Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) £2743.60 — Each year the balance is multiplied by 1.03. After the first year: 4000 × 1.03 = 4120. After the second year: 4120 × 1.03 = 4243.60, so that is what Leah takes out. She then spends £1500 of it, which leaves 4243.60 − 1500 = 2743.60. She has £2743.60 left.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (b) 1 : 500 — smallest real distance per cm (5 m), most detail — Method: compare what one centimetre represents in real life for each scale — the scale with the smallest real distance per cm shows the most detail. Working: for 1 : 500, 1 cm represents 500 cm (5 m); for 1 : 5000, 1 cm represents 50 m; for 1 : 50 000, 1 cm represents 500 m. Since 5 m is the smallest, 1 : 500 shows the most detail. Wrong options: '1 : 50 000 — covers the largest real area' wrongly assumes covering more area means more detail, when it is the opposite; '1 : 5000 — the middle value' wrongly assumes the middle scale is automatically the most balanced; '1 : 500 — covers the largest real distance' picks the correct scale but states an incorrect fact, since 1 : 500 actually covers the smallest real distance per cm.
- (c) 150% — Percentage = (180,000 ÷ 120,000) × 100 = 150%.
- (b) £13,860 — Method: apply the first year's percentage decrease, then apply the second year's percentage decrease to the new value. Working: after the first year, the car is worth £17,500 × 0.88. Multiplying this result by 0.90 gives the value at the end of the second year, £13,860. Answer: £13,860. £13,650 comes from adding the two percentages together (12% + 10% = 22%) and applying a single 22% decrease, £17,500 × 0.78 = £13,650, instead of applying the decreases one after the other. £15,750 comes from applying only the second year's 10% decrease to the original price, forgetting the first year's decrease entirely, £17,500 × 0.90 = £15,750. £15,400 comes from applying only the first year's 12% decrease and stopping there, forgetting to apply the second year's decrease at all.
- (b) 1 : 1.875 — To write a ratio in the form 1 : n, divide both parts by the first part, 8: 8 ÷ 8 = 1 and 15 ÷ 8 = 1.875, giving 1 : 1.875. Giving 1 : 0.53 divides the wrong way round, computing 8 ÷ 15 instead of 15 ÷ 8. Giving 1.875 : 1 has the two parts of the answer swapped, which is the form n : 1, not 1 : n. Giving 8 : 1.875 divides only the second part by 8, so the first part is still 8, not 1.
- (b) Provider Y — £21.00 against Provider X's £23.00 — Provider X's gradient is (35 − 15) ÷ 100 = 0.2, so cost = 15 + 0.2 × 40 = 15 + 8 = £23.00. Provider Y's gradient is (45 − 5) ÷ 100 = 0.4, so cost = 5 + 0.4 × 40 = 5 + 16 = £21.00. £21.00 is less than £23.00, so Provider Y is cheaper: 'Provider Y — £21.00 against Provider X's £23.00'. Getting both costs right but naming Provider X as cheaper compares the two numbers the wrong way round — £23.00 is more than £21.00, not less. Comparing only the fixed fees, £15.00 and £5.00, ignores the cost of the 40 gigabytes actually used. Reading off the costs at 100 gigabytes, £35.00 and £45.00, directly from the graph answers a different usage from the 40 gigabytes the question asks about.
- (b) 8 — Method: the gradient of a straight line is the change in the vertical value divided by the change in the horizontal value between two points on the line. Working: from the origin (0, 0) to (5, 40) the vertical change is 40 − 0 = 40 and the horizontal change is 5 − 0 = 5, so the gradient is 40 ÷ 5 = 8, which here means a cost of £8 for each litre. Answer: 8. The distractors: 0.125 comes from dividing the horizontal change by the vertical change, 5 ÷ 40, which gives litres per pound instead of the gradient; 40 comes from reading off the vertical value of the point and calling it the gradient, ignoring the 5 litres it took to reach that cost; 35 comes from subtracting the two coordinates, 40 − 5, instead of dividing them.
- (c) 2 : 5 — A ratio is written in the order the question names the two shapes, so triangle A's length comes first: 4 : 10. Both parts divide by 2: 4 ÷ 2 = 2 and 10 ÷ 2 = 5, giving 2 : 5. Lengths are compared using the lengths themselves, so nothing is squared here; squaring both parts would give the ratio of the areas instead.
- (b) 5 m — A scale of 1 : 500 means 1 cm on the plan represents 500 cm in real life. Converting to metres: 500 ÷ 100 = 5 m. 500 m comes from forgetting to convert the 500 cm into metres at all. 50 m comes from dividing by 10 instead of 100 when converting centimetres to metres: 500 ÷ 10 = 50. 0.5 m comes from dividing by 1000 instead of 100, as if converting to kilometres instead of metres: 500 ÷ 1000 = 0.5.
- (a) Inverse proportion — A curve that decreases and never touches either axis is the standard shape for inverse proportion, y = k/x. Direct proportion graphs are straight lines through the origin, which this is not, so it must be inverse proportion rather than neither.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (c) 7800 kg/m³ — Method: build the conversion factor from the two unit changes separately — one for the mass, one for the volume. Working: 1 kg = 1000 g, so the mass figure is divided by 1000; 1 m = 100 cm, so 1 m³ = 100 × 100 × 100 = 1000000 cm³ and the volume figure is multiplied by 1000000. The density figure is therefore multiplied by 1000000 ÷ 1000 = 1000, giving 7.8 × 1000 = 7800. So the density of the metal is 7800 kg/m³. Distractor 780 kg/m³ comes from multiplying by 100 instead of 1000. Distractor 78000 kg/m³ comes from multiplying by 10000, an extra zero. Distractor 7.8 kg/m³ comes from not converting the units at all.
- (c) 500 — Pressure = force ÷ area = 250 ÷ 0.5 = 500 pascals. Getting 125 comes from multiplying the force by the area instead of dividing (250 × 0.5 = 125). Getting 249.5 comes from subtracting the area from the force instead of dividing. Getting 50 comes from misreading the area as 5 m² instead of 0.5 m² and dividing 250 by 5.
Build your own mix at the worksheet builder.