Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) 4/5 — Find 20% of £45: 10% is £4.50, so 20% is £9. The sale price is £45 − £9 = £36. Form the fraction 36/45; both numbers share a factor of 9, so 36 ÷ 9 = 4 and 45 ÷ 9 = 5, giving 4/5. 1/5 comes from writing the discount itself as a fraction of the normal price (9/45), instead of the sale price. 6/5 comes from adding the 20% instead of subtracting it, giving a sale price of £54, then 54/45 = 6/5. 5/9 comes from treating 'reduced by 20%' as 'reduced by £20', giving a sale price of £25, then 25/45 = 5/9.
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (b) 10000 cm² — Method: an area conversion factor is the square of the length conversion factor, because both sides of the square are scaled. Working: a square metre is a square of side 100 cm, so its area is 100 × 100 = 10000 cm². Answer: 10000 cm². The distractors: 100 cm² comes from using the length factor without squaring it; 200 cm² comes from doubling the length factor instead of squaring it; 1000000 cm² comes from cubing the factor, which is the conversion for a volume, not an area.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (c) Map A, where the distance is 40 cm — 10 km = 1,000,000 cm. On Map A: 1000000 ÷ 25000 = 40 cm. On Map B: 1000000 ÷ 50000 = 20 cm. Since 40 cm is longer than 20 cm, the same real distance appears longer on Map A, the map with the smaller scale number. 'Map B, where the distance is 20 cm' has the correct working for Map B but names the wrong map as the one with the longer length. 'Map A, where the distance is 20 cm' correctly identifies Map A but pairs it with Map B's length. 'Map B, where the distance is 40 cm' correctly identifies Map A's length but attaches it to the wrong map.
- (a) 40 m² — A scale of 1 : 10 is a length scale factor of 10 from model to real. Areas scale with the square of the length scale factor: 10² = 100. 0.4 × 100 = 40, so the real staircase covers 40 m². Giving 4 m² uses the length scale factor, 10, without squaring it (0.4 × 10 = 4). Giving 0.04 m² divides by the scale factor instead of multiplying by its square (0.4 ÷ 10 = 0.04). Giving 400 m² cubes the scale factor, 10³ = 1000, as if area scaled like a volume (0.4 × 1000 = 400).
- (c) 180 pages — The gradient is (9 − 24) ÷ (300 − 0) = −15 ÷ 300 = −0.05, so the cartridge uses 0.05 ml of ink per page. At p = 300 there are 9 ml left. The extra pages before the cartridge is empty is 9 ÷ 0.05 = 180 pages. Giving 9 as the answer confuses the millilitres of ink remaining with the number of pages remaining — they are different quantities with different units. Multiplying instead of dividing, 9 × 0.05 = 0.45, does not undo the rate correctly. Working out the total number of pages a full cartridge lasts, 24 ÷ 0.05 = 480 pages, answers how many pages the cartridge prints in total from full, not how many more pages it can print from the 300-page point.
- (c) 200 students — Method: find the percentage who have a brother or a sister, taking care that the students with both are not counted twice, then take that percentage from 100% and apply the result to the 400 students. Working: 25% + 40% = 65%, but the 15% with both has been counted in each of those figures, so 65% − 15% = 50% have a brother or a sister; that leaves 100% − 50% = 50%, and 50% of 400 = 200. Answer: 200 students. The distractors: 260 students is 65% of 400, the number with a brother or a sister when the 15% overlap is counted twice; 140 students comes from taking that same uncorrected 65% away from the 400; 300 students comes from subtracting only the 25% with a brother and ignoring the sisters altogether.
- (a) 20% — Method: a percentage is a number of parts per hundred, so divide the numerator by the denominator and multiply by 100. Working: 1 ÷ 5 = 0.2, and 0.2 × 100 = 20; the same result comes from scaling 1/5 to 20/100. Answer: 20%. The distractors: 5% comes from reading the denominator 5 straight off as the percentage; 25% comes from confusing 1/5 with 1/4, the fraction met most often in percentage work; 50% comes from a place value slip in the division, writing 1 ÷ 5 as 0.5 instead of 0.2.
- (a) £102 — Method: find the value of one part of the ratio, then work out each group's share before comparing them. Working: the ratio 5:2 has 5 + 2 = 7 parts, so one part is £238 ÷ 7 = £34. Adults donate 5 × £34 = £170 and children donate 2 × £34 = £68, so adults donate £170 − £68 = £102 more than children. So the difference is £102. Distractor £68 is only the children's donation, without finding the difference. Distractor £170 is only the adults' donation, without finding the difference. Distractor £136 comes from doubling the children's donation instead of subtracting it from the adults' donation.
- (a) 0.62 miles — The gradient of the line is the change in miles divided by the change in kilometres: 31 ÷ 50 = 0.62, so 1 kilometre converts to 0.62 miles. Dividing the wrong way round, 50 ÷ 31 = 1.612..., rounds to 1.61 miles — that finds how many kilometres are in 1 mile, not the reverse. Doubling the gradient, 1.24 miles, comes from using 62 ÷ 50 instead of 31 ÷ 50. Reading off the y-coordinate of the given point without dividing by the x-coordinate gives 31.00 miles, which is the number of miles for 50 kilometres, not for 1 kilometre.
- (d) 30 — Method: 50% is one half, so 50% of a quantity is the quantity divided by 2. Working: 60 ÷ 2 = 30. Answer: 30. The distractors: 120 comes from multiplying by 2 instead of dividing; 3000 comes from multiplying by 50 without dividing by 100; 6 comes from finding 10% instead of 50%.
- (a) 5/12 — Work out the distance still to travel: 372 − 217 = 155 miles. Form the fraction 155/372; both numbers share a factor of 31, so 155 ÷ 31 = 5 and 372 ÷ 31 = 12, giving 5/12. 7/12 comes from writing the distance already travelled as the fraction of the journey (217/372 = 7/12), instead of the distance still to travel. 145/372 comes from miscalculating 372 − 217 as 145 instead of 155. 5/7 comes from comparing the remaining distance with the distance already travelled (155/217 = 5/7), instead of with the total journey.
- (c) C = 1.5n — Method: a fixed ratio between C and n means C is always the same multiple of n, and that multiple is the cost of one bottle. Working: 3.00 ÷ 2 = 1.5, 7.50 ÷ 5 = 1.5 and 12.00 ÷ 8 = 1.5, so every bottle costs £1.50 and C = 1.5n. Answer: C = 1.5n. The distractors: C = n + 1 comes from subtracting on the first row, 3 − 2 = 1, and adding that difference instead of multiplying; it fits the first row and fails the other two, which is why three rows are given; C = 3n reads the £3.00 as the price of one bottle when it is the price of two; C = n/1.5 divides the number of bottles by the price of one bottle, which works out how many bottles a pound buys instead of what n bottles cost.
- (a) The plumber charges £20 for each extra hour worked — The gradient is the change in C divided by the change in h: (85 − 45) ÷ (3 − 1) = 40 ÷ 2 = £20. On this graph the gradient represents the extra amount charged for each extra hour worked, so the answer is 'The plumber charges £20 for each extra hour worked'. Not dividing by the change in h gives 40, the option that reads 'charges £40 for each extra hour worked' — that is the total change in cost between the two points, not the rate per hour. Reading off the C-value of the first point, 45, gives the option using £45 — that is the cost of a job lasting 1 hour, not the rate. Treating the gradient as a flat total charge regardless of the time taken misunderstands what a straight-line graph through two different h-values shows: the cost does depend on h, so it cannot be a single fixed total.
Build your own mix at the worksheet builder.