Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) 4:5 — Write the ratio pounds : dollars as 1 : 1.25. Multiply both parts by 4 to clear the decimal: 1 × 4 = 4 and 1.25 × 4 = 5, giving 4 : 5. (5:4 comes from writing the ratio the wrong way round, dollars to pounds. 1:1 comes from rounding 1.25 dollars down to the nearest whole dollar. 1:5 comes from multiplying only the dollars by 4 to clear the decimal and leaving the pounds as 1 — both parts of a ratio must be multiplied by the same number.)
- (c) 5 m — The scale 1 : 100 means 1 cm on the map represents 100 cm in real life. The path is 5 cm on the map, so the real length is 5 × 100 = 500 cm. Convert to metres: 500 cm = 5 m. Dividing instead of multiplying, 5 ÷ 100 = 0.05, gives 0.05 m — the scale must be used to make the real object bigger than the map, not smaller. Leaving the answer as 500 without converting to metres and calling it 500 m mistakes centimetres for metres. Using a scale of 1 : 1000 instead of the given 1 : 100 gives 5 × 1000 = 5000 cm = 50 m, ten times too large.
- (a) 8:1 — Multiply both parts of the ratio by 4 to clear the fraction: 2 × 4 = 8 and 1/4 × 4 = 1, giving 8 : 1. Getting 1 : 8 has the two parts the wrong way round. Getting 2 : 4 comes from writing down the denominator of the fraction (4) as the second part instead of multiplying through by it. Getting 8 : 4 comes from multiplying only the first part of the ratio by 4 and leaving the second part as the fraction's denominator.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (c) 2/7 — Method: each number in a ratio counts parts, so the whole is all the parts added together, and the fraction wanted is the cement parts over that total. Working: the mix has 5 + 2 = 7 parts altogether, and 2 of those parts are cement, so the cement is 2/7 of the mix. Answer: 2/7. The distractors: 2/5 comes from writing the cement parts over the sand parts, comparing one part with the other part instead of with the whole; 5/7 comes from writing the sand parts over the total, which answers about the wrong material; 7/2 comes from writing the total over the cement parts, turning the fraction upside down.
- (d) £5.40 — Method: work out the reduced price at each shop separately, then subtract the smaller from the larger. Working: Shop A's reduced price is £45 × 0.8 = £36, and Shop B's reduced price is £34 × 0.9 = £30.60, so the difference is £36 − £30.60 = £5.40. Answer: £5.40. £11.00 comes from comparing the two ORIGINAL prices, £45 − £34, without applying either shop's reduction at all. £1.60 comes from finding Shop A's reduced price correctly, £36, but then subtracting Shop B's original (unreduced) price of £34 instead of its reduced price. £66.60 comes from adding the two reduced prices together, £36 + £30.60, instead of subtracting them.
- (a) y is always 4 times x. — Check the multiplier for each pair: 12 ÷ 3 = 4, 20 ÷ 5 = 4, 32 ÷ 8 = 4 — the same multiplier every time, so y is always 4 times x. 'x is always 4 times y' comes from writing the multiplier the wrong way round. 'y is always x plus 9' only works for the first pair (3 + 9 = 12); it gives 14 for x = 5 and 17 for x = 8, not 20 and 32. 'y is always double x, plus 6' also only works for the first pair (3 × 2 + 6 = 12); it gives 16 for x = 5, not 20.
- (c) 3 hours — Time = distance ÷ speed, so 210 ÷ 70 = 3 hours. Working out 210 − 70 = 140 subtracts the speed from the distance instead of dividing. Working out 210 + 70 = 280 adds the two values together, which does not give a time. Working out 210 × 70 = 14700 multiplies distance and speed together instead of dividing. The journey takes 3 hours.
- (c) 2 hours — Method: time = distance ÷ speed, and the units of the speed fix the unit of the time. Working: 120 ÷ 60 = 2, and because the speed is in kilometres per hour the time is in hours. Answer: 2 hours. The distractors: 0.5 hours comes from dividing the speed by the distance, 60 ÷ 120, the division the wrong way round; 2 minutes comes from the correct division but the wrong unit, reading kilometres per hour as kilometres per minute; 180 minutes comes from adding 120 and 60 instead of dividing.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (c) £450 — Method: use the equal ratios 4:5 = 200:x to find Grace's savings, then add the two amounts. Working: Noah's £200 is 4 parts, so one part is £200 ÷ 4 = £50; Grace has 5 parts, so 5 × £50 = £250; altogether £200 + £250 = £450. Answer: £450. The distractors: £250 is Grace's savings on their own, which is the middle step rather than the total the question asks for; £360 comes from reading £200 as the 5 parts instead of the 4, giving one part of £40 and a total of 9 × £40; £400 comes from doubling £200, which treats the two savings as equal and ignores the ratio altogether.
- (c) 4/5 — Find 20% of £45: 10% is £4.50, so 20% is £9. The sale price is £45 − £9 = £36. Form the fraction 36/45; both numbers share a factor of 9, so 36 ÷ 9 = 4 and 45 ÷ 9 = 5, giving 4/5. 1/5 comes from writing the discount itself as a fraction of the normal price (9/45), instead of the sale price. 6/5 comes from adding the 20% instead of subtracting it, giving a sale price of £54, then 54/45 = 6/5. 5/9 comes from treating 'reduced by 20%' as 'reduced by £20', giving a sale price of £25, then 25/45 = 5/9.
- (b) −1% — Method: write each change as a multiplier and multiply them. A 10% fall is × 0.9 and a 10% rise is × 1.1. Working: 0.9 × 1.1 = 0.99, so the final price is 99% of the original, which is 1% less. Answer: an overall change of −1%. The distractors: 0% comes from assuming a 10% fall and a 10% rise cancel — they do not, because the rise is 10% of a smaller amount; +1% has the size right but the sign wrong, from reading the multiplier 0.99 as 1% above 1 instead of 1% below it; −2% comes from finding the 1% fall and then counting it once for each of the two changes.
- (a) 15 cm — Take the square root of each part of the area ratio to find the length ratio: the square root of 4 is 2 and the square root of 25 is 5, giving a length ratio of 2 : 5. Multiply the smaller flag's height by the scale factor 5 ÷ 2 = 2.5: 6 × 2.5 = 15, so the larger flag is 15 cm tall. Giving 37.5 cm uses the area ratio, 25 ÷ 4 = 6.25, directly as the scale factor without square-rooting it first (6 × 6.25 = 37.5). Giving 2.4 cm applies the length ratio the wrong way round, scaling the smaller flag down by 2 ÷ 5 instead of up by 5 ÷ 2 (6 × 0.4 = 2.4). Giving 27 cm adds the difference between the two area-ratio numbers, 25 − 4 = 21, onto the smaller height instead of using it as a scale factor (6 + 21 = 27).
- (b) 75 g — Method: split the total mass into the number of parts shown by the ratio, then find the mass of tin. Working: the ratio 7:3 has 7 + 3 = 10 parts, so one part is 250 ÷ 10 = 25 g, and the mass of tin is 3 × 25 = 75 g. So the alloy contains 75 g of tin. Distractor 175 g is the mass of copper, not tin. Distractor 125 g comes from splitting the alloy into two equal halves, ignoring the ratio. Distractor 25 g is the value of one part, found correctly but never multiplied by 3.
Build your own mix at the worksheet builder.