Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) 1 : 2500 — Method: convert the real-world measurement to the same unit as the drawing (centimetres) before writing the ratio. Working: 25 m = 2500 cm, so the scale is 1 : 2500. Wrong options: 1 : 25 comes from not converting metres to centimetres at all; 1 : 250 comes from converting metres to centimetres using ×10 instead of ×100; 1 : 2.5 comes from converting in the wrong direction (treating 25 m as 2.5 cm).
- (b) 75 — The exchange rate is constant: k = 46 ÷ 40 = 1.15 euros per pound. For £65, the number of euros is 1.15 × 65 = 74.75, which rounds to 75 euros. Getting 74 comes from rounding 74.75 down instead of to the nearest whole number. Getting 57 comes from using the reciprocal rate (40 ÷ 46) instead of 46 ÷ 40. Getting 71 comes from adding the difference between 65 and 40 (25) onto 46 instead of using the proportional rate.
- (a) 3.375 — Method: the volume scale factor between similar shapes is the length scale factor cubed, not the length scale factor itself. Working: the length scale factor is 12 ÷ 8 = 1.5, and 1.5³ = 3.375. Answer: 3.375. Jayden's answer, 1.5, is only the LENGTH scale factor — he never cubed it to get the volume scale factor. 2.25 comes from squaring the length scale factor instead of cubing it, which would give the area scale factor. 4.5 comes from multiplying the length scale factor by 3 (the number of dimensions) instead of cubing it.
- (a) 135 minutes — Method: to change hours into minutes, multiply by 60. Working: 2.25 × 60 = 135 minutes. So the film runs for 135 minutes. Distractor 145 minutes comes from reading the '.25' as 25 minutes instead of a quarter of an hour, giving 2 hours 25 minutes. Distractor 225 minutes comes from multiplying by 100 instead of 60. Distractor 150 minutes comes from rounding 2.25 hours to 2.5 hours before converting.
- (c) 25 — Method: divide the larger number by its ratio part to find the value of one part, then multiply by the smaller number's ratio part. Working: 40 ÷ 8 = 5 (value of one part). Smaller number = 5 × 5 = 25. Wrong options: 64 comes from dividing by the smaller ratio part instead of the larger (40 ÷ 5 × 8); 45 comes from adding the value of one part onto 40 instead of scaling down (40 + 5); 35 comes from subtracting the value of one part from 40 (40 − 5) instead of multiplying it by the smaller ratio part.
- (d) £6705 — After the first year: £6400 × 1.08 = £6912. After the second year: £6912 × 0.97 = £6704.64, which rounds to £6705 (nearest pound). £6720 comes from treating the +8% and −3% changes as a single net +5% change applied to the original amount instead of applying each change in turn: £6400 × 1.05 = £6720. £6912 comes from applying only the first year's growth and stopping there, without applying the second year's fall. £7104 comes from adding the two percentages together as +11% and applying that to the original amount instead of applying each change to the correct starting amount in turn: £6400 × 1.11 = £7104.
- (c) 448.00 US dollars — Method: multiply the amount in pounds by the exchange rate. Working: £350 × 1.28 = 448.00 US dollars. Wrong options: 273.44 US dollars comes from dividing by the rate instead of multiplying (350 ÷ 1.28); 351.28 US dollars comes from adding the rate to the amount instead of multiplying; 4,480.00 US dollars comes from a decimal-point slip, using 12.8 instead of 1.28.
- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
- (d) 20 km/h — Method: average speed = total distance ÷ total time, with the time written in hours. Working: 1 hour 30 minutes = 1.5 hours, and 30 ÷ 1.5 = 20. Answer: 20 km/h. The distractors: 45 km/h comes from multiplying 30 by 1.5 instead of dividing; 15 km/h comes from dividing by 2, as if the ride had taken 2 hours; 30 km/h comes from dividing by the whole hour only and ignoring the extra 30 minutes.
- (b) 24 km/h — First convert 45 minutes to hours: 45 ÷ 60 = 0.75 hours. Then divide the distance by the time: 18 ÷ 0.75 = 24 km/h. Reading 45 minutes as 0.45 hours (writing the minutes after the decimal point instead of dividing by 60) gives 18 ÷ 0.45 = 40 km/h. Working out 18 × 0.75 = 13.5 multiplies by the time instead of dividing. Working out 18 ÷ 45 = 0.4 divides by 45 without ever converting the minutes to hours. The cyclist's average speed is 24 km/h.
- (c) £7617.60 — To decrease by 8% each year, multiply by 0.92 (100% − 8%) twice. £9000 × 0.92 × 0.92 = £7617.60. £7560.00 comes from treating the two 8% decreases as a single flat 16% decrease applied once instead of compounding: £9000 × 0.84 = £7560.00. £8280.00 comes from applying the 8% decrease only once, for 1 year instead of 2: £9000 × 0.92 = £8280.00. £10497.60 comes from multiplying by 1.08 twice, increasing the value instead of decreasing it: £9000 × 1.08 × 1.08 = £10497.60.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (a) 150 g — Method: scale the recipe to find the total sugar needed, then subtract the sugar Sam already has. Working: 200 ÷ 8 × 20 = 500, so 500 g is needed in total; 500 − 350 = 150, so 150 g still to buy. Stopping after finding the total, 500, without subtracting what he has gives 500 g. Scaling the wrong way round, 200 × 8 ÷ 20 = 80, wrongly suggests he already has enough, giving 0 g. Adding the amount he has instead of subtracting it, 500 + 350 = 850, gives 850 g.
Build your own mix at the worksheet builder.