Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.Two hikers' journeys are shown on separate distance-time graphs. Hiker A's graph has gradient 4.5 km/h. Hiker B's graph has gradient 3.2 km/h. Work out how much faster Hiker A walks than Hiker B, in km/h.
- 2.A scale model of a bridge is built at a scale of 1 : 120. The real bridge is 84 m long. Work out the length of the model, in centimetres.
- 3.A salt solution has a concentration of 10%. The solution contains 50 g of salt. Work out the total mass of the solution.
- 4.Triangle ABC is mathematically similar to triangle PQR, with AB corresponding to PQ and BC corresponding to QR. AB = 6 cm, BC = 8 cm and PQ = 12 cm. Work out the length of QR.
- 5.Write 1/5 as a percentage.
- 6.A car uses 6 litres of petrol to travel 90 km. Write the ratio of the distance travelled in km to the amount of petrol used in litres, in its simplest form.
- 7.A glass holds 250 ml of squash. Work out how many of these glasses are needed to fill a 1 litre bottle.
- 8.Noah runs 2 km in 10 minutes. Work out how long he takes to run 5 km at the same speed.
- 9.A recipe uses flour, sugar and butter in the ratio 8 : 3 : 5. Write the ratio of flour to the rest of the mixture (sugar and butter combined) in its simplest form.
- 10.Zara is paid £9 per hour. Her wage is directly proportional to the number of hours she works. Work out her wage for working 6 hours.
- 11.In a choir of 30 singers, 40% are altos and the rest are sopranos. Write the number of sopranos as a fraction of the number of altos. Give your answer in its simplest form.
- 12.In one batch of shortbread, a bakery uses 240 g of butter and 160 g of sugar. Another batch, made in the same ratio, uses 90 g of sugar. Work out how much butter is needed for the second batch.
- 13.A statue exerts a downward force of 68.4 N on its base, which has an area of 2.85 m². Work out the pressure that the statue exerts on its base, in N/m².
- 14.3 builders put up a fence in 12 days. All the builders work at the same rate, so the number of days is inversely proportional to the number of builders. Work out how long 9 builders take to put up the same fence.
- 15.Line P passes through the origin and the point (3, 21). Line Q passes through the origin and the point (5, 45). Both lines represent the distance, in metres, run by an athlete against the time, in seconds. Work out the gradient of the steeper line.
Answer key
- (a) 1.3 — The gradient of a distance-time graph gives the speed. Difference in speed = 4.5 − 3.2 = 1.3 km/h. A student who subtracts the speeds the wrong way round, 3.2 − 4.5, gets −1.3. A student who adds the two speeds instead of comparing them gets 7.7. A student who multiplies the two gradients gets 14.4.
- (c) 70 cm — Method: convert the real length to centimetres, then divide by the scale factor. Working: 84 m = 8400 cm. 8400 ÷ 120 = 70 cm. Wrong options: 0.7 cm comes from dividing 84 by 120 without converting metres to centimetres; 1,008,000 cm comes from multiplying instead of dividing (8400 × 120); 7 cm comes from converting 84 m to 840 cm (using ×10 instead of ×100) before dividing.
- (c) 500 g — Method: a concentration of 10% is the ratio 10:100, and the salt and the solution in the beaker must be in that same ratio, so write 10:100 = 50:m and scale. Working: 50 ÷ 10 = 5, so the salt is 5 times the 10 of the ratio; the solution must be 5 times the 100 of the ratio, giving 5 × 100 = 500 g. Answer: 500 g. The distractors: 5 g comes from working out 10% of 50 g, which treats the 50 g as the whole solution when it is the salt inside it; 450 g comes from scaling correctly and then taking the 50 g of salt away, which gives the mass of water rather than the mass of the whole solution; 5000 g comes from dividing by 0.01 instead of 0.1, that is from writing 10% as 0.01.
- (c) 16 cm — Corresponding sides of similar triangles are all in the same ratio. Use the pair whose lengths are both known: the scale factor from triangle ABC to triangle PQR is 12 ÷ 6 = 2. Since QR corresponds to BC, multiply BC by that scale factor: 8 × 2 = 16, so QR = 16 cm.
- (a) 20% — Method: a percentage is a number of parts per hundred, so divide the numerator by the denominator and multiply by 100. Working: 1 ÷ 5 = 0.2, and 0.2 × 100 = 20; the same result comes from scaling 1/5 to 20/100. Answer: 20%. The distractors: 5% comes from reading the denominator 5 straight off as the percentage; 25% comes from confusing 1/5 with 1/4, the fraction met most often in percentage work; 50% comes from a place value slip in the division, writing 1 ÷ 5 as 0.5 instead of 0.2.
- (a) 15:1 — Write the ratio distance : petrol using the numbers in the question: 90 : 6. Divide both parts by their highest common factor, 6, to give 15 : 1. (1:15 comes from writing the ratio the wrong way round, petrol : distance. 5:2 comes from dividing only the distance by 6 and leaving the 6 litres unchanged, giving 15:6, which does simplify to 5:2 — the error is the step before, because both parts of a ratio must be divided by the same number. 14:1 comes from subtracting at the first step instead of dividing, 90 − 6 = 84, and then writing 84 : 6 and dividing both parts by 6 to get 14 : 1; subtracting has no part in simplifying a ratio.)
- (a) 4 — Method: put both amounts into the same unit, then divide the bottle by the glass. Working: 1 litre = 1000 ml, and 1000 ÷ 250 = 4. Answer: 4. The distractors: 0.25 comes from dividing the glass by the bottle, 250 ÷ 1000, the division the wrong way round; 40 comes from taking 1 litre as 10 000 ml; 1250 comes from adding 1000 and 250 instead of dividing.
- (d) 25 minutes — Method: find the time for one kilometre, then multiply by the number of kilometres — the unitary method with a rate. Working: 10 ÷ 2 = 5 minutes per km, and 5 × 5 = 25. Answer: 25 minutes. The distractors: 20 minutes comes from multiplying the 10 minutes by 2, the distance in the given rate, instead of by the scale factor 2.5; 50 minutes comes from multiplying 10 by 5, treating the 10 minutes as the time for a single kilometre; 15 minutes comes from adding the 5 km on to the 10 minutes, adding quantities that are not the same kind.
- (d) 1 : 1 — Sugar and butter together make 3 + 5 = 8 parts of the mixture. Comparing flour to this, 8 : 8, simplifies to 1 : 1. Giving 1 : 2 compares flour with the whole mixture (8 + 3 + 5 = 16 parts, giving 8 : 16 = 1 : 2) instead of with the rest of the mixture. Giving 3 : 5 is the ratio of sugar to butter, not of flour to the rest of the mixture. Giving 8 : 3 compares flour only with sugar, leaving butter out altogether.
- (a) £54 — Method: for direct proportion, wage = rate × hours. Working: £9 × 6 = £54. Wrong options: £15 comes from adding the rate and the hours instead of multiplying (£9 + 6); £63 comes from using 7 hours instead of 6; £1.50 comes from dividing the rate by the hours instead of multiplying (£9 ÷ 6).
- (d) 3/2 — Work out the number of altos: 40% of 30 = 12. The rest are sopranos, so there are 30 − 12 = 18 sopranos. Form the fraction 18/12; both numbers share a factor of 6, so 18 ÷ 6 = 3 and 12 ÷ 6 = 2, giving 3/2. 2/3 comes from writing the fraction the wrong way round, as altos over sopranos (12/18). 3/5 comes from comparing the sopranos with the whole choir (18/30), instead of with the altos. 7/3 comes from miscalculating 30 − 12 as 28 instead of 18, then forming 28/12.
- (c) 135 g — Find the ratio of butter to sugar in the first batch: 240:160, which simplifies to 3:2. For the second batch, sugar = 90 g, so butter = 90 × 3/2 = 135 g. (60 g comes from using the ratio the wrong way round, 90 × 2/3. 170 g comes from subtracting the drop in sugar, 160 − 90 = 70 g, from the original butter amount, 240 − 70, instead of scaling. 240 g comes from not scaling the butter amount at all.)
- (a) 24 N/m² — Pressure = force ÷ area. 68.4 ÷ 2.85 = 24 N/m². 194.94 N/m² comes from multiplying the force by the area instead of dividing (68.4 × 2.85). 65.55 N/m² comes from subtracting the area from the force (68.4 − 2.85) instead of dividing. 0.04 N/m² comes from dividing the area by the force instead of the force by the area (2.85 ÷ 68.4).
- (a) 4 days — Method: the fence is a fixed amount of work, so builders × days is constant; find that product and divide it by the new number of builders. Working: 3 × 12 = 36 builder-days of work, so with 9 builders the time is 36 ÷ 9 = 4 days. Answer: 4 days. The distractors: 6 days comes from halving the 12 days because there are more builders, rather than dividing by the factor of 3 by which the workforce has grown; 36 days is the constant product of builders and days, given as a number of days instead of being shared between the builders; 9 days comes from taking 3 days off the 12, treating three extra builders as three fewer days, which is additive rather than proportional.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
Build your own mix at the worksheet builder.