Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) 1 : 25 — The radii are in the ratio 4 : 20, which simplifies to 1 : 5. Areas scale with the square of the length ratio, so the area ratio is 1² : 5² = 1 : 25. Giving 1 : 5 uses the radius ratio without squaring it. Giving 1 : 10 doubles the radius ratio instead of squaring it. Giving 25 : 1 has the areas the right way round for larger to smaller, not smaller to larger.
- (d) 7/4 — A part-to-part ratio a : b gives the fraction a/b when the first quantity is written as a fraction of the second, so 7 : 4 gives 7/4. Writing 4/7 puts the parts the wrong way round — blue as a fraction of red, not red as a fraction of blue. Writing 7/11 uses the total number of counters, 7 + 4 = 11, as the denominator instead of the number of blue counters — that is red as a fraction of the whole bag, not red as a fraction of blue. Writing 11/7 has both the wrong denominator and the parts inverted.
- (d) 3/5 — Put the school journey time over the gym journey time: 12/20. Divide both numbers by their highest common factor, 4: 12÷4 = 3, 20÷4 = 5, giving 3/5. (5/3 comes from writing the times the wrong way round. 2/5 comes from finding the difference in the times, 20 − 12 = 8 minutes, and writing it as a fraction of the gym time, 8/20. 3/8 comes from comparing the school time to the total time for both journeys, 12/32.)
- (a) The plumber charges £20 for each extra hour worked — The gradient is the change in C divided by the change in h: (85 − 45) ÷ (3 − 1) = 40 ÷ 2 = £20. On this graph the gradient represents the extra amount charged for each extra hour worked, so the answer is 'The plumber charges £20 for each extra hour worked'. Not dividing by the change in h gives 40, the option that reads 'charges £40 for each extra hour worked' — that is the total change in cost between the two points, not the rate per hour. Reading off the C-value of the first point, 45, gives the option using £45 — that is the cost of a job lasting 1 hour, not the rate. Treating the gradient as a flat total charge regardless of the time taken misunderstands what a straight-line graph through two different h-values shows: the cost does depend on h, so it cannot be a single fixed total.
- (a) 70 km/h — Method: average speed for a whole journey is the total distance divided by the total time, not the mean of the separate speeds. Working: 3 × 80 = 240 km and 1 × 40 = 40 km, giving 280 km in 3 + 1 = 4 hours, so 280 ÷ 4 = 70. Answer: 70 km/h. The distractors: 60 km/h comes from taking the mean of 80 and 40, which would only be right if equal times were spent at each speed; 280 km/h is the total distance written with a speed unit, from forgetting to divide by the total time; 80 km/h comes from quoting the speed of the longer leg as the average for the whole journey.
- (c) £21 — Method: the two amounts are in the same ratio as 5:3, so write 5:3 = 35:x, find the value of one part and then take the number of parts asked for. Working: Harry's £35 is 5 parts, so one part is £35 ÷ 5 = £7; Isla has 3 parts, so 3 × £7 = £21. Answer: £21. The distractors: £7 is the value of a single part, given as Isla's share instead of being multiplied by the 3 parts she has; £28 comes from finding one part correctly and then working out £35 − £7, subtracting one part from Harry's money instead of taking three parts; £33 comes from treating the ratio additively — the parts differ by 5 − 3 = 2, so £2 is taken off Harry's £35, but a ratio compares by multiplying, not by subtracting.
- (c) 40 cm — Method: split the total length into the number of parts shown by the ratio, then find the value of the shorter share. Working: the ratio 4:5 has 4 + 5 = 9 parts, so one part is 90 ÷ 9 = 10 cm, and the shorter piece is 4 × 10 = 40 cm. So the shorter piece is 40 cm. Distractor 50 cm is the length of the LONGER piece, not the shorter one. Distractor 45 cm comes from splitting the ribbon into two equal halves, ignoring the ratio. Distractor 10 cm is the value of one part, found correctly but never multiplied by 4.
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (a) 9:11 — Method: divide both parts of the ratio by their highest common factor. Working: the factors of 18 are 1, 2, 3, 6, 9 and 18, and the factors of 22 are 1, 2, 11 and 22, so the highest common factor is 2; 18 ÷ 2 = 9 and 22 ÷ 2 = 11. Answer: 9:11. The distractors: 11:9 comes from dividing both parts correctly but writing them the wrong way round, so it describes 22 to 18 rather than 18 to 22; 9:22 comes from dividing only the first part by 2 and leaving the second part untouched; 9:13 comes from subtracting 9 from each part instead of dividing, since 18 − 9 = 9 and 22 − 9 = 13, and subtracting the same amount from both parts does not give an equivalent ratio.
- (d) 3200 × 0.88³ — A fall of 12% leaves 88% of the value, because 100 − 12 = 88, and 88% written as a decimal multiplier is 0.88. Decay repeats that multiplier once for each year, so over 3 years it is applied three times: 0.88 × 0.88 × 0.88, which is written 0.88³. The calculation is therefore 3200 × 0.88³. Adding the percentages to make a single fall of 36% would be wrong, because each year's fall is taken from a smaller value than the year before.
- (a) 1000m — Method: kilograms are a smaller unit than tonnes, so change tonnes into kilograms by multiplying by 1000. Working: m tonnes = m × 1000 kg = 1000m kg. So the expression is 1000m. Distractor m/1000 comes from dividing by 1000 instead of multiplying, which would make the number of kilograms smaller than the number of tonnes, the wrong way round. Distractor 1000 + m comes from adding the conversion factor instead of multiplying by it. Distractor m − 1000 comes from subtracting the conversion factor instead of multiplying by it.
- (a) 1 : 2 000 000 — Method: a scale is a ratio between two lengths written in the same unit, reduced so that the map distance is 1. Working: 120 km = 120 × 1000 × 100 = 12 000 000 cm, so the ratio is 6 : 12 000 000, and dividing both parts by 6 gives 1 : 2 000 000. Answer: 1 : 2 000 000. The distractors: 1 : 12 000 000 comes from writing the real length in centimetres without dividing by the 6 cm on the map; 1 : 200 000 comes from taking 120 km as 1 200 000 cm, one conversion step short, before dividing by 6; 1 : 20 000 comes from converting 120 km to 120 000 m and treating those metres as centimetres.
- (d) 40 cm — Method: convert the real length to centimetres, then divide by the scale factor. Working: 10 m = 1000 cm. 1000 ÷ 25 = 40 cm. Wrong options: 0.4 cm comes from dividing 10 by 25 without converting metres to centimetres first; 25000 cm comes from multiplying instead of dividing (1000 × 25); 4 cm comes from converting 10 m to 100 cm (using ×10 instead of ×100) before dividing.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (d) 2:3:5 — The highest common factor of 12, 18 and 30 is 6. Divide every part by 6: 12 ÷ 6 = 2, 18 ÷ 6 = 3, 30 ÷ 6 = 5, giving 2 : 3 : 5. Dividing by 2 instead of 6 gives 6 : 9 : 15, which still shares a common factor of 3, so it is not fully simplified. Dividing by 3 instead of 6 gives 4 : 6 : 10, which still shares a common factor of 2, so it is not fully simplified either. Swapping the first two parts gives 3 : 2 : 5, the parts in the wrong order.
Build your own mix at the worksheet builder.