Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (c) 88 km/h — Multiply the speed in mph by the conversion factor: 55 × 1.6 = 88 km/h. Dividing by 1.6 instead of multiplying gives 55 ÷ 1.6 ≈ 34.38 km/h, going the wrong way between the units. Adding the conversion factor instead of multiplying gives 55 + 1.6 = 56.6 km/h, treating the factor as an amount rather than a multiplier. Multiplying by 0.6 instead of 1.6 gives 55 × 0.6 = 33 km/h, using only part of the conversion factor. 55 mph is equal to 88 km/h.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (b) 20 km — The scale 2 cm : 5 km means each 1 cm on the map represents 5 ÷ 2 = 2.5 km in real life. The footpath is 8 cm on the map, so its real length is 8 × 2.5 = 20 km. 40 km comes from multiplying 8 by 5 directly, ignoring that the scale's '2 cm' has to be divided out first: 8 × 5 = 40. 3.2 km comes from dividing 8 by 2.5 instead of multiplying: 8 ÷ 2.5 = 3.2. 5 km comes from multiplying 2.5 by the scale's '2' instead of by the footpath's 8 cm: 2.5 × 2 = 5.
- (a) 675 ml — How much a jug holds is a volume, and volumes of similar solids scale with the cube of the length scale factor. The length scale factor is 12 ÷ 8 = 1.5, so the volume scale factor is 1.5 × 1.5 × 1.5 = 3.375. The larger jug holds 200 × 3.375 = 675 ml. Multiplying the scale factor by 3 instead of raising it to the power 3 is the mistake to guard against here.
- (d) 250 cm³/s — Method: first change litres per minute into cm³ per minute, then change per minute into per second. Working: 15 × 1000 = 15000 cm³ per minute, then 15000 ÷ 60 = 250 cm³ per second. So the tank fills at 250 cm³ per second. Distractor 15000 cm³/s comes from stopping after the first step and forgetting to change minutes into seconds. Distractor 900000 cm³/s comes from multiplying by 60 instead of dividing. Distractor 2500 cm³/s comes from dividing by 6 instead of 60.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (a) 10/7 — Put Saturday's distance over Sunday's distance: 17.5/12.25. Multiply both numbers by 100 to clear the decimals: 1750/1225. Divide both by their highest common factor, 175: 1750÷175 = 10, 1225÷175 = 7, giving 10/7. (7/10 comes from writing the distances the wrong way round. 3/7 comes from finding the difference, 17.5 − 12.25 = 5.25 km, and writing it as a fraction of Sunday's distance, 5.25/12.25. 10/17 comes from comparing Saturday's distance to the total distance ridden, 17.5/29.75.)
- (b) 900 N/m² — Pressure = force ÷ area, so 45 ÷ 0.05 = 900 N/m². Working out 45 ÷ 5 = 9 misplaces the decimal point in the area, treating 0.05 m² as 5 m². Working out 45 × 0.05 = 2.25 multiplies force and area together instead of dividing. Working out 45 + 0.05 = 45.05 simply adds the two given numbers, which does not give a pressure at all. The pressure on the ground is 900 N/m².
- (b) 24 km/h — First convert 45 minutes to hours: 45 ÷ 60 = 0.75 hours. Then divide the distance by the time: 18 ÷ 0.75 = 24 km/h. Reading 45 minutes as 0.45 hours (writing the minutes after the decimal point instead of dividing by 60) gives 18 ÷ 0.45 = 40 km/h. Working out 18 × 0.75 = 13.5 multiplies by the time instead of dividing. Working out 18 ÷ 45 = 0.4 divides by 45 without ever converting the minutes to hours. The cyclist's average speed is 24 km/h.
- (c) 2 : 5 — A ratio is written in the order the question names the two shapes, so triangle A's length comes first: 4 : 10. Both parts divide by 2: 4 ÷ 2 = 2 and 10 ÷ 2 = 5, giving 2 : 5. Lengths are compared using the lengths themselves, so nothing is squared here; squaring both parts would give the ratio of the areas instead.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (b) Car A, 50 km/h — Method: speed = distance ÷ time for each car, then compare. Working: Car A = 150 ÷ 3 = 50 km/h. Car B = 180 ÷ 4 = 45 km/h. Since 50 > 45, Car A is faster, travelling at 50 km/h. Wrong options: Car B, 45 km/h correctly finds Car B's speed but wrongly names the slower car as faster; Car A, 45 km/h picks the correct car but uses Car B's speed by mistake; Car B, 50 km/h picks the wrong car but uses Car A's correct speed value.
- (b) 7.2 m — Multiply the model wingspan by the scale factor: 15 × 48 = 720. This is in centimetres, and 720 cm = 7.2 m, since 1 m = 100 cm. Giving 0.31 m divides by the scale factor instead of multiplying (15 ÷ 48 ≈ 0.31), scaling the model down rather than the real aircraft up. Giving 72 m converts centimetres to metres by dividing by 10 instead of 100. Giving 0.72 m converts by dividing by 1000 instead of 100.
Build your own mix at the worksheet builder.