Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 2978 — A rise of 6% is a multiplier of 1.06, applied once for each year. After year 1: 2500 × 1.06 = 2650. After year 2: 2650 × 1.06 = 2809. After year 3: 2809 × 1.06 = 2977.54, which is 2978 to the nearest whole number. Multiplying by 1.18 in one go would be wrong, because the second and third years grow from larger numbers than the first.
- (c) 20 cm — Convert 5 km to centimetres: 5 km = 5000 m = 500 000 cm. Divide by the scale factor: 500 000 ÷ 25 000 = 20, giving 20 cm. Converting only as far as metres, 5000 ÷ 25 000 = 0.2, gives 0.2 cm — the conversion to centimetres was never finished. Dropping a zero in the division gives 2 cm, ten times too small. Misreading the scale as 1 : 2500 instead of 1 : 25 000 gives 500 000 ÷ 2500 = 200 cm, ten times too big.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (d) 135 m² — Method: for area, the scale factor must be squared. Working: area scale = 300² = 90 000. 15 × 90 000 = 1,350,000 cm². Convert to m² by dividing by 10 000: 1,350,000 ÷ 10 000 = 135 m². Wrong options: 0.45 m² comes from using the linear scale factor (×300) instead of squaring it; 1,350,000 m² comes from forgetting to convert the answer from cm² to m²; 13,500 m² comes from dividing by 100 instead of 10 000 when converting units.
- (c) 7800 kg/m³ — Method: build the conversion factor from the two unit changes separately — one for the mass, one for the volume. Working: 1 kg = 1000 g, so the mass figure is divided by 1000; 1 m = 100 cm, so 1 m³ = 100 × 100 × 100 = 1000000 cm³ and the volume figure is multiplied by 1000000. The density figure is therefore multiplied by 1000000 ÷ 1000 = 1000, giving 7.8 × 1000 = 7800. So the density of the metal is 7800 kg/m³. Distractor 780 kg/m³ comes from multiplying by 100 instead of 1000. Distractor 78000 kg/m³ comes from multiplying by 10000, an extra zero. Distractor 7.8 kg/m³ comes from not converting the units at all.
- (a) 2.17 litres per minute — There are 60 minutes in an hour, so to convert litres per hour to litres per minute you divide by 60: 130 ÷ 60 = 2.1666..., which rounds to 2.17 litres per minute. Multiplying by 60 instead of dividing gives 130 × 60 = 7800.00 litres per minute, using the conversion factor the wrong way round. Leaving the rate unchanged, 130.00, ignores that 'per hour' and 'per minute' are different units. Dividing by 50 instead of 60, misremembering the number of minutes in an hour, gives 130 ÷ 50 = 2.60 litres per minute.
- (a) 20 litres per minute — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, and its units are the vertical unit for each one of the horizontal unit. Working: from (2, 50) to (6, 130) the volume changes by 130 − 50 = 80 litres and the time changes by 6 − 2 = 4 minutes, so the gradient is 80 ÷ 4 = 20, measured in litres for each minute. Answer: 20 litres per minute. The distractors: 25 litres per minute comes from using one point on its own, 50 ÷ 2, which assumes the line starts at the origin when the tank already held 50 litres at 2 minutes; 0.05 litres per minute comes from dividing the change in time by the change in volume, 4 ÷ 80, which gives the time for each litre but is then labelled as litres for each minute; 20 minutes for each litre has the right value with the units the wrong way round, and a tank that needed 20 minutes to gain a single litre would be filling far more slowly than this one.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
- (c) 14 litres — Method: find the amount of fuel used per km first, then use it to find the fuel needed for 175 km. Working: 24 ÷ 300 = 0.08 litres per km, and 0.08 × 175 = 14 litres. So 14 litres are needed. Distractor 24 litres comes from assuming the same amount of fuel is used no matter the distance, without scaling. Distractor 21 litres comes from misreading the original distance as 200 km instead of 300 km. Distractor 1.4 litres comes from a decimal-point slip, giving an answer ten times too small.
- (c) 448.00 US dollars — Method: multiply the amount in pounds by the exchange rate. Working: £350 × 1.28 = 448.00 US dollars. Wrong options: 273.44 US dollars comes from dividing by the rate instead of multiplying (350 ÷ 1.28); 351.28 US dollars comes from adding the rate to the amount instead of multiplying; 4,480.00 US dollars comes from a decimal-point slip, using 12.8 instead of 1.28.
- (b) 4 — Method: find the length scale factor by taking the cube root of the volume scale factor, then square it to get the area scale factor. Working: 8 = 2³, so the length scale factor is 2, and the area scale factor is 2² = 4. Answer: 4. 8 comes from using the volume scale factor itself as if it were the area scale factor. 64 comes from squaring the volume scale factor, 8² = 64, instead of first taking its cube root. 2 comes from correctly finding the length scale factor but then forgetting to square it.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (b) −3 — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, with both changes taken in the same direction along the line. Working: going from (1, 20) to (5, 8) the change in y is 8 − 20 = −12 and the change in x is 5 − 1 = 4, so the gradient is −12 ÷ 4 = −3. Answer: −3, and the negative sign is expected because the line falls from left to right. The distractors: 3 comes from subtracting the smaller y from the larger, 20 − 8 = 12, while still taking the x values from left to right, which loses the minus sign that says the line falls; −12 is the change in y left undivided by the change in x of 4; −1/3 comes from dividing the change in x by the change in y, 4 ÷ (−12), turning the gradient upside down.
Build your own mix at the worksheet builder.