Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.y is directly proportional to x. If the value of x is trebled (multiplied by 3), what happens to the value of y?
- 2.A water tank is a cuboid measuring 30 cm × 20 cm × 10 cm. The tank is full of water. Work out how many litres of water it holds.
- 3.A garden plan is enlarged by a scale factor of 3. A flower bed on the original plan is 5 cm long. Work out the length of the flower bed on the enlarged plan, in centimetres.
- 4.An Ordnance Survey map has a scale of 1 : 50 000. A cycle route measures 9.4 cm on the map. Work out the real length of the route, in kilometres.
- 5.A plumber's charge, C pounds, for a job lasting h hours is shown on a straight-line graph. The line passes through the points (1, 45) and (3, 85). Work out what the gradient of this line represents, in context.
- 6.A ribbon of length 90 cm is cut into two pieces in the ratio 4:5. Work out the length of the shorter piece.
- 7.Two mathematically similar tins have heights 8 cm and 12 cm. Jayden says that the volume of the larger tin is 1.5 times the volume of the smaller tin. Give a reason why Jayden is incorrect, and work out the correct volume scale factor.
- 8.Freya buys three items whose prices are in the ratio 2:3:5. Altogether she pays £400. Work out the price of the most expensive item.
- 9.Tap A fills a swimming pool in 6 hours. Tap B pours water twice as fast as tap A. The time taken to fill the pool is inversely proportional to the rate of flow. Work out how long tap B takes to fill the pool.
- 10.Simplify the ratio 12 : 18 : 30 to its simplest form.
- 11.Line P passes through the origin and the point (3, 21). Line Q passes through the origin and the point (5, 45). Both lines represent the distance, in metres, run by an athlete against the time, in seconds. Work out the gradient of the steeper line.
- 12.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 13.A map has a scale of 1 : 40 000. A cycle path measures 7.5 cm on the map. Work out the real length of the cycle path, in kilometres.
- 14.Triangle ABC has a right angle at C. AC = 3 cm and BC = 4 cm. Triangle ABC is mathematically similar to triangle PQR, with angle B corresponding to angle Q. Work out the value of tan(angle Q).
- 15.Two quantities y and z are each in direct proportion to x, and are given by y = 3x and z = 7x. Work out the difference between the value of y and the value of z when x = 4.y = 3x
Answer key
- (c) y is trebled — In direct proportion, y = kx, so multiplying x by 3 multiplies y by 3 as well: y is trebled. Dividing y by 3 is what would happen for inverse proportion, not direct. Saying y stays the same ignores the proportional relationship entirely. Saying y increases by 3 mistakes multiplying by 3 for adding 3.
- (b) 6 litres — Method: find the volume of the cuboid in cm³, then change cm³ into litres using 1 litre = 1000 cm³. Working: 30 × 20 × 10 = 6000 cm³, and 6000 ÷ 1000 = 6. Answer: 6 litres. The distractors: 60 litres comes from using 1 litre = 100 cm³; 600 litres comes from using 1 litre = 10 cm³; 0.6 litres comes from using 1 litre = 10 000 cm³.
- (d) 15 cm — An enlargement by scale factor 3 means every length is multiplied by 3: 5 × 3 = 15 cm. Dividing by the scale factor instead, 5 ÷ 3 = 1.7 (to 1 d.p.), gives 1.7 cm — dividing shrinks the plan rather than enlarging it. Adding the scale factor instead of multiplying, 5 + 3 = 8, gives 8 cm. Squaring the scale factor, as you would for an area, 5 × 3² = 45, gives 45 cm — length scales by the factor itself, not its square.
- (d) 4.7 km — Multiply the map length by the scale factor: 9.4 × 50 000 = 470 000 cm. Convert to kilometres: 470 000 cm = 4700 m = 4.7 km. Converting only to metres and calling the answer 4700 kilometres mistakes metres for kilometres. Misreading the scale as 1 : 5000 instead of 1 : 50 000, 9.4 × 5000 = 47 000 cm = 0.47 km, is ten times too small. Misplacing the decimal point in 9.4 and effectively using 94, 94 × 50 000 = 4 700 000 cm = 47 km, is ten times too big.
- (a) The plumber charges £20 for each extra hour worked — The gradient is the change in C divided by the change in h: (85 − 45) ÷ (3 − 1) = 40 ÷ 2 = £20. On this graph the gradient represents the extra amount charged for each extra hour worked, so the answer is 'The plumber charges £20 for each extra hour worked'. Not dividing by the change in h gives 40, the option that reads 'charges £40 for each extra hour worked' — that is the total change in cost between the two points, not the rate per hour. Reading off the C-value of the first point, 45, gives the option using £45 — that is the cost of a job lasting 1 hour, not the rate. Treating the gradient as a flat total charge regardless of the time taken misunderstands what a straight-line graph through two different h-values shows: the cost does depend on h, so it cannot be a single fixed total.
- (c) 40 cm — Method: split the total length into the number of parts shown by the ratio, then find the value of the shorter share. Working: the ratio 4:5 has 4 + 5 = 9 parts, so one part is 90 ÷ 9 = 10 cm, and the shorter piece is 4 × 10 = 40 cm. So the shorter piece is 40 cm. Distractor 50 cm is the length of the LONGER piece, not the shorter one. Distractor 45 cm comes from splitting the ribbon into two equal halves, ignoring the ratio. Distractor 10 cm is the value of one part, found correctly but never multiplied by 4.
- (a) 3.375 — Method: the volume scale factor between similar shapes is the length scale factor cubed, not the length scale factor itself. Working: the length scale factor is 12 ÷ 8 = 1.5, and 1.5³ = 3.375. Answer: 3.375. Jayden's answer, 1.5, is only the LENGTH scale factor — he never cubed it to get the volume scale factor. 2.25 comes from squaring the length scale factor instead of cubing it, which would give the area scale factor. 4.5 comes from multiplying the length scale factor by 3 (the number of dimensions) instead of cubing it.
- (d) £200 — Method: add the parts of the ratio, divide the total paid by the number of parts to find the value of one part, then multiply by the parts in the most expensive item. Working: 2 + 3 + 5 = 10 parts, £400 ÷ 10 = £40 for one part, and the most expensive item is 5 parts, so 5 × £40 = £200. Answer: £200. The distractors: £40 is the value of one part; £80 is the 2-part item, the cheapest of the three; £120 is the 3-part item.
- (a) 3 hours — Method: for a fixed pool the rate of flow multiplied by the time taken is constant, so multiplying the rate by a factor divides the time by that same factor. Working: tap B's rate is 2 times tap A's rate, so tap B's time is 6 ÷ 2 = 3 hours. Answer: 3 hours. The distractors: 12 hours comes from multiplying the time by 2 as well, which treats the time as directly proportional to the rate and has the faster tap taking longer; 4 hours comes from reading ‘twice as fast’ additively, as two hours quicker, and working out 6 − 2 instead of scaling the time by a factor of 2; 1.5 hours comes from applying the factor of 2 twice, halving 6 to 3 and then halving again.
- (d) 2:3:5 — The highest common factor of 12, 18 and 30 is 6. Divide every part by 6: 12 ÷ 6 = 2, 18 ÷ 6 = 3, 30 ÷ 6 = 5, giving 2 : 3 : 5. Dividing by 2 instead of 6 gives 6 : 9 : 15, which still shares a common factor of 3, so it is not fully simplified. Dividing by 3 instead of 6 gives 4 : 6 : 10, which still shares a common factor of 2, so it is not fully simplified either. Swapping the first two parts gives 3 : 2 : 5, the parts in the wrong order.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (b) 3 km — Method: multiply by the scale factor to get the real length in centimetres, then convert to kilometres. Working: 7.5 × 40 000 = 300 000 cm. 300 000 ÷ 100 000 = 3 km. Wrong options: 30 km comes from dividing by 10 000 instead of 100 000 when converting to kilometres; 3000 km comes from dividing by 100 instead of 100 000; 0.3 km comes from dividing by 1 000 000, an extra factor of 10 too many.
- (a) 3/4 — Method: use tan = opposite ÷ adjacent in the right-angled triangle to find tan(angle B), then use the fact that corresponding angles in similar shapes are equal, so they have equal trigonometric ratios. Working: for angle B, the opposite side is AC = 3 cm and the adjacent side is BC = 4 cm, so tan(angle B) = 3/4. Angle Q corresponds to angle B, so angle Q = angle B and tan(angle Q) = 3/4. Answer: 3/4. 4/3 comes from writing the ratio upside down, adjacent ÷ opposite, giving the reciprocal instead of the tangent. 3/7 and 4/7 come from treating 3 and 4 as if they were parts of a total of 3 + 4 = 7, which is how a ratio is shared, not how a trigonometric ratio is formed.
- (b) 16 — Method: substitute x into each equation separately, then subtract the smaller value from the larger. Working: y = 3 × 4 = 12 and z = 7 × 4 = 28, so the difference is 28 − 12 = 16. Answer: 16. The distractors: 4 comes from subtracting the constants, 7 − 3, which is the difference between the two gradients rather than the difference between the values at x = 4; 40 comes from adding the two values, 12 + 28, instead of subtracting them; 28 is the value of z on its own, given instead of being compared with the value of y.
Build your own mix at the worksheet builder.