Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) 3 : 7 — Method: a ratio 'of A to B' is written with A first, and it is simplified by dividing both parts by their highest common factor. Working: vans are named first, so the ratio starts as 15 : 35; the highest common factor of 15 and 35 is 5, and 15 ÷ 5 = 3 while 35 ÷ 5 = 7. Answer: 3 : 7. The distractors: 7 : 3 comes from writing the two numbers in the order they appear in the question, cars before vans, instead of the order asked for; 3 : 10 comes from comparing the vans with the total number of vehicles, 15 : 50, a part-to-whole ratio in place of the part-to-part ratio asked for; 15 : 35 is the right comparison left unsimplified, and the question asks for the simplest form.
- (b) 2.5 hours — Method: when two objects move in opposite directions the gap between them grows at the sum of their speeds, so divide the required gap by that combined rate. Working: 80 + 60 = 140 km of gap each hour, and 350 ÷ 140 = 2.5. Answer: 2.5 hours. The distractors: 17.5 hours comes from subtracting the speeds, 80 − 60 = 20, which is the rate for two cars travelling in the same direction; 5 hours comes from using the mean of the two speeds, 70 km/h, instead of their sum; 4.375 hours comes from dividing 350 by 80 and ignoring the second car altogether.
- (d) 8 — The product of price and number of tickets is constant: k = 4 × 12 = 48. At £6 per ticket, the number of tickets is 48 ÷ 6 = 8. Getting 18 comes from treating price and tickets as directly proportional and working out 12 × 6 ÷ 4 instead of dividing k by the new price. Getting 12 assumes the number of tickets does not change when the price changes. Getting 6 comes from writing down the new price instead of working out the number of tickets.
- (b) 1500 — The rate is 3 ÷ 2 = 1.5 litres per minute. Converting to cm³: 1.5 × 1000 = 1500 cm³ per minute. Getting 3000 comes from converting 3 litres to cm³ first (3000 cm³) and forgetting to divide by the 2 minutes. Getting 750 comes from dividing by the 2 minutes a second time after converting (1500 ÷ 2). Getting 2000 comes from converting the 2 minutes as if it were litres (2 × 1000) instead of using the correct rate of 1.5 litres per minute.
- (b) 3.5 — Method: work out each percentage of its number separately, then subtract the smaller result from the larger one. Working: 45% of 70 = 31.5, and 35% of 80 = 28, so the difference is 31.5 − 28 = 3.5. Answer: 3.5. 11.5 comes from pairing the percentages with the wrong numbers, working out 35% of 70 = 24.5 and 45% of 80 = 36, and finding their difference. 59.5 comes from adding the two correct results, 31.5 + 28, instead of subtracting them. 10 comes from simply subtracting the two percentages themselves, 45 − 35, without applying them to the numbers at all.
- (b) 4/5 — Write the mass of the beans over the mass of the soup: 400/500. Divide the top and bottom by 100 to get 4/5. Choosing 5/4 comes from writing the soup's mass over the beans' mass, the wrong way round. Choosing 1/5 comes from finding the difference in mass (500 − 400 = 100) and writing that over the mass of the soup, instead of using the mass of the beans. Choosing 5/9 comes from writing the mass of the soup over the total mass of both tins (500 out of 900), instead of over the mass of the beans.
- (c) 40° — Method: the three angles of a triangle always add up to 180°, so split 180° into the number of parts shown by the ratio. Working: the ratio 2:3:4 has 2 + 3 + 4 = 9 parts, so one part is 180 ÷ 9 = 20°, and the smallest angle is 2 × 20 = 40°. So the smallest angle is 40°. Distractor 60° is the middle-sized angle, 3 parts. Distractor 80° is the largest angle, 4 parts. Distractor 20° is the value of one part, found correctly but never multiplied by 2.
- (c) £450 — Method: use the equal ratios 4:5 = 200:x to find Grace's savings, then add the two amounts. Working: Noah's £200 is 4 parts, so one part is £200 ÷ 4 = £50; Grace has 5 parts, so 5 × £50 = £250; altogether £200 + £250 = £450. Answer: £450. The distractors: £250 is Grace's savings on their own, which is the middle step rather than the total the question asks for; £360 comes from reading £200 as the 5 parts instead of the 4, giving one part of £40 and a total of 9 × £40; £400 comes from doubling £200, which treats the two savings as equal and ignores the ratio altogether.
- (a) 12/5 — If A is 5/12 of B, then B is the reciprocal of that fraction times A: flip 5/12 to get 12/5, so B is 12/5 of A. 5/12 comes from keeping the same fraction without flipping it, treating the relationship as if it works the same way in both directions. 7/12 comes from computing 1 − 5/12 = 7/12, which is not how a fraction reverses. 12/7 comes from subtracting 5 from 12 to get 7, and writing 12 over that, instead of swapping the numerator and denominator of 5/12.
- (d) 40 cm — Method: convert the real length to centimetres, then divide by the scale factor. Working: 10 m = 1000 cm. 1000 ÷ 25 = 40 cm. Wrong options: 0.4 cm comes from dividing 10 by 25 without converting metres to centimetres first; 25000 cm comes from multiplying instead of dividing (1000 × 25); 4 cm comes from converting 10 m to 100 cm (using ×10 instead of ×100) before dividing.
- (a) 1500 ml — Method: to change litres into millilitres, multiply by 1000. Working: 1.5 × 1000 = 1500 ml. So the bottle holds 1500 ml. Distractor 150 ml comes from multiplying by 100 instead of 1000. Distractor 15000 ml comes from multiplying by 10000, an extra zero. Distractor 1.5 ml comes from not converting the units at all.
- (a) The plumber charges £20 for each extra hour worked — The gradient is the change in C divided by the change in h: (85 − 45) ÷ (3 − 1) = 40 ÷ 2 = £20. On this graph the gradient represents the extra amount charged for each extra hour worked, so the answer is 'The plumber charges £20 for each extra hour worked'. Not dividing by the change in h gives 40, the option that reads 'charges £40 for each extra hour worked' — that is the total change in cost between the two points, not the rate per hour. Reading off the C-value of the first point, 45, gives the option using £45 — that is the cost of a job lasting 1 hour, not the rate. Treating the gradient as a flat total charge regardless of the time taken misunderstands what a straight-line graph through two different h-values shows: the cost does depend on h, so it cannot be a single fixed total.
- (d) 13/10 — First find the selling price: £150 + £45 = £195. Put the selling price over the cost price: 195/150. Divide both numbers by their highest common factor, 15: 195÷15 = 13, 150÷15 = 10, giving 13/10. (10/13 comes from writing the prices the wrong way round. 3/10 is just the profit written as a fraction of the cost price, 45/150, not the selling price. 13/23 comes from comparing the selling price to the combined total of the cost price and the selling price, 195/345.)
- (a) 18/25 — First find the new number of rose bushes: 90 × 1.2 = 108 (a 20% increase multiplies by 1.2). Then write 108 over 150 and divide top and bottom by 6 to get 18/25. Choosing 3/5 comes from using the original 90 rose bushes without applying the 20% increase (90/150 = 3/5). Choosing 25/18 comes from writing the number of lavender bushes over the new number of rose bushes, the wrong way round. Choosing 3/25 comes from multiplying 90 by 0.2 instead of 1.2, finding only the increase (18) rather than the new total, then writing 18/150 = 3/25.
- (d) 0.6 g/cm³ — Density = mass ÷ volume. 60 ÷ 100 = 0.6 g/cm³. 1.67 g/cm³ comes from dividing the volume by the mass instead of the mass by the volume (100 ÷ 60). 6000 g/cm³ comes from multiplying the mass by the volume instead of dividing (60 × 100). 40 g/cm³ comes from subtracting the mass from the volume (100 − 60) instead of dividing.
Build your own mix at the worksheet builder.