Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 4 : 15 — Convert to the same unit first: 1.5 kg = 1500 g, since 1 kg = 1000 g. This gives the ratio 400 : 1500. Divide both parts by their highest common factor, 100, to get 4 : 15. Giving 40 : 150 divides by 10 only, which is not the highest common factor, so it is not fully simplified. Giving 15 : 4 swaps the order. Giving 4 : 1.5 has not converted 1.5 kg into grams, so the two parts are not measured in the same unit.
- (c) 3 hours — Method: in inverse proportion the product of the two quantities is constant, and here that product is the distance. Working: 60 × 4 = 240 km, so at 80 km/h the time is 240 ÷ 80 = 3. Answer: 3 hours. The distractors: 5 hours 20 minutes comes from treating the relationship as direct, working out 4 × 80 ÷ 60; 2 hours 40 minutes comes from cutting the time by the fraction the speed rose by — the speed went up by one third, so the time was cut by one third — which is not how inverse proportion works; 4 hours comes from dividing the 240 km by the original speed of 60 km/h again instead of by the new speed.
- (b) 8:12 — Method: two ratios are equivalent when one is obtained from the other by multiplying, or dividing, both parts by the same number. Working: multiplying both parts of 2:3 by 4 gives 2 × 4 = 8 and 3 × 4 = 12, and the check runs the other way too, since the highest common factor of 8 and 12 is 4 and dividing both parts by 4 returns 2:3. Answer: 8:12. The distractors: 8:3 comes from multiplying only the first part by 4 and leaving the second part alone; 12:8 comes from multiplying both parts by 4 correctly but then writing the two parts the wrong way round; 4:5 comes from adding 2 to each part instead of multiplying, and adding the same amount to both parts changes the ratio.
- (a) 135 minutes — Method: to change hours into minutes, multiply by 60. Working: 2.25 × 60 = 135 minutes. So the film runs for 135 minutes. Distractor 145 minutes comes from reading the '.25' as 25 minutes instead of a quarter of an hour, giving 2 hours 25 minutes. Distractor 225 minutes comes from multiplying by 100 instead of 60. Distractor 150 minutes comes from rounding 2.25 hours to 2.5 hours before converting.
- (c) £0.90 — Cost per kilogram = total cost ÷ mass. £4.50 ÷ 5 = £0.90. £1.11 comes from dividing the mass by the cost instead of the cost by the mass (5 ÷ 4.50). £22.50 comes from multiplying the cost by the mass instead of dividing (£4.50 × 5). £0.50 comes from subtracting the two numbers (5 − 4.50) instead of dividing.
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (b) 3:2 — Write both fractions over a common denominator of 4: 3/4 stays as 3/4, and 1/2 = 2/4. Comparing the numerators gives the ratio 3 : 2. Getting 2 : 3 swaps the two parts round. Getting 3 : 1 comes from using the numerator of the first fraction and the original numerator of the second fraction (1) without converting to a common denominator. Getting 2 : 1 comes from using only the denominators, 4 and 2, and simplifying those instead of the numerators.
- (b) 2/5 — The ratio red : yellow is 6:15, so write red over yellow: 6/15. Divide both numbers by their highest common factor, 3: 6÷3 = 2, 15÷3 = 5, giving 2/5. (5/2 comes from writing the ratio the wrong way round, yellow over red, 15/6, which simplifies to 5/2. 2/7 comes from comparing the red paint to the total amount of paint, 6 parts out of 21. 5/7 comes from comparing the yellow paint to the total amount of paint, 15 parts out of 21.)
- (d) 60 — Method: 75% is three quarters, so divide by 4 to find one quarter and then multiply by 3. Working: 80 ÷ 4 = 20 for one quarter, and 3 × 20 = 60. Answer: 60 milk chocolates. The distractors: 20 is one quarter of 80, which is 25% and not 75%; 55 comes from subtracting 25 from 80 rather than taking 25% of 80 away from it; 75 comes from quoting the percentage itself as a number of chocolates.
- (a) 20% — Method: a percentage concentration compares the sugar with the whole solution, so add the two masses to get the mass of solution and then scale the ratio of sugar to solution to a denominator of 100. Working: the solution has a mass of 200 + 50 = 250 g; sugar:solution = 50:250, and scaling to per 100 gives 50 ÷ 250 × 100 = 20, so the ratio is 20:100. Answer: 20%. The distractors: 25% comes from comparing the sugar with the 200 g of water, 50:200, rather than with the whole solution; 80% is the percentage of the solution that is water, 200:250, which answers for the wrong part of the mixture; 0.2% comes from working out 50 ÷ 250 = 0.2 and writing that decimal down as a percentage without multiplying by 100.
- (d) 3/2 — Work out the number of altos: 40% of 30 = 12. The rest are sopranos, so there are 30 − 12 = 18 sopranos. Form the fraction 18/12; both numbers share a factor of 6, so 18 ÷ 6 = 3 and 12 ÷ 6 = 2, giving 3/2. 2/3 comes from writing the fraction the wrong way round, as altos over sopranos (12/18). 3/5 comes from comparing the sopranos with the whole choir (18/30), instead of with the altos. 7/3 comes from miscalculating 30 − 12 as 28 instead of 18, then forming 28/12.
- (a) 4 days — Method: the fence is a fixed amount of work, so builders × days is constant; find that product and divide it by the new number of builders. Working: 3 × 12 = 36 builder-days of work, so with 9 builders the time is 36 ÷ 9 = 4 days. Answer: 4 days. The distractors: 6 days comes from halving the 12 days because there are more builders, rather than dividing by the factor of 3 by which the workforce has grown; 36 days is the constant product of builders and days, given as a number of days instead of being shared between the builders; 9 days comes from taking 3 days off the 12, treating three extra builders as three fewer days, which is additive rather than proportional.
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (c) Yes — 700 ÷ 7 = 100 ml for the 1 part of concentrate — Method: add the ratio parts to find the total number of parts, divide the total volume by this, then use the ratio to find concentrate's share. Working: 1 + 6 = 7 parts. 700 ÷ 7 = 100 ml per part. Concentrate = 1 part = 100 ml, so Freya is correct. Wrong options: 'divide 700 by 6' uses only one of the ratio numbers instead of the total of 7 parts, giving about 117 ml; '600 ml is concentrate' swaps which ratio number belongs to the concentrate and which belongs to the water; 'half of 700 ml should be concentrate' ignores the ratio altogether and assumes an equal split.
- (d) £200 — Method: add the parts of the ratio, divide the total paid by the number of parts to find the value of one part, then multiply by the parts in the most expensive item. Working: 2 + 3 + 5 = 10 parts, £400 ÷ 10 = £40 for one part, and the most expensive item is 5 parts, so 5 × £40 = £200. Answer: £200. The distractors: £40 is the value of one part; £80 is the 2-part item, the cheapest of the three; £120 is the 3-part item.
Build your own mix at the worksheet builder.