Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A 5 kg bag of potatoes costs £4.50. Work out the cost per kilogram.
- 2.A force of 20 N acts on an area of 4 m². Using pressure = force ÷ area, work out the pressure, in pascals.
- 3.Two printers' running costs are shown on separate straight-line graphs of total cost against number of pages printed. Printer A's graph has gradient £0.04 per page. Printer B's graph has gradient £0.05 per page. Work out how much cheaper it is to print 200 pages on Printer A than on Printer B, based on these running costs alone.
- 4.Write the ratio 4 : 9 in the form 1 : n.
- 5.A sunflower is 140 cm tall. A tomato plant is 80 cm tall. Write the height of the tomato plant as a fraction of the height of the sunflower, giving your answer in its simplest form.
- 6.The number of euros, e, received is directly proportional to the number of pounds, p, exchanged. Exchanging £40 gives 46 euros. Work out how many euros are received for £65, giving your answer to the nearest euro.
- 7.A worker is paid £13.20 per hour. Work out this rate of pay in pence per minute.
- 8.Two mathematically similar cylinders have heights in the ratio 3 : 4. Write the ratio of their volumes in its simplest form.
- 9.Butter costs £2.40 per kg. Work out the cost of the butter in pence per 100 g.
- 10.A spring's extension is directly proportional to the force applied to it. A force of 5 N produces an extension of 12 mm. Work out the extension produced by a force of 20 N.
- 11.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 12.A fruit bowl contains 9 apples and 21 oranges. Write down the ratio of apples to oranges in its simplest form.
- 13.A coach journey of 240 km takes 3 hours. For this fixed distance the average speed needed is inversely proportional to the time taken. Work out the average speed needed to complete the same journey in 2 hours.
- 14.A metal has a density of 7.8 g/cm³. Work out the density of the metal in kg/m³.
- 15.A plumber charges a call-out fee plus an hourly rate. The total charge, C pounds, for a job lasting h hours is shown on a straight-line graph. The line passes through the points (2, 70) and (5, 130). Work out the call-out fee, in pounds.
Answer key
- (c) £0.90 — Cost per kilogram = total cost ÷ mass. £4.50 ÷ 5 = £0.90. £1.11 comes from dividing the mass by the cost instead of the cost by the mass (5 ÷ 4.50). £22.50 comes from multiplying the cost by the mass instead of dividing (£4.50 × 5). £0.50 comes from subtracting the two numbers (5 − 4.50) instead of dividing.
- (a) 5 — Pressure = force ÷ area = 20 ÷ 4 = 5 pascals. Getting 80 comes from multiplying the force and area instead of dividing. Getting 16 comes from subtracting the area from the force (20 − 4 = 16) instead of dividing. Getting 24 comes from adding the force and area (20 + 4 = 24) instead of dividing.
- (d) £2.00 — Cost for Printer A = 200 × £0.04 = £8. Cost for Printer B = 200 × £0.05 = £10. Difference = £10 − £8 = £2.00.
- (b) 1 : 2.25 — Method: to write a ratio in the form 1 : n, divide both parts by the first part. Working: 4 ÷ 4 = 1 and 9 ÷ 4 = 2.25, so 4 : 9 = 1 : 2.25. Working out 9 ÷ 4 = 2.25 correctly but then writing it as the first part gives 2.25 : 1, the two parts the wrong way round. Subtracting 9 − 4 = 5 gives 1 : 5, confusing the difference between the parts with the ratio. Multiplying 4 × 9 = 36 gives 1 : 36, confusing the product of the parts with the ratio.
- (d) 4/7 — Put the tomato plant's height over the sunflower's height: 80/140. Divide both numbers by their highest common factor, 20: 80÷20 = 4, 140÷20 = 7, giving 4/7. (7/4 comes from writing the heights the wrong way round. 3/7 comes from finding the difference in the heights, 140 − 80 = 60 cm, and writing it as a fraction of the sunflower's height, 60/140. 4/11 comes from comparing the tomato plant's height to the total height of both plants, 80/220.)
- (b) 75 — The exchange rate is constant: k = 46 ÷ 40 = 1.15 euros per pound. For £65, the number of euros is 1.15 × 65 = 74.75, which rounds to 75 euros. Getting 74 comes from rounding 74.75 down instead of to the nearest whole number. Getting 57 comes from using the reciprocal rate (40 ÷ 46) instead of 46 ÷ 40. Getting 71 comes from adding the difference between 65 and 40 (25) onto 46 instead of using the proportional rate.
- (a) 22p — First convert the hourly rate to pence: £13.20 = 1320p. Then convert from per hour to per minute by dividing by 60, since there are 60 minutes in an hour: 1320 ÷ 60 = 22p per minute. Working out 1320 × 60 = 79200p multiplies by 60 instead of dividing, going the wrong way between per hour and per minute. Working out 13.20 × 10 = 132p converts pounds to pence using the wrong power of ten, and dividing that by 60 carries the error through to give 2.2p. Working out 13.20 × 100 = 1320p converts the currency correctly but stops there, leaving the rate as pence per hour rather than completing the second conversion to pence per minute. The rate of pay is 22p per minute.
- (c) 27 : 64 — For similar solids, the ratio of volumes is the ratio of lengths cubed: 3³ : 4³ = 27 : 64. 3 : 4 comes from using the height ratio itself as the volume ratio, without cubing it at all. 9 : 16 comes from squaring each part instead of cubing (3² : 4²) — squaring is the rule for area, not volume. 27 : 4 comes from cubing only the first part of the ratio (3³ = 27), and leaving the second part uncubed.
- (c) 24p — Method: change the price to pence, then find what one tenth of 1 kg costs, since 100 g is one tenth of 1 kg. Working: £2.40 = 240p per kg, and 240 ÷ 10 = 24p per 100 g. So the cost is 24p per 100 g. Distractor 2.4p comes from dividing by 100 instead of 10. Distractor 2400p comes from multiplying by 10 instead of dividing. Distractor 240p comes from using the price per kg without scaling it down to 100 g.
- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (d) 3 : 7 — There are 9 apples and 21 oranges, giving the ratio 9 : 21. The highest common factor of 9 and 21 is 3: 9 ÷ 3 = 3 and 21 ÷ 3 = 7, so the simplest form is 3 : 7. Giving 9 : 21 has not been simplified. Giving 7 : 3 swaps the order, comparing oranges to apples instead of apples to oranges. Giving 9 : 12 compares the number of apples with the difference between the two amounts (21 − 9 = 12), not with the number of oranges.
- (c) 120 km/h — Method: for a fixed distance the average speed multiplied by the time is constant, and that constant is the distance, so divide the distance by the new time. Working: speed × time = 240, so in 2 hours the speed needed is 240 ÷ 2 = 120 km/h. Answer: 120 km/h. The distractors: 80 km/h is the average speed of the original journey, 240 ÷ 3, which answers for the 3-hour timing rather than the 2-hour one; 160 km/h comes from halving the 3 hours to 1.5 hours and working out 240 ÷ 1.5, instead of using the 2 hours the question gives; 480 km/h comes from multiplying the distance by the 2 hours rather than dividing by it.
- (c) 7800 kg/m³ — Method: build the conversion factor from the two unit changes separately — one for the mass, one for the volume. Working: 1 kg = 1000 g, so the mass figure is divided by 1000; 1 m = 100 cm, so 1 m³ = 100 × 100 × 100 = 1000000 cm³ and the volume figure is multiplied by 1000000. The density figure is therefore multiplied by 1000000 ÷ 1000 = 1000, giving 7.8 × 1000 = 7800. So the density of the metal is 7800 kg/m³. Distractor 780 kg/m³ comes from multiplying by 100 instead of 1000. Distractor 78000 kg/m³ comes from multiplying by 10000, an extra zero. Distractor 7.8 kg/m³ comes from not converting the units at all.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
Build your own mix at the worksheet builder.