Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (b) Car A, 50 km/h — Method: speed = distance ÷ time for each car, then compare. Working: Car A = 150 ÷ 3 = 50 km/h. Car B = 180 ÷ 4 = 45 km/h. Since 50 > 45, Car A is faster, travelling at 50 km/h. Wrong options: Car B, 45 km/h correctly finds Car B's speed but wrongly names the slower car as faster; Car A, 45 km/h picks the correct car but uses Car B's speed by mistake; Car B, 50 km/h picks the wrong car but uses Car A's correct speed value.
- (d) The line is straight and passes through the origin. — Direct proportion means y = kx for a constant k. This is a straight line, and when x = 0, y = 0, so it passes through the origin. For a positive k it slopes upward from left to right.
- (a) 2978 — A rise of 6% is a multiplier of 1.06, applied once for each year. After year 1: 2500 × 1.06 = 2650. After year 2: 2650 × 1.06 = 2809. After year 3: 2809 × 1.06 = 2977.54, which is 2978 to the nearest whole number. Multiplying by 1.18 in one go would be wrong, because the second and third years grow from larger numbers than the first.
- (c) 250 miles — Find the distance travelled in 1 hour: 150 ÷ 3 = 50 miles. Multiply by 5 hours: 50 × 5 = 250 miles. Giving 300 miles doubles the original distance (150 × 2 = 300) using a scale factor of 2 instead of the correct 5 ÷ 3. Giving 200 miles adds only one extra hour's distance, 50, instead of the two extra hours actually needed (150 + 50 = 200, rather than 150 + 100). Giving 90 miles divides by the scale factor instead of multiplying (150 × 3 ÷ 5 = 90).
- (a) 15.3 litres — Squash : water = 2 : 9, so water is 9 ÷ 2 = 4.5 times the amount of squash. Multiply: 3.4 × 4.5 = 15.3 litres. Using the multiplier upside down — treating squash as 9 ÷ 2 times water, when it is water that is 9 ÷ 2 times squash — and calculating 3.4 × (2 ÷ 9) gives about 0.8 litres (to 1 d.p.); that would be the squash needed for 3.4 litres of water, not the water needed for 3.4 litres of squash. Adding the difference between the ratio parts, 9 − 2 = 7, to the squash amount, 3.4 + 7 = 10.4, mistakes a ratio for a fixed extra amount. Using the total number of parts, 2 + 9 = 11, so the multiplier 11 ÷ 2 = 5.5, gives 3.4 × 5.5 = 18.7 litres — that finds the total mix from the squash amount, not the water alone.
- (d) The cyclist's speed, in kilometres per hour — Method: on any straight-line graph the gradient is the change in the quantity on the vertical axis for each 1 unit of the quantity on the horizontal axis, so its meaning is read off the two axis labels. Working: the vertical axis is distance in kilometres and the horizontal axis is time in hours, so the gradient counts kilometres for each hour, and distance for each hour is speed. Answer: the cyclist's speed, in kilometres per hour. The distractors: 'the total distance the cyclist travels, in kilometres' reads the gradient as a value taken off the vertical axis, but a gradient is a rate and no end point of the journey has been given; 'the time the cyclist takes, in hours' names the horizontal axis, which is the quantity the gradient divides by rather than the gradient itself; 'the distance the cyclist travels in 18 hours' treats the 18 as a value of t, when 18 is the steepness of the line and not a point on it.
- (d) 4.7 km — Multiply the map length by the scale factor: 9.4 × 50 000 = 470 000 cm. Convert to kilometres: 470 000 cm = 4700 m = 4.7 km. Converting only to metres and calling the answer 4700 kilometres mistakes metres for kilometres. Misreading the scale as 1 : 5000 instead of 1 : 50 000, 9.4 × 5000 = 47 000 cm = 0.47 km, is ten times too small. Misplacing the decimal point in 9.4 and effectively using 94, 94 × 50 000 = 4 700 000 cm = 47 km, is ten times too big.
- (c) £136 — 5% interest each year means the value becomes 100% + 5% = 105% of the previous year's value, and 105% = 1.05, so the multiplier is 1.05. Account A: £3200 × 1.05 × 1.05 = £3528. Account B (simple interest): £3200 + 2 × (£3200 × 0.03) = £3392. The difference is £3528 − £3392 = £136. (£128 comes from working out Account A with simple interest too, instead of compound: £3200 + 2 × (£3200 × 0.05) = £3520, then £3520 − £3392 = £128. £3528 is the value of Account A on its own, not the difference between the two accounts. £3392 is the value of Account B on its own, not the difference.)
- (b) 1 : 1.875 — To write a ratio in the form 1 : n, divide both parts by the first part, 8: 8 ÷ 8 = 1 and 15 ÷ 8 = 1.875, giving 1 : 1.875. Giving 1 : 0.53 divides the wrong way round, computing 8 ÷ 15 instead of 15 ÷ 8. Giving 1.875 : 1 has the two parts of the answer swapped, which is the form n : 1, not 1 : n. Giving 8 : 1.875 divides only the second part by 8, so the first part is still 8, not 1.
- (c) 20 cm — Convert 5 km to centimetres: 5 km = 5000 m = 500 000 cm. Divide by the scale factor: 500 000 ÷ 25 000 = 20, giving 20 cm. Converting only as far as metres, 5000 ÷ 25 000 = 0.2, gives 0.2 cm — the conversion to centimetres was never finished. Dropping a zero in the division gives 2 cm, ten times too small. Misreading the scale as 1 : 2500 instead of 1 : 25 000 gives 500 000 ÷ 2500 = 200 cm, ten times too big.
- (b) 450.00 kg — 1 m³ = 100 × 100 × 100 = 1,000,000 cm³, so 0.5 m³ = 500,000 cm³. Mass = density × volume = 0.9 × 500,000 = 450,000 g. Converting to kilograms by dividing by 1000 gives 450,000 ÷ 1000 = 450.00 kg. Skipping the m³-to-cm³ conversion and multiplying 0.9 × 0.5 = 0.45 treats the volume as if it were already 0.5 cm³, giving 0.45 kg. Finding the mass correctly in grams, 450,000 g, but not converting to kilograms leaves 450000.00 kg, out by a factor of 1000. Using the area conversion factor of 10,000, as if converting m² to cm², instead of the volume factor of 1,000,000 gives 0.5 × 10,000 = 5,000 'cm³', and a mass of 0.9 × 5,000 = 4,500 g, which is 4.50 kg.
- (d) 8 — The product of price and number of tickets is constant: k = 4 × 12 = 48. At £6 per ticket, the number of tickets is 48 ÷ 6 = 8. Getting 18 comes from treating price and tickets as directly proportional and working out 12 × 6 ÷ 4 instead of dividing k by the new price. Getting 12 assumes the number of tickets does not change when the price changes. Getting 6 comes from writing down the new price instead of working out the number of tickets.
Build your own mix at the worksheet builder.