Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 2978 — A rise of 6% is a multiplier of 1.06, applied once for each year. After year 1: 2500 × 1.06 = 2650. After year 2: 2650 × 1.06 = 2809. After year 3: 2809 × 1.06 = 2977.54, which is 2978 to the nearest whole number. Multiplying by 1.18 in one go would be wrong, because the second and third years grow from larger numbers than the first.
- (c) 1.2 — Add the parts of the ratio: 6 + 1 = 7. Divide the total amount by the number of parts: 8.4 ÷ 7 = 1.2 litres, which is the value of one part and also the amount of syrup, since syrup is 1 part. (7.2 litres is the amount of water, using 6 parts instead of 1. 1.4 comes from dividing 8.4 by 6 — the water's part of the ratio — instead of dividing by the total number of parts, 7. 0.84 comes from dividing 8.4 by 10 instead of by 7.)
- (d) The 750 g box, at 36p per 100 g — Work out the cost per 100 g of each box. 750 g box: 270p ÷ 7.5 = 36p per 100 g. 500 g box: 195p ÷ 5 = 39p per 100 g. The lower cost per 100 g is the better value, so the 750 g box at 36p per 100 g is the answer. Choosing the 500 g box at 39p per 100 g gets the maths right but picks the higher unit price, not realising a smaller cost per 100 g is the better deal. Choosing the 500 g box because £1.95 is lower than £2.70 compares the total prices without allowing for the different pack sizes at all. Working out 270 ÷ 5 = 54p divides the 750 g box's price by the wrong number of hundred-grams (the 500 g box's), giving a rate that belongs to neither box. The 750 g box, at 36p per 100 g, is the better value.
- (b) 25 m/s — Convert km/h to m/s by multiplying by 1000 (km to m) and dividing by 3600 (hours to seconds): 90 × 1000 ÷ 3600 = 25 m/s. Working out 90 ÷ 60 = 1.5 converts using 60, as if going from hours to minutes rather than to seconds. Working out 90 × 3.6 = 324 multiplies by 3.6 instead of dividing by it, going the wrong way between the units. Working out 90 × 1000 = 90000 converts kilometres to metres but forgets to convert hours to seconds at all. The train's speed is 25 m/s.
- (c) 90 cm² — The perimeter ratio is 30 : 45, which simplifies to 2 : 3, so the larger frame is 1.5 times the perimeter of the smaller one. Areas scale with the square of this length scale factor: 1.5² = 2.25. 40 × 2.25 = 90, so the larger frame has an area of 90 cm². Giving 60 cm² uses the scale factor, 1.5, without squaring it (40 × 1.5 = 60). Giving 135 cm² cubes the scale factor, 1.5³ = 3.375, as if area scaled like a volume (40 × 3.375 = 135). Giving 2.25 cm² is the squared scale factor on its own, without multiplying by the smaller frame's area of 40 cm².
- (b) 3 km — Method: multiply by the scale factor to get the real length in centimetres, then convert to kilometres. Working: 7.5 × 40 000 = 300 000 cm. 300 000 ÷ 100 000 = 3 km. Wrong options: 30 km comes from dividing by 10 000 instead of 100 000 when converting to kilometres; 3000 km comes from dividing by 100 instead of 100 000; 0.3 km comes from dividing by 1 000 000, an extra factor of 10 too many.
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
- (d) 25 — Gradient = (60 − 20) ÷ (15 − 5) = 40 ÷ 10 = 4 litres per minute. Since the butt is empty at t = 0, V = 4t. Setting V = 100 gives t = 100 ÷ 4 = 25 minutes.
- (a) 5/12 — Work out the distance still to travel: 372 − 217 = 155 miles. Form the fraction 155/372; both numbers share a factor of 31, so 155 ÷ 31 = 5 and 372 ÷ 31 = 12, giving 5/12. 7/12 comes from writing the distance already travelled as the fraction of the journey (217/372 = 7/12), instead of the distance still to travel. 145/372 comes from miscalculating 372 − 217 as 145 instead of 155. 5/7 comes from comparing the remaining distance with the distance already travelled (155/217 = 5/7), instead of with the total journey.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (a) 675 ml — How much a jug holds is a volume, and volumes of similar solids scale with the cube of the length scale factor. The length scale factor is 12 ÷ 8 = 1.5, so the volume scale factor is 1.5 × 1.5 × 1.5 = 3.375. The larger jug holds 200 × 3.375 = 675 ml. Multiplying the scale factor by 3 instead of raising it to the power 3 is the mistake to guard against here.
- (d) 90 cm — Method: scale each dimension by the scale factor, then find the perimeter. Working: model height = 240 ÷ 8 = 30 cm; model width = 120 ÷ 8 = 15 cm. Perimeter = 2 × (30 + 15) = 90 cm. Wrong options: 11.25 cm comes from squaring the scale factor as if finding an area (720 ÷ 64); 510 cm comes from scaling only one dimension and leaving the other at full size; 720 cm comes from finding the real perimeter (2 × (240 + 120)) but forgetting to scale it down at all.
- (d) 500 ml — Varnish covers a surface, so the amount needed scales with the area scale factor, which is the square of the length scale factor. The length scale factor is 50 ÷ 20 = 2.5, so the area scale factor is 2.5 × 2.5 = 6.25. The varnish needed for the larger statue is 80 × 6.25 = 500 ml. Using 2.5 on its own would scale a length, not a surface.
- (c) £2743.60 — Each year the balance is multiplied by 1.03. After the first year: 4000 × 1.03 = 4120. After the second year: 4120 × 1.03 = 4243.60, so that is what Leah takes out. She then spends £1500 of it, which leaves 4243.60 − 1500 = 2743.60. She has £2743.60 left.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
Build your own mix at the worksheet builder.