Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) 19.0 g/cm³ — Density = mass ÷ volume. 342.6 ÷ 18 = 19.0333…, which rounds to 19.0 g/cm³ (1 d.p.). 6166.8 g/cm³ comes from multiplying the mass by the volume instead of dividing (342.6 × 18). 324.6 g/cm³ comes from subtracting the volume from the mass (342.6 − 18) instead of dividing. 0.1 g/cm³ comes from dividing the volume by the mass instead of the mass by the volume (18 ÷ 342.6 = 0.0525…, rounded to 1 d.p.).
- (d) 8/5 — Two masses can only be compared once they are in the same unit. Since 1 kg is 1000 g, the recipe needs 1200 g. The recipe's mass is being written as a fraction of Dan's mass, so 1200 goes on the top and 750 on the bottom, giving 1200/750. The highest common factor of the two is 150: 1200 ÷ 150 = 8 and 750 ÷ 150 = 5. The fraction is 8/5, which is greater than 1 because the recipe needs more flour than Dan has.
- (d) 26.6 — Find the constant multiplier — the mass of each metre of pipe: 12.6 ÷ 4.5 = 2.8, so the mass is always 2.8 times the length. For a length of 9.5 m, the mass is 9.5 × 2.8 = 26.6 kg. 17.6 comes from assuming an additive relationship instead of a multiplicative one — adding the increase in length (9.5 − 4.5 = 5) onto 12.6. 3.4 comes from using the multiplier the wrong way round (4.5 ÷ 12.6, rounded to 1 d.p.), then multiplying by 9.5. 12.6 comes from simply repeating the given mass, without applying the multiplier to the new length.
- (c) 1.2 — Add the parts of the ratio: 6 + 1 = 7. Divide the total amount by the number of parts: 8.4 ÷ 7 = 1.2 litres, which is the value of one part and also the amount of syrup, since syrup is 1 part. (7.2 litres is the amount of water, using 6 parts instead of 1. 1.4 comes from dividing 8.4 by 6 — the water's part of the ratio — instead of dividing by the total number of parts, 7. 0.84 comes from dividing 8.4 by 10 instead of by 7.)
- (d) 15 cm — An enlargement by scale factor 3 means every length is multiplied by 3: 5 × 3 = 15 cm. Dividing by the scale factor instead, 5 ÷ 3 = 1.7 (to 1 d.p.), gives 1.7 cm — dividing shrinks the plan rather than enlarging it. Adding the scale factor instead of multiplying, 5 + 3 = 8, gives 8 cm. Squaring the scale factor, as you would for an area, 5 × 3² = 45, gives 45 cm — length scales by the factor itself, not its square.
- (c) 9 g/cm³ — Density = mass ÷ volume, so 270 ÷ 30 = 9 g/cm³. Working out 270 − 30 = 240 subtracts the volume from the mass instead of dividing. Writing 270 gives the mass on its own, without dividing by the volume at all. Working out 270 × 30 = 8100 multiplies mass and volume together instead of dividing. The density of the block is 9 g/cm³.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (c) 25 — Method: divide the larger number by its ratio part to find the value of one part, then multiply by the smaller number's ratio part. Working: 40 ÷ 8 = 5 (value of one part). Smaller number = 5 × 5 = 25. Wrong options: 64 comes from dividing by the smaller ratio part instead of the larger (40 ÷ 5 × 8); 45 comes from adding the value of one part onto 40 instead of scaling down (40 + 5); 35 comes from subtracting the value of one part from 40 (40 − 5) instead of multiplying it by the smaller ratio part.
- (b) 5 m — A scale of 1 : 500 means 1 cm on the plan represents 500 cm in real life. Converting to metres: 500 ÷ 100 = 5 m. 500 m comes from forgetting to convert the 500 cm into metres at all. 50 m comes from dividing by 10 instead of 100 when converting centimetres to metres: 500 ÷ 10 = 50. 0.5 m comes from dividing by 1000 instead of 100, as if converting to kilometres instead of metres: 500 ÷ 1000 = 0.5.
- (a) 1.375 — The multiplier is the new value divided by the original value: 176 000 ÷ 128 000 = 1.375. Choosing 0.375 comes from working out the increase as a fraction of the original (48 000 ÷ 128 000 = 0.375) and stopping there, without adding on the 1 whole that represents the original turnover. Choosing 0.727 comes from dividing the 2023 turnover by the 2024 turnover, the wrong way round (128 000 ÷ 176 000, rounded to 3 decimal places). Choosing 137.5 comes from writing the multiplier as a percentage — the 2024 turnover is 137.5% of the 2023 turnover — instead of converting it to the decimal multiplier 1.375.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (c) A straight line through the origin, rising from left to right — Two quantities are in direct proportion when one is a constant multiple of the other, so their graph is a straight line through the origin: when one quantity is 0 the other is 0 as well, and doubling one doubles the other. A straight line crossing the vertical axis at 5 has a fixed amount added on, so when the horizontal quantity is 0 the vertical quantity is 5, not 0 — a straight line on its own is not enough for direct proportion. A curve that falls steeply and then levels off without touching either axis shows inverse proportion: one quantity grows as the other shrinks, and their product stays the same. A horizontal line at a height of 3 shows a quantity that does not change at all as the other one grows, so it is not proportional to it.
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (b) Car A, 50 km/h — Method: speed = distance ÷ time for each car, then compare. Working: Car A = 150 ÷ 3 = 50 km/h. Car B = 180 ÷ 4 = 45 km/h. Since 50 > 45, Car A is faster, travelling at 50 km/h. Wrong options: Car B, 45 km/h correctly finds Car B's speed but wrongly names the slower car as faster; Car A, 45 km/h picks the correct car but uses Car B's speed by mistake; Car B, 50 km/h picks the wrong car but uses Car A's correct speed value.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
Build your own mix at the worksheet builder.