Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) 4/3 — Work out the number of bananas: 3/4 of 16 = 12. Form the fraction 16/12 (apples over bananas); both numbers share a factor of 4, so 16 ÷ 4 = 4 and 12 ÷ 4 = 3, giving 4/3. 3/4 comes from giving the fraction that was already stated in the question (bananas as a fraction of apples), instead of inverting it. 4/1 comes from reading '3/4 of the apples' as 'the apples reduced by 3/4', giving only 4 bananas, then 16/4 = 4. 4/7 comes from comparing the apples with the total number of pieces of fruit (16/28), instead of with the bananas alone.
- (b) £52 — Method: the difference between the two ratio numbers tells you how many parts the £39 difference represents. Working: the difference in parts is 7 − 4 = 3, and this represents £39, so one part is £39 ÷ 3 = £13. Josh's savings are 4 × £13 = £52. So Josh has £52. Distractor £91 is Mia's savings, not Josh's. Distractor £39 comes from using the given £39 difference as the final answer, without scaling it to Josh's number of parts. Distractor £13 is the value of one part, found correctly but never multiplied by 4.
- (a) £9.00 — Rate of pay = total pay ÷ number of hours. £54 ÷ 6 = £9.00 per hour. £324.00 comes from multiplying the pay by the hours instead of dividing (£54 × 6). £0.11 comes from dividing the hours by the pay instead of the pay by the hours (6 ÷ 54). £48.00 comes from subtracting the hours from the pay (£54 − 6) instead of dividing.
- (b) 1 : 500 — smallest real distance per cm (5 m), most detail — Method: compare what one centimetre represents in real life for each scale — the scale with the smallest real distance per cm shows the most detail. Working: for 1 : 500, 1 cm represents 500 cm (5 m); for 1 : 5000, 1 cm represents 50 m; for 1 : 50 000, 1 cm represents 500 m. Since 5 m is the smallest, 1 : 500 shows the most detail. Wrong options: '1 : 50 000 — covers the largest real area' wrongly assumes covering more area means more detail, when it is the opposite; '1 : 5000 — the middle value' wrongly assumes the middle scale is automatically the most balanced; '1 : 500 — covers the largest real distance' picks the correct scale but states an incorrect fact, since 1 : 500 actually covers the smallest real distance per cm.
- (b) £52,000 — Method: convert 130% to a decimal multiplier and multiply it by last year's profit. Working: 130% = 1.3, so this year's profit is £40,000 × 1.3 = £52,000. Answer: £52,000. £12,000 comes from using only the extra 30% (130% − 100%) and forgetting to include the original 100%, £40,000 × 0.3 = £12,000. £40,130 comes from simply adding 130 onto £40,000, treating the percentage as an amount of money rather than a multiplier. £5,200 comes from misreading 130% as 13%, giving £40,000 × 0.13 = £5,200.
- (a) 1260 — To increase by 5%, multiply by 1.05 (100% + 5%). 1200 × 1.05 = 1260. 60 comes from working out only the increase (1200 × 0.05) and forgetting to add it to the original population. 1205 comes from adding 5 directly to 1200 instead of 5% of 1200. 1800 comes from multiplying by 1.5, using 50% instead of 5%.
- (a) 375 g — Find the amount of flour needed per muffin: 150 ÷ 6 = 25 g. Multiply by the new number of muffins: 25 × 15 = 375 g. (60 g comes from using the scale factor the wrong way round, 6/15 × 150. 150 g comes from not scaling the recipe at all. 300 g comes from rounding the scale factor, 15 ÷ 6, down to 2 before multiplying.)
- (c) m = 6c — Method: the whole is the sum of the parts in the ratio, and the cement is 1 part, so one part weighs c kg. Working: the mix has 5 + 1 = 6 parts, each of mass c kg, so the total mass is 6 × c, giving m = 6c. Answer: m = 6c. The distractors: m = 5c uses the 5 gravel parts as the multiplier and forgets that the cement is in the mix too, so it gives the mass of the gravel and not the total; m = c + 5 comes from reading the ratio as '5 more than' and adding, which treats a number of parts as a mass in kilograms; m = c/6 turns the relationship upside down, as though the total were shared into the cement rather than the cement multiplied up to the total.
- (b) 9 — Method: divide the known quantity by its ratio number to find the value of one part, then multiply by the other ratio number. Working: 21 ÷ 7 = 3 (value of one part). Red beads = 3 × 3 = 9. Wrong options: 49 comes from dividing by the wrong ratio number (21 ÷ 3 × 7); 24 comes from adding the ratio number for red (3) to 21 instead of scaling; 14 comes from subtracting the ratio number for blue (7) from 21 instead of scaling.
- (b) £60 — £48 represents 100% − 20% = 80% of the original price. 1% = £48 ÷ 80 = £0.60, so 100% = £0.60 × 100 = £60.
- (a) 135 minutes — Method: to change hours into minutes, multiply by 60. Working: 2.25 × 60 = 135 minutes. So the film runs for 135 minutes. Distractor 145 minutes comes from reading the '.25' as 25 minutes instead of a quarter of an hour, giving 2 hours 25 minutes. Distractor 225 minutes comes from multiplying by 100 instead of 60. Distractor 150 minutes comes from rounding 2.25 hours to 2.5 hours before converting.
- (b) 4/5 — Write the mass of the beans over the mass of the soup: 400/500. Divide the top and bottom by 100 to get 4/5. Choosing 5/4 comes from writing the soup's mass over the beans' mass, the wrong way round. Choosing 1/5 comes from finding the difference in mass (500 − 400 = 100) and writing that over the mass of the soup, instead of using the mass of the beans. Choosing 5/9 comes from writing the mass of the soup over the total mass of both tins (500 out of 900), instead of over the mass of the beans.
- (d) 3/2 — The length of the blue ribbon goes on the top and the length of the red ribbon goes on the bottom, giving 45/30. Both parts divide by 15: 45 ÷ 15 = 3 on the top, and 30 ÷ 15 = 2 on the bottom. So the fraction is 3/2. It is greater than 1 because the blue ribbon is longer than the red one, and a fraction of one quantity compared with another is allowed to be top-heavy.
- (b) 20 km — The scale 2 cm : 5 km means each 1 cm on the map represents 5 ÷ 2 = 2.5 km in real life. The footpath is 8 cm on the map, so its real length is 8 × 2.5 = 20 km. 40 km comes from multiplying 8 by 5 directly, ignoring that the scale's '2 cm' has to be divided out first: 8 × 5 = 40. 3.2 km comes from dividing 8 by 2.5 instead of multiplying: 8 ÷ 2.5 = 3.2. 5 km comes from multiplying 2.5 by the scale's '2' instead of by the footpath's 8 cm: 2.5 × 2 = 5.
- (a) 3/2 — Find each average speed: car = 180 ÷ 3 = 60 mph; lorry = 160 ÷ 4 = 40 mph. Put the car's speed over the lorry's speed: 60/40. Divide both numbers by their highest common factor, 20: 60÷20 = 3, 40÷20 = 2, giving 3/2. (2/3 comes from writing the speeds the wrong way round. 9/8 comes from comparing the distances travelled, 180/160, without working out the speeds. 3/4 comes from comparing the times taken, 3/4, instead of the speeds.)
Build your own mix at the worksheet builder.