Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A metal cylinder has a mass of 356.5 g and a volume of 47 cm³. Work out the density of the cylinder, in g/cm³, to 1 decimal place.
- 2.A crate exerts a force of 84 N on the floor through a base with an area of 2.4 m². Work out the pressure on the floor, in N/m².
- 3.A scale drawing of a garden uses a scale of 1 : 20. Write down a formula for the real length, L metres, in terms of the length on the drawing, d centimetres, given that 1 metre = 100 centimetres.
- 4.A mobile phone tariff is shown on a straight-line graph with the monthly cost, C pounds, on the vertical axis and the amount of data used, g gigabytes, on the horizontal axis. The line passes through (0, 10) and (8, 26). Work out the gradient and say what it represents.
- 5.A cyclist rides at an average speed of 24 km/h for 1 hour 15 minutes. Work out the distance travelled, in km.
- 6.Square P has sides of length 3 cm. Square Q has sides of length 12 cm. Write the ratio of the area of square P to the area of square Q in its simplest form.
- 7.A map has a scale of 1 : 1000. A road is 300 m long in real life. Work out the length of the road on the map, in centimetres.
- 8.A kettle uses 2.1 kWh of energy. A toaster uses 0.9 kWh of energy. Write the energy used by the kettle as a fraction of the energy used by the toaster, giving your answer in its simplest form.
- 9.Two broadband providers show their monthly cost on straight-line graphs, with the cost in pounds on the vertical axis and the data used in gigabytes on the horizontal axis. Provider X's line passes through (0, 15) and (100, 35). Provider Y's line passes through (0, 5) and (100, 45). Work out which provider is cheaper for a customer who uses 40 gigabytes in a month.
- 10.A concrete block exerts a force of 45 N on the ground through a base with an area of 0.05 m². Work out the pressure on the ground, in N/m².
- 11.Two quantities x and y are in direct proportion. When x = 8, the value of y is 20. Work out the value of y when x = 14.
- 12.A cyclist rides 19.3 km in 47 minutes. Work out her average speed, in km/h, to 1 decimal place.
- 13.A conversion graph between kilometres and miles passes through the origin and the point (50, 31), with the number of kilometres on the horizontal axis and the number of miles on the vertical axis. Work out the number of miles equivalent to 1 kilometre.
- 14.A cyclist rides 30 km in 1 hour 30 minutes. Work out the average speed of the cyclist in km/h.
- 15.The value of a rare coin increases by 12% each year. The coin is currently worth £270. Work out the value of the coin after 2 years, giving your answer to the nearest penny.
Answer key
- (c) 7.6 — Density = mass ÷ volume, so 356.5 ÷ 47 = 7.585..., which rounds to 7.6 g/cm³ (1 d.p.). (0.1 comes from dividing the volume by the mass instead of the mass by the volume, the wrong way round. 7.5 comes from rounding 7.585 down instead of up to 1 decimal place. 403.5 comes from adding the mass and the volume instead of dividing.)
- (b) 35 N/m² — Pressure = force ÷ area. 84 ÷ 2.4 = 35 N/m². 201.6 N/m² comes from multiplying the force by the area instead of dividing (84 × 2.4). 81.6 N/m² comes from subtracting the area from the force (84 − 2.4) instead of dividing. 0.03 N/m² comes from dividing the area by the force instead of the force by the area (2.4 ÷ 84).
- (c) L = d/5 — The scale 1 : 20 means each cm on the drawing represents 20 cm in real life, so the real length in cm is 20d. Converting to metres by dividing by 100: L = 20d/100 = d/5.
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (c) 30 km — First convert 1 hour 15 minutes to hours: 15 minutes is a quarter of an hour, so the time is 1.25 hours. Then multiply by the speed: 24 × 1.25 = 30 km. Reading 15 minutes as 0.15 hours (writing the minutes after the decimal point instead of as a fraction of 60) gives 24 × 1.15 = 27.6 km. Working out 24 × 75 = 1800 multiplies by the number of minutes instead of converting to hours first. Working out 24 ÷ 1.25 = 19.2 divides by the time instead of multiplying. The cyclist travels 30 km.
- (c) 1 : 16 — Work out each area before comparing. Square P has area 3 × 3 = 9 cm². Square Q has area 12 × 12 = 144 cm². The ratio of the areas is 9 : 144, and both parts divide by 9: 9 ÷ 9 = 1 and 144 ÷ 9 = 16, giving 1 : 16. Notice that the sides are in the ratio 1 : 4, and the areas are in the ratio of the squares of those parts, which is what always happens when a length is scaled. Stopping at 1 : 4 would compare the sides and never the areas, and cubing the parts to reach 1 : 64 is the rule for volumes rather than for areas. The order matters too: the question names square P first, so its area must be the first part of the ratio.
- (d) 30 cm — Convert 300 m to centimetres: 300 m = 30 000 cm. The scale 1 : 1000 means the map length is the real length divided by 1000: 30 000 ÷ 1000 = 30, giving 30 cm. Dividing the unconverted 300 (metres, not centimetres) by 1000 gives 0.3 cm, far too small to be a real map measurement. Dividing by 10 000 instead of 1 000 gives 3 cm, ten times too small. Multiplying instead of dividing, 300 × 1000 = 300 000, gives 300 000 cm — using the scale the wrong way round, as if the map were bigger than real life.
- (d) 7/3 — Put the kettle's energy over the toaster's energy: 2.1/0.9. Multiply both numbers by 10 to clear the decimals: 21/9. Divide both by their highest common factor, 3: 21÷3 = 7, 9÷3 = 3, giving 7/3. (3/7 comes from writing the energy values the wrong way round. 4/3 comes from finding the difference, 2.1 − 0.9 = 1.2 kWh, and writing it as a fraction of the toaster's energy, 1.2/0.9. 7/10 comes from comparing the kettle's energy to the total energy used by both appliances, 2.1/3.0.)
- (b) Provider Y — £21.00 against Provider X's £23.00 — Provider X's gradient is (35 − 15) ÷ 100 = 0.2, so cost = 15 + 0.2 × 40 = 15 + 8 = £23.00. Provider Y's gradient is (45 − 5) ÷ 100 = 0.4, so cost = 5 + 0.4 × 40 = 5 + 16 = £21.00. £21.00 is less than £23.00, so Provider Y is cheaper: 'Provider Y — £21.00 against Provider X's £23.00'. Getting both costs right but naming Provider X as cheaper compares the two numbers the wrong way round — £23.00 is more than £21.00, not less. Comparing only the fixed fees, £15.00 and £5.00, ignores the cost of the 40 gigabytes actually used. Reading off the costs at 100 gigabytes, £35.00 and £45.00, directly from the graph answers a different usage from the 40 gigabytes the question asks about.
- (b) 900 N/m² — Pressure = force ÷ area, so 45 ÷ 0.05 = 900 N/m². Working out 45 ÷ 5 = 9 misplaces the decimal point in the area, treating 0.05 m² as 5 m². Working out 45 × 0.05 = 2.25 multiplies force and area together instead of dividing. Working out 45 + 0.05 = 45.05 simply adds the two given numbers, which does not give a pressure at all. The pressure on the ground is 900 N/m².
- (d) 35 — Method: in direct proportion the ratio y : x is the same for every pair, so find the constant and substitute the new value of x. Working: k = 20 ÷ 8 = 2.5, so y = 2.5x; when x = 14, y = 2.5 × 14 = 35. Answer: 35. The distractors: 26 comes from additive thinking — x rises by 6, so 6 is added to y — which would keep the difference constant rather than the ratio; 28 comes from rounding the constant 2.5 down to 2 and working out 2 × 14, which loses the half in the constant; 5.6 comes from using the constant upside down, 8 ÷ 20 = 0.4, and working out 0.4 × 14.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (a) 0.62 miles — The gradient of the line is the change in miles divided by the change in kilometres: 31 ÷ 50 = 0.62, so 1 kilometre converts to 0.62 miles. Dividing the wrong way round, 50 ÷ 31 = 1.612..., rounds to 1.61 miles — that finds how many kilometres are in 1 mile, not the reverse. Doubling the gradient, 1.24 miles, comes from using 62 ÷ 50 instead of 31 ÷ 50. Reading off the y-coordinate of the given point without dividing by the x-coordinate gives 31.00 miles, which is the number of miles for 50 kilometres, not for 1 kilometre.
- (d) 20 km/h — Method: average speed = total distance ÷ total time, with the time written in hours. Working: 1 hour 30 minutes = 1.5 hours, and 30 ÷ 1.5 = 20. Answer: 20 km/h. The distractors: 45 km/h comes from multiplying 30 by 1.5 instead of dividing; 15 km/h comes from dividing by 2, as if the ride had taken 2 hours; 30 km/h comes from dividing by the whole hour only and ignoring the extra 30 minutes.
- (c) £338.69 — To increase by 12% each year, multiply by 1.12 twice. £270 × 1.12 × 1.12 = £338.688, which rounds to £338.69 (nearest penny, since the third decimal place is 8). £334.80 comes from treating the two 12% increases as a single flat 24% increase applied once instead of compounding: £270 × 1.24 = £334.80. £302.40 comes from applying the 12% increase only once, for 1 year instead of 2: £270 × 1.12 = £302.40. £338.68 comes from rounding £338.688 down to the nearest penny instead of up.
Build your own mix at the worksheet builder.