph against the number of months, m. The line passes through the points (3, 130) and (7, 210). Work out the total amount a member will have paid after 12 months.
- 3.A runner's speed is 8 m/s. Given that there are 3600 seconds in an hour and 1000 metres in a kilometre, work out the runner's speed in km/h.
- 4.A garden centre sells two mathematically similar sacks of grass seed. The amount of lawn a sack can treat is proportional to the volume of seed inside it. The smaller sack is 20 cm tall and treats a lawn of area 30 m². The larger sack is 40 cm tall. A gardener needs to treat a lawn with an area of 500 m² using only the larger sacks. Work out the minimum number of larger sacks needed.
- 5.6 identical printers can print a batch of exam papers in 40 minutes, all working at the same rate. Working at the same rate, work out how many minutes 4 of these printers would take to print the same batch.
- 6.A straight-line graph shows the distance travelled, d kilometres, against the time taken, t hours, for a cyclist. The line passes through the origin and has a gradient of 18. Write down what the gradient of this line represents.
- 7.A statue exerts a downward force of 68.4 N on its base, which has an area of 2.85 m². Work out the pressure that the statue exerts on its base, in N/m².
- 8.In a choir of 30 singers, 40% are altos and the rest are sopranos. Write the number of sopranos as a fraction of the number of altos. Give your answer in its simplest form.
- 9.In a fruit squash mix, the ratio of squash to water is 2 : 9. A shop wants to make up the mix using 3.4 litres of squash. Work out how many litres of water are needed.
- 10.Write 3 hours 45 minutes as a decimal number of hours.
- 11.A 1.5 kg bag of pasta costs £2.85 and a 2.4 kg bag of the same pasta costs £4.32. Work out which bag gives better value for money.
- 12.Priya is paid £58.50 for working 7.5 hours on a Saturday. Work out her rate of pay, in £ per hour.
- 13.Two broadband providers show their monthly cost on straight-line graphs, with the cost in pounds on the vertical axis and the data used in gigabytes on the horizontal axis. Provider X's line passes through (0, 15) and (100, 35). Provider Y's line passes through (0, 5) and (100, 45). Work out which provider is cheaper for a customer who uses 40 gigabytes in a month.
- 14.Two mathematically similar garden ponds have surface areas of 12 m² and 27 m². The fencing needed to go around the smaller pond costs £96. Assuming the cost of fencing is proportional to the perimeter of the pond, work out the cost of fencing the larger pond.
- 15.A film runs for 2.25 hours. Work out the length of the film in minutes.
Answer key
- (d) The 750 g box, at 36p per 100 g — Work out the cost per 100 g of each box. 750 g box: 270p ÷ 7.5 = 36p per 100 g. 500 g box: 195p ÷ 5 = 39p per 100 g. The lower cost per 100 g is the better value, so the 750 g box at 36p per 100 g is the answer. Choosing the 500 g box at 39p per 100 g gets the maths right but picks the higher unit price, not realising a smaller cost per 100 g is the better deal. Choosing the 500 g box because £1.95 is lower than £2.70 compares the total prices without allowing for the different pack sizes at all. Working out 270 ÷ 5 = 54p divides the 750 g box's price by the wrong number of hundred-grams (the 500 g box's), giving a rate that belongs to neither box. The 750 g box, at 36p per 100 g, is the better value.
- (c) £310 — Gradient = (210 − 130) ÷ (7 − 3) = 80 ÷ 4 = 20, so the monthly rate is £20. Using C = 20m + c with the point (3, 130): 130 = 60 + c, so c = 70. After 12 months: C = 20 × 12 + 70 = 240 + 70 = £310.
- (a) 28.8 km/h — Method: first change metres per second into metres per hour, then change metres into kilometres. Working: 8 × 3600 = 28800 metres per hour, then 28800 ÷ 1000 = 28.8 km/h. So the runner's speed is 28.8 km/h. Distractor 28800 km/h comes from stopping after the first step and forgetting to change metres into kilometres. Distractor 2.22 km/h comes from dividing by 3600 instead of multiplying, then multiplying by 1000. Distractor 2.88 km/h comes from using 360 instead of 3600 seconds in an hour, missing a zero.
- (c) 3 — Method: find the height scale factor, cube it to find the volume (and coverage) scale factor, use it to find one large sack's coverage, then divide the total lawn area by this and round up to a whole number of sacks. Working: height scale factor = 40 ÷ 20 = 2, so coverage scale factor = 2³ = 8, and each large sack covers 30 × 8 = 240 m². 500 ÷ 240 = 2.08…, which rounds UP to 3 whole sacks. Answer: 3. 2 comes from correctly finding that each large sack covers 240 m², but then rounding 500 ÷ 240 down instead of up, which would leave part of the lawn untreated. 5 comes from squaring the height scale factor (2² = 4) instead of cubing it, giving a coverage of only 30 × 4 = 120 m² per sack. 17 comes from forgetting to scale the coverage at all and dividing 500 by the smaller sack's coverage of 30 m².
- (a) 60 minutes — Method: for inverse proportion, printers × time is constant. Working: 6 × 40 = 240 (the constant). With 4 printers: 240 ÷ 4 = 60 minutes. Wrong options: 26.7 minutes comes from treating the relationship as direct proportion, scaling the time down as printers decrease (40 × 4 ÷ 6); 24 minutes comes from multiplying the two printer counts together instead of using the constant; 40 minutes comes from not adjusting the time at all for the change in printers.
- (d) The cyclist's speed, in kilometres per hour — Method: on any straight-line graph the gradient is the change in the quantity on the vertical axis for each 1 unit of the quantity on the horizontal axis, so its meaning is read off the two axis labels. Working: the vertical axis is distance in kilometres and the horizontal axis is time in hours, so the gradient counts kilometres for each hour, and distance for each hour is speed. Answer: the cyclist's speed, in kilometres per hour. The distractors: 'the total distance the cyclist travels, in kilometres' reads the gradient as a value taken off the vertical axis, but a gradient is a rate and no end point of the journey has been given; 'the time the cyclist takes, in hours' names the horizontal axis, which is the quantity the gradient divides by rather than the gradient itself; 'the distance the cyclist travels in 18 hours' treats the 18 as a value of t, when 18 is the steepness of the line and not a point on it.
- (a) 24 N/m² — Pressure = force ÷ area. 68.4 ÷ 2.85 = 24 N/m². 194.94 N/m² comes from multiplying the force by the area instead of dividing (68.4 × 2.85). 65.55 N/m² comes from subtracting the area from the force (68.4 − 2.85) instead of dividing. 0.04 N/m² comes from dividing the area by the force instead of the force by the area (2.85 ÷ 68.4).
- (d) 3/2 — Work out the number of altos: 40% of 30 = 12. The rest are sopranos, so there are 30 − 12 = 18 sopranos. Form the fraction 18/12; both numbers share a factor of 6, so 18 ÷ 6 = 3 and 12 ÷ 6 = 2, giving 3/2. 2/3 comes from writing the fraction the wrong way round, as altos over sopranos (12/18). 3/5 comes from comparing the sopranos with the whole choir (18/30), instead of with the altos. 7/3 comes from miscalculating 30 − 12 as 28 instead of 18, then forming 28/12.
- (a) 15.3 litres — Squash : water = 2 : 9, so water is 9 ÷ 2 = 4.5 times the amount of squash. Multiply: 3.4 × 4.5 = 15.3 litres. Using the multiplier upside down — treating squash as 9 ÷ 2 times water, when it is water that is 9 ÷ 2 times squash — and calculating 3.4 × (2 ÷ 9) gives about 0.8 litres (to 1 d.p.); that would be the squash needed for 3.4 litres of water, not the water needed for 3.4 litres of squash. Adding the difference between the ratio parts, 9 − 2 = 7, to the squash amount, 3.4 + 7 = 10.4, mistakes a ratio for a fixed extra amount. Using the total number of parts, 2 + 9 = 11, so the multiplier 11 ÷ 2 = 5.5, gives 3.4 × 5.5 = 18.7 litres — that finds the total mix from the squash amount, not the water alone.
- (d) 3.75 — 45 minutes is 45 ÷ 60 = 0.75 of an hour, so 3 hours 45 minutes = 3.75 hours. Getting 3.45 comes from writing the minutes directly after the decimal point instead of converting them to a fraction of an hour. Getting 3.67 comes from misreading 45 minutes as 40 minutes and converting 40 ÷ 60 instead. Getting 4.15 comes from rounding 45 minutes up to the next whole hour and adding the remainder as if it were more minutes past that hour.
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (b) Provider Y — £21.00 against Provider X's £23.00 — Provider X's gradient is (35 − 15) ÷ 100 = 0.2, so cost = 15 + 0.2 × 40 = 15 + 8 = £23.00. Provider Y's gradient is (45 − 5) ÷ 100 = 0.4, so cost = 5 + 0.4 × 40 = 5 + 16 = £21.00. £21.00 is less than £23.00, so Provider Y is cheaper: 'Provider Y — £21.00 against Provider X's £23.00'. Getting both costs right but naming Provider X as cheaper compares the two numbers the wrong way round — £23.00 is more than £21.00, not less. Comparing only the fixed fees, £15.00 and £5.00, ignores the cost of the 40 gigabytes actually used. Reading off the costs at 100 gigabytes, £35.00 and £45.00, directly from the graph answers a different usage from the 40 gigabytes the question asks about.
- (d) £144 — Method: find the length (perimeter) scale factor by taking the square root of the area ratio, then apply it to the cost. Working: 12 : 27 simplifies to 4 : 9, and the square root of each part gives the length ratio 2 : 3, so the scale factor from the smaller to the larger pond is 3 ÷ 2 = 1.5. Cost = £96 × 1.5 = £144. Answer: £144. £216 comes from using the area ratio itself as the cost ratio, £96 × (27 ÷ 12) = £216, without taking the square root. £64 comes from using the length ratio the wrong way round, £96 × (2 ÷ 3) = £64. £111 comes from simply adding the difference in area, 27 − 12 = 15, onto the original cost, £96 + £15 = £111, instead of scaling proportionally.
- (a) 135 minutes — Method: to change hours into minutes, multiply by 60. Working: 2.25 × 60 = 135 minutes. So the film runs for 135 minutes. Distractor 145 minutes comes from reading the '.25' as 25 minutes instead of a quarter of an hour, giving 2 hours 25 minutes. Distractor 225 minutes comes from multiplying by 100 instead of 60. Distractor 150 minutes comes from rounding 2.25 hours to 2.5 hours before converting.
Build your own mix at the worksheet builder.