Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (c) 120 km/h — Method: for a fixed distance the average speed multiplied by the time is constant, and that constant is the distance, so divide the distance by the new time. Working: speed × time = 240, so in 2 hours the speed needed is 240 ÷ 2 = 120 km/h. Answer: 120 km/h. The distractors: 80 km/h is the average speed of the original journey, 240 ÷ 3, which answers for the 3-hour timing rather than the 2-hour one; 160 km/h comes from halving the 3 hours to 1.5 hours and working out 240 ÷ 1.5, instead of using the 2 hours the question gives; 480 km/h comes from multiplying the distance by the 2 hours rather than dividing by it.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (b) 1:12 — C = 12n means that for every 1 pen there are 12 pence of cost, so n : C = 1 : 12, and the highest common factor of 1 and 12 is 1, so this is already in its simplest form. Writing C : n instead of n : C gives 12 : 1, the ratio the wrong way round. Reading C = 12n as '12 more than n' instead of '12 times n', so n = 1 gives C = 13, gives 1 : 13, from adding instead of multiplying. Choosing n = 12, so C = 12 × 12 = 144, gives the correct pair of values n : C = 12 : 144, but the ratio the right way round left unsimplified — 12 and 144 share a common factor of 12, which has not been cancelled.
- (c) 1 : 16 — Work out each area before comparing. Square P has area 3 × 3 = 9 cm². Square Q has area 12 × 12 = 144 cm². The ratio of the areas is 9 : 144, and both parts divide by 9: 9 ÷ 9 = 1 and 144 ÷ 9 = 16, giving 1 : 16. Notice that the sides are in the ratio 1 : 4, and the areas are in the ratio of the squares of those parts, which is what always happens when a length is scaled. Stopping at 1 : 4 would compare the sides and never the areas, and cubing the parts to reach 1 : 64 is the rule for volumes rather than for areas. The order matters too: the question names square P first, so its area must be the first part of the ratio.
- (a) 12 m² — Real length = 8 × 50 = 400 cm = 4 m. Real width = 6 × 50 = 300 cm = 3 m. Real area = 4 × 3 = 12 m². Scaling the plan area (8 × 6 = 48 cm²) by 50 instead of by 50 squared gives 48 × 50 = 2400 cm² = 0.24 m² — area scales by the square of the length scale factor, not the scale factor itself. Multiplying the real dimensions in centimetres, 400 × 300 = 120 000, and calling the result 120 000 m² mistakes square centimetres for square metres. Converting only the length to metres and leaving the width as 6 (treating centimetres as metres), 4 × 6 = 24, gives 24 m², from a scaling that was never finished.
- (c) 25 — Method: divide the larger number by its ratio part to find the value of one part, then multiply by the smaller number's ratio part. Working: 40 ÷ 8 = 5 (value of one part). Smaller number = 5 × 5 = 25. Wrong options: 64 comes from dividing by the smaller ratio part instead of the larger (40 ÷ 5 × 8); 45 comes from adding the value of one part onto 40 instead of scaling down (40 + 5); 35 comes from subtracting the value of one part from 40 (40 − 5) instead of multiplying it by the smaller ratio part.
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (a) 80 km/h — Average speed = total distance ÷ total time. Total distance = 45 + 75 = 120 km. Total time = 30 minutes + 1 hour = 1.5 hours. 120 ÷ 1.5 = 80 km/h. 60 km/h comes from treating the 30 minutes as a whole hour, giving a total time of 2 hours instead of 1.5 (120 ÷ 2). 82.5 km/h comes from averaging the two separate speeds (45 ÷ 0.5 = 90 km/h and 75 ÷ 1 = 75 km/h, then (90 + 75) ÷ 2) instead of using total distance over total time. 75 km/h comes from using only the second part of the journey (75 km in 1 hour) and ignoring the first part.
- (d) 8/5 — Two masses can only be compared once they are in the same unit. Since 1 kg is 1000 g, the recipe needs 1200 g. The recipe's mass is being written as a fraction of Dan's mass, so 1200 goes on the top and 750 on the bottom, giving 1200/750. The highest common factor of the two is 150: 1200 ÷ 150 = 8 and 750 ÷ 150 = 5. The fraction is 8/5, which is greater than 1 because the recipe needs more flour than Dan has.
- (c) 1.2 — Add the parts of the ratio: 6 + 1 = 7. Divide the total amount by the number of parts: 8.4 ÷ 7 = 1.2 litres, which is the value of one part and also the amount of syrup, since syrup is 1 part. (7.2 litres is the amount of water, using 6 parts instead of 1. 1.4 comes from dividing 8.4 by 6 — the water's part of the ratio — instead of dividing by the total number of parts, 7. 0.84 comes from dividing 8.4 by 10 instead of by 7.)
- (d) 500 ml — Varnish covers a surface, so the amount needed scales with the area scale factor, which is the square of the length scale factor. The length scale factor is 50 ÷ 20 = 2.5, so the area scale factor is 2.5 × 2.5 = 6.25. The varnish needed for the larger statue is 80 × 6.25 = 500 ml. Using 2.5 on its own would scale a length, not a surface.
- (b) They are in inverse proportion, because x × y = 60 for both pairs. — Testing inverse proportion means checking that x × y is the same for every pair: 4 × 15 = 60 and 6 × 10 = 60, so the quantities are in inverse proportion. Saying they are not in inverse proportion because x + y differs uses addition, which is not the correct test. Saying they are not in inverse proportion because y ÷ x differs uses the test for direct proportion, and finding that it differs tells us nothing about inverse proportion. Saying x × y = 40 for both pairs is an arithmetic slip: 4 × 15 = 60, not 40.
- (d) 250 cm³/s — Method: first change litres per minute into cm³ per minute, then change per minute into per second. Working: 15 × 1000 = 15000 cm³ per minute, then 15000 ÷ 60 = 250 cm³ per second. So the tank fills at 250 cm³ per second. Distractor 15000 cm³/s comes from stopping after the first step and forgetting to change minutes into seconds. Distractor 900000 cm³/s comes from multiplying by 60 instead of dividing. Distractor 2500 cm³/s comes from dividing by 6 instead of 60.
Build your own mix at the worksheet builder.