Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) 120 km/h — Method: for a fixed distance the average speed multiplied by the time is constant, and that constant is the distance, so divide the distance by the new time. Working: speed × time = 240, so in 2 hours the speed needed is 240 ÷ 2 = 120 km/h. Answer: 120 km/h. The distractors: 80 km/h is the average speed of the original journey, 240 ÷ 3, which answers for the 3-hour timing rather than the 2-hour one; 160 km/h comes from halving the 3 hours to 1.5 hours and working out 240 ÷ 1.5, instead of using the 2 hours the question gives; 480 km/h comes from multiplying the distance by the 2 hours rather than dividing by it.
- (d) 4/7 — Put the tomato plant's height over the sunflower's height: 80/140. Divide both numbers by their highest common factor, 20: 80÷20 = 4, 140÷20 = 7, giving 4/7. (7/4 comes from writing the heights the wrong way round. 3/7 comes from finding the difference in the heights, 140 − 80 = 60 cm, and writing it as a fraction of the sunflower's height, 60/140. 4/11 comes from comparing the tomato plant's height to the total height of both plants, 80/220.)
- (d) 25% — Method: percentage decrease = decrease ÷ original amount × 100. Working: the reduction is £60 − £45 = £15, and 15 ÷ 60 = 0.25, so 0.25 × 100 = 25%. Answer: 25%. The distractors: 15% comes from quoting the £15 reduction as though pounds and per cent were the same thing; 33% comes from dividing the £15 by the new price £45 instead of by the original £60, which gives 33% to the nearest per cent; 75% is the new price written as a percentage of the old one, which is what is still paid rather than what has been taken off.
- (a) 20% — Method: a percentage concentration compares the sugar with the whole solution, so add the two masses to get the mass of solution and then scale the ratio of sugar to solution to a denominator of 100. Working: the solution has a mass of 200 + 50 = 250 g; sugar:solution = 50:250, and scaling to per 100 gives 50 ÷ 250 × 100 = 20, so the ratio is 20:100. Answer: 20%. The distractors: 25% comes from comparing the sugar with the 200 g of water, 50:200, rather than with the whole solution; 80% is the percentage of the solution that is water, 200:250, which answers for the wrong part of the mixture; 0.2% comes from working out 50 ÷ 250 = 0.2 and writing that decimal down as a percentage without multiplying by 100.
- (c) 2.5 — x : y = 2 : 5 means that for every matching pair of values, y ÷ x = 5 ÷ 2 = 2.5. So y = 2.5x, and comparing with y = kx gives k = 2.5. Dividing the other way round, 2 ÷ 5 = 0.4, gives x in terms of y — that is the constant for x = 0.4y, not for y = kx. Taking the y-part of the ratio on its own, 5, reads one number off the ratio instead of dividing the y-part by the x-part; 5 would only be right if the x-part were 1. Subtracting the two parts, 5 − 2 = 3, treats the ratio as a difference, but a ratio compares two quantities by multiplication, not by subtraction. The constant is k = 2.5.
- (a) 3/8 — Convert 2 hours to minutes: 2 hours = 120 minutes. Form the fraction 45/120. Both numbers share a factor of 15, so 45 ÷ 15 = 3 and 120 ÷ 15 = 8, giving 3/8. 8/3 comes from writing the fraction the wrong way round, as 120/45. 9/40 comes from converting 2 hours using ×100 instead of ×60, treating it as 200 minutes, then simplifying 45/200. 45/2 comes from not converting the hours to minutes at all, and writing 45 over 2.
- (a) The plumber charges £20 for each extra hour worked — The gradient is the change in C divided by the change in h: (85 − 45) ÷ (3 − 1) = 40 ÷ 2 = £20. On this graph the gradient represents the extra amount charged for each extra hour worked, so the answer is 'The plumber charges £20 for each extra hour worked'. Not dividing by the change in h gives 40, the option that reads 'charges £40 for each extra hour worked' — that is the total change in cost between the two points, not the rate per hour. Reading off the C-value of the first point, 45, gives the option using £45 — that is the cost of a job lasting 1 hour, not the rate. Treating the gradient as a flat total charge regardless of the time taken misunderstands what a straight-line graph through two different h-values shows: the cost does depend on h, so it cannot be a single fixed total.
- (d) 3 : 2 : 5 — The highest common factor of 45, 30 and 75 is 15. Divide each part by 15: 45 ÷ 15 = 3, 30 ÷ 15 = 2 and 75 ÷ 15 = 5, giving 3 : 2 : 5. Giving 9 : 6 : 15 divides by 5, a common factor but not the highest one. Giving 15 : 10 : 25 divides by 3 only, even further from simplest form. Giving 2 : 3 : 5 has the first two parts swapped.
- (a) 22p — First convert the hourly rate to pence: £13.20 = 1320p. Then convert from per hour to per minute by dividing by 60, since there are 60 minutes in an hour: 1320 ÷ 60 = 22p per minute. Working out 1320 × 60 = 79200p multiplies by 60 instead of dividing, going the wrong way between per hour and per minute. Working out 13.20 × 10 = 132p converts pounds to pence using the wrong power of ten, and dividing that by 60 carries the error through to give 2.2p. Working out 13.20 × 100 = 1320p converts the currency correctly but stops there, leaving the rate as pence per hour rather than completing the second conversion to pence per minute. The rate of pay is 22p per minute.
- (d) 3:8 — Convert 2 hours to minutes: 2 hours = 120 minutes. The ratio is 45 : 120. The highest common factor of 45 and 120 is 15. Divide both parts by 15: 45 ÷ 15 = 3 and 120 ÷ 15 = 8, giving 3 : 8. Leaving the hours unconverted gives 45 : 2 — the units on each side are different, so this does not compare like with like. Dividing by 5 instead of 15 gives 9 : 24, which still shares a common factor of 3, so it is not fully simplified. Swapping the order gives 8 : 3, hours to minutes instead of minutes to hours.
- (c) 2:5 — Divide both numbers by their highest common factor, 4: 8 ÷ 4 = 2 and 20 ÷ 4 = 5, giving the ratio 2:5. Choosing 5:2 comes from writing the ratio the wrong way round, as cupcakes to muffins. Choosing 2:3 comes from using the difference between the two amounts (20 − 8 = 12) as the second part of the ratio instead of the number of cupcakes, then simplifying 8:12 by dividing by 4. Choosing 2:7 comes from comparing the muffins with the total number of items on the tray (8 out of 28) instead of comparing them with the cupcakes.
- (c) m = 6c — Method: the whole is the sum of the parts in the ratio, and the cement is 1 part, so one part weighs c kg. Working: the mix has 5 + 1 = 6 parts, each of mass c kg, so the total mass is 6 × c, giving m = 6c. Answer: m = 6c. The distractors: m = 5c uses the 5 gravel parts as the multiplier and forgets that the cement is in the mix too, so it gives the mass of the gravel and not the total; m = c + 5 comes from reading the ratio as '5 more than' and adding, which treats a number of parts as a mass in kilograms; m = c/6 turns the relationship upside down, as though the total were shared into the cement rather than the cement multiplied up to the total.
- (b) 3/10 — Total parts = 2 + 3 + 5 = 10. Potatoes make up 3 parts, so the fraction is 3/10.
- (c) 3 hours — Method: inverse proportion means speed × time is constant for the journey, so find that constant and divide it by the new speed. Working: 60 × 2 = 120, which is the distance in kilometres; at 40 km/h the time is 120 ÷ 40 = 3 hours. Answer: 3 hours. The distractors: 1.5 hours is the ratio of the speeds, 60 ÷ 40, given as a time instead of being used to scale the original 2 hours; 1 hour 20 minutes comes from treating time as directly proportional to speed, 2 × 40 ÷ 60, which has the slower train arriving sooner; 2 hours comes from finding the constant 120 and then dividing it by the original 60 km/h again, so the time never changes.
- (b) £10 — Method: find the cost of 1 kg by dividing, then multiply by the mass wanted — the unitary method for direct proportion. Working: £6 ÷ 3 = £2 per kg, and £2 × 5 = £10. Answer: £10. The distractors: £11 comes from adding 5 to the £6 instead of scaling; £30 comes from multiplying £6 by 5 without first dividing by 3; £3.60 comes from turning the proportion upside down, dividing by 5 and multiplying by 3.
Build your own mix at the worksheet builder.