Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) 1.00 litres — Total volume = 350 + 650 = 1000 cm³. Since 1000 cm³ = 1 litre, the smoothie is 1.00 litre. Using only the orange juice's 650 cm³ and converting that gives 0.65 litres, forgetting the mango juice entirely. Using only the mango juice's 350 cm³ gives 0.35 litres, forgetting the orange juice. Adding both volumes correctly to get 1000 cm³ but not converting to litres leaves the answer as 1000.00, which is the volume in the wrong unit.
- (a) 15.3 litres — Squash : water = 2 : 9, so water is 9 ÷ 2 = 4.5 times the amount of squash. Multiply: 3.4 × 4.5 = 15.3 litres. Using the multiplier upside down — treating squash as 9 ÷ 2 times water, when it is water that is 9 ÷ 2 times squash — and calculating 3.4 × (2 ÷ 9) gives about 0.8 litres (to 1 d.p.); that would be the squash needed for 3.4 litres of water, not the water needed for 3.4 litres of squash. Adding the difference between the ratio parts, 9 − 2 = 7, to the squash amount, 3.4 + 7 = 10.4, mistakes a ratio for a fixed extra amount. Using the total number of parts, 2 + 9 = 11, so the multiplier 11 ÷ 2 = 5.5, gives 3.4 × 5.5 = 18.7 litres — that finds the total mix from the squash amount, not the water alone.
- (d) A falling curve that never touches either axis — Method: inverse proportion means the product of the two quantities is constant, so P = k ÷ Q; as Q grows P shrinks, and P can never reach zero because k divided by a number is never zero. Working: taking k = 12 as an example, the pairs (1, 12), (2, 6), (3, 4), (6, 2) and (12, 1) drop steeply at first and then flatten out, so the graph is a curve that approaches both axes without meeting either of them. Answer: a falling curve that never touches either axis. The distractors: 'a straight line through the origin' is the graph of direct proportion, P = kQ, which is the opposite relationship; 'a straight line with a negative gradient' is the commonest error, reading 'P falls as Q rises' as a straight line, but on such a line P would drop by the same amount for every increase in Q and would cross the horizontal axis into negative values; 'a straight line crossing the vertical axis above zero' is a relationship of the form P = mQ + c, in which P and Q are not proportional at all.
- (d) £8262 — A fall of 15% is a multiplier of 0.85 and a fall of 10% is a multiplier of 0.9, and each multiplier acts on the value at the start of its own year. After year 1: 12000 × 0.85 = 10200. After year 2: 10200 × 0.9 = 9180. After year 3: 9180 × 0.9 = 8262. The value 3 years after the car was bought is £8262. Adding the percentages to make a single fall of 35% would be wrong, because the later falls are taken from smaller values.
- (c) 120 km/h — Method: for a fixed distance the average speed multiplied by the time is constant, and that constant is the distance, so divide the distance by the new time. Working: speed × time = 240, so in 2 hours the speed needed is 240 ÷ 2 = 120 km/h. Answer: 120 km/h. The distractors: 80 km/h is the average speed of the original journey, 240 ÷ 3, which answers for the 3-hour timing rather than the 2-hour one; 160 km/h comes from halving the 3 hours to 1.5 hours and working out 240 ÷ 1.5, instead of using the 2 hours the question gives; 480 km/h comes from multiplying the distance by the 2 hours rather than dividing by it.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (b) 4% — Method: find the total interest earned, share it equally across the number of years to find one year's interest, then write it as a percentage of the amount invested. Working: total interest = £840 − £750 = £90, so one year's interest is £90 ÷ 3 = £30, and £30 as a percentage of £750 is (£30 ÷ £750) × 100 = 4%. Answer: 4%. 12% comes from treating the total interest of £90 as if it were earned in a single year, (£90 ÷ £750) × 100 = 12%, forgetting to divide by 3 years. 0.04% comes from finding the correct decimal, £30 ÷ £750 = 0.04, but forgetting to multiply by 100 to convert it into a percentage. 112% comes from writing the final amount, £840, as a percentage of the amount invested, £750, without first subtracting the £750 to find the interest alone.
- (c) They are in direct proportion, because y ÷ x = 2.5 for both pairs. — Testing direct proportion means checking that y ÷ x is the same for every pair: 15 ÷ 6 = 2.5 and 25 ÷ 10 = 2.5, so the quantities are in direct proportion. Saying they are not in proportion because x + y differs uses addition, which is not the correct test for proportion. Saying they are not in proportion because y − x differs also uses the wrong test — subtraction, not division. Saying they are in proportion because x × y is 90 and 250 uses multiplication, which is the test for inverse proportion, and the two products are not even equal to each other, so this option also contradicts itself.
- (c) 250 miles — Find the distance travelled in 1 hour: 150 ÷ 3 = 50 miles. Multiply by 5 hours: 50 × 5 = 250 miles. Giving 300 miles doubles the original distance (150 × 2 = 300) using a scale factor of 2 instead of the correct 5 ÷ 3. Giving 200 miles adds only one extra hour's distance, 50, instead of the two extra hours actually needed (150 + 50 = 200, rather than 150 + 100). Giving 90 miles divides by the scale factor instead of multiplying (150 × 3 ÷ 5 = 90).
- (c) L = d/5 — The scale 1 : 20 means each cm on the drawing represents 20 cm in real life, so the real length in cm is 20d. Converting to metres by dividing by 100: L = 20d/100 = d/5.
- (c) 7800 kg/m³ — Method: build the conversion factor from the two unit changes separately — one for the mass, one for the volume. Working: 1 kg = 1000 g, so the mass figure is divided by 1000; 1 m = 100 cm, so 1 m³ = 100 × 100 × 100 = 1000000 cm³ and the volume figure is multiplied by 1000000. The density figure is therefore multiplied by 1000000 ÷ 1000 = 1000, giving 7.8 × 1000 = 7800. So the density of the metal is 7800 kg/m³. Distractor 780 kg/m³ comes from multiplying by 100 instead of 1000. Distractor 78000 kg/m³ comes from multiplying by 10000, an extra zero. Distractor 7.8 kg/m³ comes from not converting the units at all.
- (d) 48 — Find the rate first: 18 ÷ 3 = 6 bottles per minute. Then apply it to the new time: 6 × 8 = 48 bottles. Working out 18 + (8 − 3) = 23 adds the extra 5 minutes onto the number of bottles instead of scaling proportionally. Working out 18 × 8 = 144 multiplies the given number of bottles by the new number of minutes without finding the rate first. Writing 18 keeps the count the same, not realising it must change with the time. In 8 minutes the machine fills 48 bottles.
- (a) 1.375 — The multiplier is the new value divided by the original value: 176 000 ÷ 128 000 = 1.375. Choosing 0.375 comes from working out the increase as a fraction of the original (48 000 ÷ 128 000 = 0.375) and stopping there, without adding on the 1 whole that represents the original turnover. Choosing 0.727 comes from dividing the 2023 turnover by the 2024 turnover, the wrong way round (128 000 ÷ 176 000, rounded to 3 decimal places). Choosing 137.5 comes from writing the multiplier as a percentage — the 2024 turnover is 137.5% of the 2023 turnover — instead of converting it to the decimal multiplier 1.375.
- (d) 4.7 km — Multiply the map length by the scale factor: 9.4 × 50 000 = 470 000 cm. Convert to kilometres: 470 000 cm = 4700 m = 4.7 km. Converting only to metres and calling the answer 4700 kilometres mistakes metres for kilometres. Misreading the scale as 1 : 5000 instead of 1 : 50 000, 9.4 × 5000 = 47 000 cm = 0.47 km, is ten times too small. Misplacing the decimal point in 9.4 and effectively using 94, 94 × 50 000 = 4 700 000 cm = 47 km, is ten times too big.
- (b) 75 — The exchange rate is constant: k = 46 ÷ 40 = 1.15 euros per pound. For £65, the number of euros is 1.15 × 65 = 74.75, which rounds to 75 euros. Getting 74 comes from rounding 74.75 down instead of to the nearest whole number. Getting 57 comes from using the reciprocal rate (40 ÷ 46) instead of 46 ÷ 40. Getting 71 comes from adding the difference between 65 and 40 (25) onto 46 instead of using the proportional rate.
Build your own mix at the worksheet builder.