Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A baker uses 450 g of flour and 300 g of butter in a batch of pastry. Write the mass of butter as a fraction of the total mass of flour and butter, in its simplest form.
- 2.A rectangle has its height and its width in the ratio 3:2. The height of the rectangle is 18 cm. Work out the width of the rectangle.
- 3.A cartographer is choosing a scale for a map to show a small park in as much detail as possible. Which of these scales would show the MOST detail — 1 : 500, 1 : 5000, or 1 : 50 000? Give the correct scale and reason.
- 4.Order these three values from smallest to largest: 3/8, 0.43, 41%.
- 5.A statue exerts a downward force of 68.4 N on its base, which has an area of 2.85 m². Work out the pressure that the statue exerts on its base, in N/m².
- 6.A coach journey is 372 miles in total. After a stop, the coach has travelled 217 miles. Write the distance still to travel as a fraction of the total journey. Give your answer in its simplest form.
- 7.A straight-line graph shows the distance travelled, d kilometres, against the time taken, t hours, for a cyclist. The line passes through the origin and has a gradient of 18. Write down what the gradient of this line represents.
- 8.A straight-line graph shows the cost, C pounds, of hiring a bike for h hours. The line passes through the points (1, 12) and (4, 27). Which of these statements about the line is true?
- 9.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 10.A necklace uses 22 blue beads and 8 red beads. Write the number of blue beads as a fraction of the number of red beads. Give your answer as a mixed number in its simplest form.
- 11.A gym charges members a joining fee plus a fixed amount per month. The total amount paid, C pounds, is shown on a straight-line graph against the number of months, m. The line passes through the points (3, 130) and (7, 210). Work out the total amount a member will have paid after 12 months.
- 12.In a fruit drink, 3/8 of the total volume is orange juice and the rest is apple juice. Write down the ratio of orange juice to apple juice, in its simplest form.
- 13.A recipe for pastry uses flour and butter in the ratio 3:2. A baker has 180 g of butter and wants to make pastry using all of it. Work out the total mass of pastry the baker can make.
- 14.The ratio of the number of red beads to blue beads in a bracelet is 3 : 7. There are 21 blue beads. Work out the number of red beads.
- 15.In a bag, the ratio of green counters to yellow counters is 3 : 8. There are 24 yellow counters. A student says, 'There must be 9 green counters.' Is the student correct? Choose the correct verdict and reason.
Answer key
- (b) 2/5 — Method: a fraction taken 'of the total' has the whole batch as its denominator, so add the two masses first and then write the butter over that total. Working: the total mass is 450 g + 300 g = 750 g, so the fraction is 300/750; the highest common factor of 300 and 750 is 150, and 300 ÷ 150 = 2 while 750 ÷ 150 = 5. Answer: 2/5 of the batch. The distractors: 2/3 comes from comparing the butter with the flour, 300/450, a part-to-part fraction when the question asks for a part compared with the whole; 3/5 comes from writing the flour over the total, 450/750, which answers about the wrong ingredient; 3/2 comes from writing the flour over the butter, 450/300, which both uses the wrong denominator and reverses the order.
- (b) 12 cm — Method: height:width = 3:2 means both lengths are built from parts of the same size, so write 3:2 = 18:x, find one part and multiply by the number of parts in the width. Working: the height is 3 parts and measures 18 cm, so one part is 18 ÷ 3 = 6 cm; the width is 2 parts, so 2 × 6 = 12 cm. Answer: 12 cm. The distractors: 27 cm comes from using the ratio the wrong way round, 18 ÷ 2 × 3, which makes the width longer than the height even though 2 is the smaller part; 6 cm is the value of one part, given as the width instead of being doubled; 17 cm comes from treating the ratio as a difference — 3 − 2 = 1, so 1 cm is taken off the height — but a ratio scales the lengths, it does not subtract from them.
- (b) 1 : 500 — smallest real distance per cm (5 m), most detail — Method: compare what one centimetre represents in real life for each scale — the scale with the smallest real distance per cm shows the most detail. Working: for 1 : 500, 1 cm represents 500 cm (5 m); for 1 : 5000, 1 cm represents 50 m; for 1 : 50 000, 1 cm represents 500 m. Since 5 m is the smallest, 1 : 500 shows the most detail. Wrong options: '1 : 50 000 — covers the largest real area' wrongly assumes covering more area means more detail, when it is the opposite; '1 : 5000 — the middle value' wrongly assumes the middle scale is automatically the most balanced; '1 : 500 — covers the largest real distance' picks the correct scale but states an incorrect fact, since 1 : 500 actually covers the smallest real distance per cm.
- (a) 3/8, 41%, 0.43 — Method: convert every value to a decimal so they can be compared on the same scale, then order them. Working: 3/8 = 0.375, 41% = 0.41, and 0.43 stays as 0.43, so from smallest to largest the decimals are 0.375, 0.41, 0.43, giving the order 3/8, 41%, 0.43. Answer: 3/8, 41%, 0.43. The order 3/8, 0.43, 41% comes from comparing 0.43 and 41% as raw digits (43 versus 41) without converting 41% into the decimal 0.41 first, wrongly placing 0.43 before 41%. The order 0.43, 41%, 3/8 comes from placing the values in completely reversed order, from largest to smallest instead of smallest to largest. The order 41%, 0.43, 3/8 comes from ordering the values by their TYPE (percentage, then decimal, then fraction) rather than by their actual size.
- (a) 24 N/m² — Pressure = force ÷ area. 68.4 ÷ 2.85 = 24 N/m². 194.94 N/m² comes from multiplying the force by the area instead of dividing (68.4 × 2.85). 65.55 N/m² comes from subtracting the area from the force (68.4 − 2.85) instead of dividing. 0.04 N/m² comes from dividing the area by the force instead of the force by the area (2.85 ÷ 68.4).
- (a) 5/12 — Work out the distance still to travel: 372 − 217 = 155 miles. Form the fraction 155/372; both numbers share a factor of 31, so 155 ÷ 31 = 5 and 372 ÷ 31 = 12, giving 5/12. 7/12 comes from writing the distance already travelled as the fraction of the journey (217/372 = 7/12), instead of the distance still to travel. 145/372 comes from miscalculating 372 − 217 as 145 instead of 155. 5/7 comes from comparing the remaining distance with the distance already travelled (155/217 = 5/7), instead of with the total journey.
- (d) The cyclist's speed, in kilometres per hour — Method: on any straight-line graph the gradient is the change in the quantity on the vertical axis for each 1 unit of the quantity on the horizontal axis, so its meaning is read off the two axis labels. Working: the vertical axis is distance in kilometres and the horizontal axis is time in hours, so the gradient counts kilometres for each hour, and distance for each hour is speed. Answer: the cyclist's speed, in kilometres per hour. The distractors: 'the total distance the cyclist travels, in kilometres' reads the gradient as a value taken off the vertical axis, but a gradient is a rate and no end point of the journey has been given; 'the time the cyclist takes, in hours' names the horizontal axis, which is the quantity the gradient divides by rather than the gradient itself; 'the distance the cyclist travels in 18 hours' treats the 18 as a value of t, when 18 is the steepness of the line and not a point on it.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (d) 2 3/4 — Divide 22 by 8: 8 goes into 22 twice, with a remainder of 6, so 22/8 = 2 and 6/8 left over. Since 6/8 simplifies to 3/4 (dividing both by 2), the blue beads are 2 3/4 of the red beads. 2 5/8 comes from miscalculating the remainder as 22 − 16 = 5 instead of 6. 2 3/11 comes from writing the leftover 6 over the original 22 instead of over the 8, giving 6/22, then simplifying that to 3/11. 1 3/8 comes from halving only the numerator of 22/8 to get 11/8, without halving the denominator too, giving the mixed number 1 3/8.
- (c) £310 — Gradient = (210 − 130) ÷ (7 − 3) = 80 ÷ 4 = 20, so the monthly rate is £20. Using C = 20m + c with the point (3, 130): 130 = 60 + c, so c = 70. After 12 months: C = 20 × 12 + 70 = 240 + 70 = £310.
- (c) 3 : 5 — If orange juice is 3/8 of the total, apple juice is the remaining 1 − 3/8 = 5/8. The ratio of orange to apple is therefore 3 : 5. Inverting gives 5 : 3, apple to orange instead of orange to apple. Using the denominator 8 as the second part of the ratio, 3 : 8, compares orange juice to the whole drink rather than to the apple juice alone. Pairing the total 8 with the apple fraction's numerator 5 gives 8 : 5, which mixes a whole-total figure with a part figure.
- (c) 450 g — Method: use the amount of butter given to find the value of one part of the ratio, then find the mass of flour, and finally add flour and butter to get the total. Working: 180 g of butter is 2 parts, so one part is 180 ÷ 2 = 90 g. The flour is 3 parts, so 3 × 90 = 270 g, and the total mass is 270 + 180 = 450 g. So the baker can make 450 g of pastry. Distractor 270 g is only the mass of flour, forgetting to add the butter back on. Distractor 300 g comes from treating the 180 g as 3 parts instead of 2, swapping which ratio number matches the butter. Distractor 540 g comes from multiplying 180 by 3 directly instead of first finding the value of one part.
- (b) 9 — Method: divide the known quantity by its ratio number to find the value of one part, then multiply by the other ratio number. Working: 21 ÷ 7 = 3 (value of one part). Red beads = 3 × 3 = 9. Wrong options: 49 comes from dividing by the wrong ratio number (21 ÷ 3 × 7); 24 comes from adding the ratio number for red (3) to 21 instead of scaling; 14 comes from subtracting the ratio number for blue (7) from 21 instead of scaling.
- (c) Yes, correct, because 24 ÷ 8 × 3 = 9. — Method: divide the count you know by its ratio part to find the value of one part, then multiply by the part you want. Working: one part = 24 ÷ 8 = 3 counters, so green = 3 × 3 = 9 counters, and the student is correct. Dividing 24 by 3 instead of 8 gives 24 ÷ 3 × 8 = 64, the ratio parts the wrong way round. Stopping after 24 ÷ 8 = 3 gives 3, forgetting to multiply by the green ratio part. Adding 24 + 3 = 27 confuses adding a ratio part with scaling by it.
Build your own mix at the worksheet builder.