Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) Map A, where the distance is 40 cm — 10 km = 1,000,000 cm. On Map A: 1000000 ÷ 25000 = 40 cm. On Map B: 1000000 ÷ 50000 = 20 cm. Since 40 cm is longer than 20 cm, the same real distance appears longer on Map A, the map with the smaller scale number. 'Map B, where the distance is 20 cm' has the correct working for Map B but names the wrong map as the one with the longer length. 'Map A, where the distance is 20 cm' correctly identifies Map A but pairs it with Map B's length. 'Map B, where the distance is 40 cm' correctly identifies Map A's length but attaches it to the wrong map.
- (a) 12 m² — Real length = 8 × 50 = 400 cm = 4 m. Real width = 6 × 50 = 300 cm = 3 m. Real area = 4 × 3 = 12 m². Scaling the plan area (8 × 6 = 48 cm²) by 50 instead of by 50 squared gives 48 × 50 = 2400 cm² = 0.24 m² — area scales by the square of the length scale factor, not the scale factor itself. Multiplying the real dimensions in centimetres, 400 × 300 = 120 000, and calling the result 120 000 m² mistakes square centimetres for square metres. Converting only the length to metres and leaving the width as 6 (treating centimetres as metres), 4 × 6 = 24, gives 24 m², from a scaling that was never finished.
- (a) 0.62 miles — The gradient of the line is the change in miles divided by the change in kilometres: 31 ÷ 50 = 0.62, so 1 kilometre converts to 0.62 miles. Dividing the wrong way round, 50 ÷ 31 = 1.612..., rounds to 1.61 miles — that finds how many kilometres are in 1 mile, not the reverse. Doubling the gradient, 1.24 miles, comes from using 62 ÷ 50 instead of 31 ÷ 50. Reading off the y-coordinate of the given point without dividing by the x-coordinate gives 31.00 miles, which is the number of miles for 50 kilometres, not for 1 kilometre.
- (b) £2205.00 — With compound interest each year's interest is worked out on the value at the start of that year, so a 5% rise is a multiplier of 1.05 applied once per year. After the first year: 2000 × 1.05 = 2100. After the second year: 2100 × 1.05 = 2205. The question asks for the value of the investment, not for the interest earned, so the answer is £2205.00.
- (a) 5 — Pressure = force ÷ area = 20 ÷ 4 = 5 pascals. Getting 80 comes from multiplying the force and area instead of dividing. Getting 16 comes from subtracting the area from the force (20 − 4 = 16) instead of dividing. Getting 24 comes from adding the force and area (20 + 4 = 24) instead of dividing.
- (b) 7980 — After the first year: 8000 × 0.95 = 7600. After the second year: 7600 × 1.05 = 7980. 8000 comes from assuming a 5% decrease followed by a 5% increase returns exactly to the starting number — it does not, because the increase acts on the smaller, already-reduced number. 8400 comes from applying only the second year's 5% increase to the original number: 8000 × 1.05 = 8400. 7600 comes from applying only the first year's 5% decrease and stopping there, without applying the second year's increase.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (a) 135 minutes — Method: to change hours into minutes, multiply by 60. Working: 2.25 × 60 = 135 minutes. So the film runs for 135 minutes. Distractor 145 minutes comes from reading the '.25' as 25 minutes instead of a quarter of an hour, giving 2 hours 25 minutes. Distractor 225 minutes comes from multiplying by 100 instead of 60. Distractor 150 minutes comes from rounding 2.25 hours to 2.5 hours before converting.
- (d) 3200 × 0.88³ — A fall of 12% leaves 88% of the value, because 100 − 12 = 88, and 88% written as a decimal multiplier is 0.88. Decay repeats that multiplier once for each year, so over 3 years it is applied three times: 0.88 × 0.88 × 0.88, which is written 0.88³. The calculation is therefore 3200 × 0.88³. Adding the percentages to make a single fall of 36% would be wrong, because each year's fall is taken from a smaller value than the year before.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (c) 9 g/cm³ — Density = mass ÷ volume, so 270 ÷ 30 = 9 g/cm³. Working out 270 − 30 = 240 subtracts the volume from the mass instead of dividing. Writing 270 gives the mass on its own, without dividing by the volume at all. Working out 270 × 30 = 8100 multiplies mass and volume together instead of dividing. The density of the block is 9 g/cm³.
- (a) 3.375 — Method: the volume scale factor between similar shapes is the length scale factor cubed, not the length scale factor itself. Working: the length scale factor is 12 ÷ 8 = 1.5, and 1.5³ = 3.375. Answer: 3.375. Jayden's answer, 1.5, is only the LENGTH scale factor — he never cubed it to get the volume scale factor. 2.25 comes from squaring the length scale factor instead of cubing it, which would give the area scale factor. 4.5 comes from multiplying the length scale factor by 3 (the number of dimensions) instead of cubing it.
- (d) 25 — Gradient = (60 − 20) ÷ (15 − 5) = 40 ÷ 10 = 4 litres per minute. Since the butt is empty at t = 0, V = 4t. Setting V = 100 gives t = 100 ÷ 4 = 25 minutes.
- (c) £3,200 — Method: find the value of one part of the ratio from the first investor's amount, then work out the second investor's share before adding both together. Working: £1,200 is 3 parts, so one part is £1,200 ÷ 3 = £400. The second investor's share is 5 × £400 = £2,000, and the total is £1,200 + £2,000 = £3,200. So the total invested is £3,200. Distractor £2,000 is only the second investor's share, without adding the first investor's £1,200. Distractor £2,400 comes from doubling the first investor's amount instead of using the ratio. Distractor £6,000 comes from multiplying £1,200 by 5 directly instead of first finding the value of one part.
Build your own mix at the worksheet builder.