Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.Two mathematically similar logos are printed on a poster. They have areas 20 cm² and 45 cm². Nadia says that the length scale factor from the smaller logo to the larger logo is 45 ÷ 20 = 2.25. Give a reason why Nadia is incorrect, and work out the correct length scale factor.
- 2.A room plan is drawn to a scale of 1 : 50. A wall in the room is 4 m long in real life. Work out the length of the wall on the plan, in centimetres.
- 3.Two mathematically similar rectangles have lengths in the ratio 3 : 5. The area of the smaller rectangle is 27 cm². Work out the area of the larger rectangle.
- 4.In a class, 50% of the students study French, 30% study Spanish and the rest study German. Write down the ratio of French : Spanish : German students, in its simplest form.
- 5.Line P passes through the origin and the point (3, 21). Line Q passes through the origin and the point (5, 45). Both lines represent the distance, in metres, run by an athlete against the time, in seconds. Work out the gradient of the steeper line.
- 6.A map has a scale of 1 : 100 000. Two railway stations are 8 km apart in real life. Work out the distance between the stations on the map, in centimetres.
- 7.Write 45 minutes : 2 hours as a ratio in its simplest form.
- 8.A plumber's charge, C pounds, for a job lasting h hours is shown on a straight-line graph. The line passes through the points (1, 45) and (3, 85). Work out what the gradient of this line represents, in context.
- 9.A parcel of flour has a mass of 750 g. A sack of flour has a mass of 4 kg. Write the mass of the parcel as a fraction of the mass of the sack. Give your answer in its simplest form.
- 10.A beaker holds 500 g of a salt solution of concentration 12%. Pure water is added until the concentration falls to 8%. Work out the mass of water added.
- 11.A sofa costs £800. Its price is increased by 25%. Work out the new price of the sofa.
- 12.A mortar mix is made from sand and cement in the ratio 5 : 3. Write the ratio of sand to the total mix in its simplest form.
- 13.A bottle contains 1.5 litres of juice. Given that 1 litre = 1000 ml, work out the capacity of the bottle in millilitres.
- 14.The number of members of a running club increases from 45 to 54. Work out the percentage increase.
- 15.Priya is paid £58.50 for working 7.5 hours on a Saturday. Work out her rate of pay, in £ per hour.
Answer key
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (d) 8 cm — Convert 4 m to centimetres: 4 m = 400 cm. The scale 1 : 50 means the real object is 50 times the plan, so the plan length is the real length divided by 50: 400 ÷ 50 = 8, giving 8 cm. Using the length in metres instead of centimetres, 4 ÷ 50 = 0.08, gives 0.08 cm, far too small to draw. Misplacing a digit in the division gives 80 cm, ten times too big. Multiplying instead of dividing, 400 × 50 = 20 000, gives 20 000 cm — using the scale in the wrong direction, as if going from plan to real life instead of real life to plan.
- (b) 75 cm² — Areas of similar shapes are in the ratio of the squares of their lengths. Squaring both parts of 3 : 5 gives an area ratio of 9 : 25, so the larger area is 25/9 of the smaller one. Working with the smaller area: 27 ÷ 9 = 3, and 3 × 25 = 75. The area of the larger rectangle is 75 cm².
- (d) 5:3:2 — German = 100% − 50% − 30% = 20%. The ratio 50 : 30 : 20 simplifies by dividing every part by 10 to give 5 : 3 : 2.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (a) 8 cm — Method: a scale of 1 : n means the real distance is n times the distance on the map, so to go from the real distance back to the map distance, put both lengths in the same unit and then divide by the scale. Working: 1 km = 100 000 cm, so 8 km = 8 × 100 000 = 800 000 cm; 800 000 ÷ 100 000 = 8. Answer: 8 cm. The distractors: 800000 cm comes from converting the 8 km into centimetres and stopping there, so the division by the scale — the inverse operation the question asks for — is never done; 80 cm comes from taking a metre to be 1000 cm, which turns 8 km into 8 × 1000 × 1000 = 8 000 000 cm and gives 8 000 000 ÷ 100 000 = 80; 0.08 cm comes from taking a kilometre to be 1000 cm, which turns 8 km into 8000 cm and gives 8000 ÷ 100 000 = 0.08.
- (d) 3:8 — Convert 2 hours to minutes: 2 hours = 120 minutes. The ratio is 45 : 120. The highest common factor of 45 and 120 is 15. Divide both parts by 15: 45 ÷ 15 = 3 and 120 ÷ 15 = 8, giving 3 : 8. Leaving the hours unconverted gives 45 : 2 — the units on each side are different, so this does not compare like with like. Dividing by 5 instead of 15 gives 9 : 24, which still shares a common factor of 3, so it is not fully simplified. Swapping the order gives 8 : 3, hours to minutes instead of minutes to hours.
- (a) The plumber charges £20 for each extra hour worked — The gradient is the change in C divided by the change in h: (85 − 45) ÷ (3 − 1) = 40 ÷ 2 = £20. On this graph the gradient represents the extra amount charged for each extra hour worked, so the answer is 'The plumber charges £20 for each extra hour worked'. Not dividing by the change in h gives 40, the option that reads 'charges £40 for each extra hour worked' — that is the total change in cost between the two points, not the rate per hour. Reading off the C-value of the first point, 45, gives the option using £45 — that is the cost of a job lasting 1 hour, not the rate. Treating the gradient as a flat total charge regardless of the time taken misunderstands what a straight-line graph through two different h-values shows: the cost does depend on h, so it cannot be a single fixed total.
- (d) 3/16 — Convert 4 kg to grams: 4 kg = 4000 g. Form the fraction 750/4000. Both numbers share a factor of 250, so 750 ÷ 250 = 3 and 4000 ÷ 250 = 16, giving 3/16. 16/3 comes from writing the fraction the wrong way round, as 4000/750. 15/8 comes from converting 4 kg using ×100 instead of ×1000, treating it as 400 g, then simplifying 750/400. 3/20 comes from dividing 750 by 250 correctly to get 3, but dividing 4000 by 200 instead of 250, giving 3/20.
- (b) 250 g — Method: adding water changes the total mass but not the mass of salt, so find the salt, hold it fixed, use the new ratio to find the new total mass and subtract the mass already in the beaker. Working: 12:100 = x:500 gives 12 ÷ 100 × 500 = 60 g of salt; that 60 g must be 8% of the new mixture, so 8:100 = 60:y gives y = 60 ÷ 8 × 100 = 750 g; the water added is 750 − 500 = 250 g. Answer: 250 g. The distractors: 750 g is the mass of the diluted solution, given without taking away the 500 g that was in the beaker to start with; 60 g is the mass of salt, the quantity that stays the same, given instead of the mass of water; 20 g comes from treating the fall from 12% to 8% as 4% of the original 500 g, which measures a change in concentration as though it were a mass of water.
- (a) £1,000 — Method: find the increase, then add it to the original price; the multiplier 1.25 does both steps at once. Working: 25% is one quarter, so 25% of £800 = £800 ÷ 4 = £200, and £800 + £200 = £1,000. Answer: £1,000. The distractors: £200 is the increase on its own, not the new price; £825 comes from adding £25 to £800, treating the 25% as £25; £600 comes from taking the 25% off the price instead of adding it on.
- (b) 5:8 — The mix has 5 parts sand and 3 parts cement, so 5 + 3 = 8 parts in total. Sand to total is 5 : 8, and since the highest common factor of 5 and 8 is 1, this is already in its simplest form. Giving 5 : 3 answers sand to cement, not sand to the total mix. Giving 3 : 8 is cement to total, the wrong part of the mix. Giving 8 : 5 has the total and the sand swapped round.
- (a) 1500 ml — Method: to change litres into millilitres, multiply by 1000. Working: 1.5 × 1000 = 1500 ml. So the bottle holds 1500 ml. Distractor 150 ml comes from multiplying by 100 instead of 1000. Distractor 15000 ml comes from multiplying by 10000, an extra zero. Distractor 1.5 ml comes from not converting the units at all.
- (c) 20% — Method: percentage increase = (increase ÷ original) × 100. Working: the increase is 54 − 45 = 9, and 9 ÷ 45 = 0.2, so the percentage increase is 0.2 × 100 = 20. Answer: 20%. The distractors: 9% comes from writing the actual increase as a percentage; 16.7% comes from dividing by the new value 54 instead of the original 45; 120% is the multiplier 1.2 written as a change rather than the change itself.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
Build your own mix at the worksheet builder.