Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (d) 25% — Method: percentage decrease = decrease ÷ original amount × 100. Working: the reduction is £60 − £45 = £15, and 15 ÷ 60 = 0.25, so 0.25 × 100 = 25%. Answer: 25%. The distractors: 15% comes from quoting the £15 reduction as though pounds and per cent were the same thing; 33% comes from dividing the £15 by the new price £45 instead of by the original £60, which gives 33% to the nearest per cent; 75% is the new price written as a percentage of the old one, which is what is still paid rather than what has been taken off.
- (d) 450 g — Find the amount of rice per person: 300 ÷ 4 = 75 g. Multiply by the new number of people: 75 × 6 = 450 g. Giving 200 g swaps which number the rice is divided and multiplied by (300 ÷ 6 × 4 = 200), scaling the wrong way. Giving 180 g uses 4 + 6 = 10 as the base instead of the original 4 people (300 × 6 ÷ 10 = 180). Giving 400 g assumes each of the 2 extra people needs 300 ÷ 6 = 50 g on top of the original 300 g (300 + 2 × 50 = 400), rather than scaling the whole amount in proportion.
- (c) 3 hours — Time = distance ÷ speed, so 210 ÷ 70 = 3 hours. Working out 210 − 70 = 140 subtracts the speed from the distance instead of dividing. Working out 210 + 70 = 280 adds the two values together, which does not give a time. Working out 210 × 70 = 14700 multiplies distance and speed together instead of dividing. The journey takes 3 hours.
- (c) £22.50 — Method: find the cost of 1 kg, then multiply by the mass wanted. Working: £36 ÷ 2.4 = £15 per kilogram, and 1.5 × £15 = £22.50. Answer: £22.50. The distractors: £15 is the price of 1 kg, which is the first step and not what the question asks for; £54 comes from multiplying the £36 by 1.5 without first reducing it to a price per kilogram; £57.60 comes from using the scale factor upside down, multiplying £36 by 2.4 ÷ 1.5 = 1.6 instead of by 1.5 ÷ 2.4.
- (b) 48 m² — Method: lengths are multiplied by the scale factor, but areas are multiplied by its square. Working: 1 cm on the plan stands for 200 cm = 2 m, so 1 cm² on the plan stands for 2 × 2 = 4 m², and 12 × 4 = 48. Answer: 48 m². The distractors: 24 m² comes from scaling the area by the length factor 2 instead of by its square; 2400 m² comes from multiplying the area by the scale 200 as though it were a length; 4800 m² comes from working in centimetres, 12 × 200² = 480 000 cm², and then dividing by 100 instead of by 10 000 to reach square metres.
- (a) y is always 4 times x. — Check the multiplier for each pair: 12 ÷ 3 = 4, 20 ÷ 5 = 4, 32 ÷ 8 = 4 — the same multiplier every time, so y is always 4 times x. 'x is always 4 times y' comes from writing the multiplier the wrong way round. 'y is always x plus 9' only works for the first pair (3 + 9 = 12); it gives 14 for x = 5 and 17 for x = 8, not 20 and 32. 'y is always double x, plus 6' also only works for the first pair (3 × 2 + 6 = 12); it gives 16 for x = 5, not 20.
- (c) 2:3 — Divide both parts by the common factor 3a: 6a ÷ 3a = 2 and 9a ÷ 3a = 3, giving the ratio 2 : 3.
- (b) 80 — Method: the difference between 40% and 25% of the number is 15% of the number, and that difference is 12. Working: 15% of the number is 12, so 1% of the number is 12 ÷ 15 = 0.8, and the number is 0.8 × 100 = 80. Check: 40% of 80 is 32, 25% of 80 is 20, and 32 − 20 = 12. Answer: 80. The distractors: 30 comes from solving 40% of the number = 12; 48 comes from solving 25% of the number = 12; 15 is the percentage difference written as the answer.
- (b) 35 N/m² — Pressure = force ÷ area. 84 ÷ 2.4 = 35 N/m². 201.6 N/m² comes from multiplying the force by the area instead of dividing (84 × 2.4). 81.6 N/m² comes from subtracting the area from the force (84 − 2.4) instead of dividing. 0.03 N/m² comes from dividing the area by the force instead of the force by the area (2.4 ÷ 84).
- (b) 1 : 500 — smallest real distance per cm (5 m), most detail — Method: compare what one centimetre represents in real life for each scale — the scale with the smallest real distance per cm shows the most detail. Working: for 1 : 500, 1 cm represents 500 cm (5 m); for 1 : 5000, 1 cm represents 50 m; for 1 : 50 000, 1 cm represents 500 m. Since 5 m is the smallest, 1 : 500 shows the most detail. Wrong options: '1 : 50 000 — covers the largest real area' wrongly assumes covering more area means more detail, when it is the opposite; '1 : 5000 — the middle value' wrongly assumes the middle scale is automatically the most balanced; '1 : 500 — covers the largest real distance' picks the correct scale but states an incorrect fact, since 1 : 500 actually covers the smallest real distance per cm.
- (c) 25 — Find the constant multiplier from the given pair: 15 ÷ 6 = 2.5, so y is always 2.5 times x. When x = 10, y = 10 × 2.5 = 25. 19 comes from assuming an additive relationship instead of a multiplicative one — adding the difference 15 − 6 = 9 onto 10. 4 comes from using the multiplier the wrong way round (6 ÷ 15 = 0.4) and then multiplying by 10. 15 comes from simply repeating the given value of y, without applying the multiplier to the new value of x at all.
- (b) 7.2 m — Multiply the model wingspan by the scale factor: 15 × 48 = 720. This is in centimetres, and 720 cm = 7.2 m, since 1 m = 100 cm. Giving 0.31 m divides by the scale factor instead of multiplying (15 ÷ 48 ≈ 0.31), scaling the model down rather than the real aircraft up. Giving 72 m converts centimetres to metres by dividing by 10 instead of 100. Giving 0.72 m converts by dividing by 1000 instead of 100.
- (b) 8:12 — Method: two ratios are equivalent when one is obtained from the other by multiplying, or dividing, both parts by the same number. Working: multiplying both parts of 2:3 by 4 gives 2 × 4 = 8 and 3 × 4 = 12, and the check runs the other way too, since the highest common factor of 8 and 12 is 4 and dividing both parts by 4 returns 2:3. Answer: 8:12. The distractors: 8:3 comes from multiplying only the first part by 4 and leaving the second part alone; 12:8 comes from multiplying both parts by 4 correctly but then writing the two parts the wrong way round; 4:5 comes from adding 2 to each part instead of multiplying, and adding the same amount to both parts changes the ratio.
- (d) The cyclist's speed, in kilometres per hour — Method: on any straight-line graph the gradient is the change in the quantity on the vertical axis for each 1 unit of the quantity on the horizontal axis, so its meaning is read off the two axis labels. Working: the vertical axis is distance in kilometres and the horizontal axis is time in hours, so the gradient counts kilometres for each hour, and distance for each hour is speed. Answer: the cyclist's speed, in kilometres per hour. The distractors: 'the total distance the cyclist travels, in kilometres' reads the gradient as a value taken off the vertical axis, but a gradient is a rate and no end point of the journey has been given; 'the time the cyclist takes, in hours' names the horizontal axis, which is the quantity the gradient divides by rather than the gradient itself; 'the distance the cyclist travels in 18 hours' treats the 18 as a value of t, when 18 is the steepness of the line and not a point on it.
Build your own mix at the worksheet builder.