Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) 4/3 — The amount of yellow paint is 0.75 times the amount of blue paint. As a fraction, 0.75 = 3/4, so yellow = 3/4 of blue. To write blue as a fraction of yellow, use the reciprocal: flip 3/4 to get 4/3. 3/4 comes from keeping the original fraction without inverting it. 1/4 comes from computing 1 − 3/4 = 1/4, which is not how a fraction reverses. 40/3 comes from converting 0.75 to a fraction as 75/1000 = 3/40 (misplacing the decimal point), then inverting that.
- (c) 4 : 5 — Method: a formula of the form y = kx says that for every 1 of x there are k of y, so the ratio y : x is k : 1, which is then written with whole numbers and cancelled. Working: here k = 0.8, so y : x = 0.8 : 1; multiplying both parts by 10 gives 8 : 10, and dividing both parts by their highest common factor 2 gives 4 : 5. Answer: 4 : 5. The distractors: 5 : 4 comes from writing x : y, reversing the order asked for; 8 : 10 has the decimal cleared but the ratio left unsimplified, and the question asks for the simplest form; 8 : 1 comes from multiplying only the left-hand part by 10 and leaving the 1 unchanged, which changes the relationship instead of keeping it.
- (c) 10 g — Method: mass = density × volume. Working: 2 × 5 = 10, in grams because the density is in grams per cubic centimetre. Answer: 10 g. The distractors: 2.5 g comes from dividing the volume by the density, 5 ÷ 2, instead of multiplying; 0.4 g comes from dividing the density by the volume, 2 ÷ 5; 7 g comes from adding the density and the volume.
- (c) 2:3 — Divide both parts by the common factor 3a: 6a ÷ 3a = 2 and 9a ÷ 3a = 3, giving the ratio 2 : 3.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (a) £54 — Method: for direct proportion, wage = rate × hours. Working: £9 × 6 = £54. Wrong options: £15 comes from adding the rate and the hours instead of multiplying (£9 + 6); £63 comes from using 7 hours instead of 6; £1.50 comes from dividing the rate by the hours instead of multiplying (£9 ÷ 6).
- (a) 600 cm — Method: a scale of 1 : n means each 1 cm on the plan stands for n cm in real life, so multiply the plan length by the scale. Working: 3 × 200 = 600. Answer: 600 cm. The distractors: 60 cm comes from multiplying by 20 instead of 200; 203 cm comes from adding the scale to the plan length instead of multiplying; 6000 cm comes from reading the scale as 1 : 2000.
- (c) 24p — Method: change the price to pence, then find what one tenth of 1 kg costs, since 100 g is one tenth of 1 kg. Working: £2.40 = 240p per kg, and 240 ÷ 10 = 24p per 100 g. So the cost is 24p per 100 g. Distractor 2.4p comes from dividing by 100 instead of 10. Distractor 2400p comes from multiplying by 10 instead of dividing. Distractor 240p comes from using the price per kg without scaling it down to 100 g.
- (c) 7800 kg/m³ — Method: build the conversion factor from the two unit changes separately — one for the mass, one for the volume. Working: 1 kg = 1000 g, so the mass figure is divided by 1000; 1 m = 100 cm, so 1 m³ = 100 × 100 × 100 = 1000000 cm³ and the volume figure is multiplied by 1000000. The density figure is therefore multiplied by 1000000 ÷ 1000 = 1000, giving 7.8 × 1000 = 7800. So the density of the metal is 7800 kg/m³. Distractor 780 kg/m³ comes from multiplying by 100 instead of 1000. Distractor 78000 kg/m³ comes from multiplying by 10000, an extra zero. Distractor 7.8 kg/m³ comes from not converting the units at all.
- (b) 8 — The gradient of a line through the origin is the y-value divided by the x-value at any point on the line. Using (10, 80): gradient = 80 ÷ 10 = 8.
- (a) 5 — Pressure = force ÷ area = 20 ÷ 4 = 5 pascals. Getting 80 comes from multiplying the force and area instead of dividing. Getting 16 comes from subtracting the area from the force (20 − 4 = 16) instead of dividing. Getting 24 comes from adding the force and area (20 + 4 = 24) instead of dividing.
- (d) d ÷ t — Average speed = distance ÷ time, so the expression is d ÷ t. Writing t ÷ d inverts the formula, giving the time per kilometre instead of the speed. Writing d × t confuses speed with the formula for distance travelled (distance = speed × time) used the wrong way round. Writing d + t treats the relationship as additive instead of using division.
- (a) 3/2 — Find each average speed: car = 180 ÷ 3 = 60 mph; lorry = 160 ÷ 4 = 40 mph. Put the car's speed over the lorry's speed: 60/40. Divide both numbers by their highest common factor, 20: 60÷20 = 3, 40÷20 = 2, giving 3/2. (2/3 comes from writing the speeds the wrong way round. 9/8 comes from comparing the distances travelled, 180/160, without working out the speeds. 3/4 comes from comparing the times taken, 3/4, instead of the speeds.)
- (b) 1 : 3 — Write the two lengths as a ratio: 5 : 15. Divide both parts by their highest common factor, 5, to give 1 : 3. Writing 3 : 1 swaps the order, comparing B to A instead of A to B. Leaving the ratio as 5 : 15 has not been simplified. Finding 1 : 2 comes from comparing the smaller length to the gap between the two lengths (15 − 5 = 10, then wrongly simplifying 5 : 10), not from comparing the two lengths themselves.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
Build your own mix at the worksheet builder.