Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) 5/7 — First find the number of children: 84 − 35 = 49. The question compares the adults with the children, not with everyone on the bus, so the denominator is 49 and the numerator is 35, giving 35/49. Both parts divide by 7: 35 ÷ 7 = 5 and 49 ÷ 7 = 7. In its simplest form the fraction is 5/7.
- (c) 4 : 5 — Method: a formula of the form y = kx says that for every 1 of x there are k of y, so the ratio y : x is k : 1, which is then written with whole numbers and cancelled. Working: here k = 0.8, so y : x = 0.8 : 1; multiplying both parts by 10 gives 8 : 10, and dividing both parts by their highest common factor 2 gives 4 : 5. Answer: 4 : 5. The distractors: 5 : 4 comes from writing x : y, reversing the order asked for; 8 : 10 has the decimal cleared but the ratio left unsimplified, and the question asks for the simplest form; 8 : 1 comes from multiplying only the left-hand part by 10 and leaving the 1 unchanged, which changes the relationship instead of keeping it.
- (a) 12/5 — If A is 5/12 of B, then B is the reciprocal of that fraction times A: flip 5/12 to get 12/5, so B is 12/5 of A. 5/12 comes from keeping the same fraction without flipping it, treating the relationship as if it works the same way in both directions. 7/12 comes from computing 1 − 5/12 = 7/12, which is not how a fraction reverses. 12/7 comes from subtracting 5 from 12 to get 7, and writing 12 over that, instead of swapping the numerator and denominator of 5/12.
- (c) 6.00 m — Method: the ratio of height to shadow length is the same for both objects. Working: road sign height ÷ shadow = 3 ÷ 5 = 0.6. Lamppost height = 0.6 × 10 = 6.00 m. Wrong options: 16.67 m comes from inverting the ratio, using shadow ÷ height instead of height ÷ shadow (10 × 5 ÷ 3); 8.00 m comes from adding the difference between the two shadow lengths to the road sign's height instead of scaling (3 + (10 − 5)); 1.50 m comes from multiplying by the ratio of the two shadow lengths the wrong way round (3 × 5 ÷ 10).
- (b) £10 — Method: find the cost of 1 kg by dividing, then multiply by the mass wanted — the unitary method for direct proportion. Working: £6 ÷ 3 = £2 per kg, and £2 × 5 = £10. Answer: £10. The distractors: £11 comes from adding 5 to the £6 instead of scaling; £30 comes from multiplying £6 by 5 without first dividing by 3; £3.60 comes from turning the proportion upside down, dividing by 5 and multiplying by 3.
- (b) 1:25 — Write the ratio time : volume using the numbers in the question: 8 : 200. Divide both parts by their highest common factor, 8, to give 1 : 25. (25:1 comes from writing the ratio the wrong way round, volume : time. 8:25 comes from dividing only the volume by 8 and leaving the time unchanged. 25:8 is that same mistake written the wrong way round.)
- (b) 1.5 km — Multiply the map length by the scale factor: 6 × 25000 = 150000 cm. Convert to kilometres, using 100 cm = 1 m and 1000 m = 1 km, so 100000 cm = 1 km: 150000 ÷ 100000 = 1.5 km. (1500 km comes from converting only as far as metres, 150000 ÷ 100 = 1500 m, and then writing kilometres on the end. 15 km comes from dividing by 10000 instead of 100000. 0.15 km comes from dividing by 1000000 instead of 100000.)
- (a) 2978 — A rise of 6% is a multiplier of 1.06, applied once for each year. After year 1: 2500 × 1.06 = 2650. After year 2: 2650 × 1.06 = 2809. After year 3: 2809 × 1.06 = 2977.54, which is 2978 to the nearest whole number. Multiplying by 1.18 in one go would be wrong, because the second and third years grow from larger numbers than the first.
- (a) 28.8 km/h — Method: first change metres per second into metres per hour, then change metres into kilometres. Working: 8 × 3600 = 28800 metres per hour, then 28800 ÷ 1000 = 28.8 km/h. So the runner's speed is 28.8 km/h. Distractor 28800 km/h comes from stopping after the first step and forgetting to change metres into kilometres. Distractor 2.22 km/h comes from dividing by 3600 instead of multiplying, then multiplying by 1000. Distractor 2.88 km/h comes from using 360 instead of 3600 seconds in an hour, missing a zero.
- (a) 4 days — Method: the fence is a fixed amount of work, so builders × days is constant; find that product and divide it by the new number of builders. Working: 3 × 12 = 36 builder-days of work, so with 9 builders the time is 36 ÷ 9 = 4 days. Answer: 4 days. The distractors: 6 days comes from halving the 12 days because there are more builders, rather than dividing by the factor of 3 by which the workforce has grown; 36 days is the constant product of builders and days, given as a number of days instead of being shared between the builders; 9 days comes from taking 3 days off the 12, treating three extra builders as three fewer days, which is additive rather than proportional.
- (c) £90 — Method: split the total amount into the number of parts shown by the ratio, then find Chloe's share. Working: the ratio 2:3 has 2 + 3 = 5 parts, so one part is £150 ÷ 5 = £30, and Chloe's share is 3 × £30 = £90. So Chloe receives £90. Distractor £60 is Ben's share, not Chloe's. Distractor £75 comes from splitting the money into two equal halves, ignoring the ratio. Distractor £30 is the value of one part, found correctly but never multiplied by 3.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (c) £480.00 — To decrease by 20%, multiply by 0.80 (100% − 20%). £600 × 0.80 = £480.00. £120.00 comes from working out only the decrease (£600 × 0.20) and forgetting to subtract it from the original value. £580.00 comes from subtracting 20 directly instead of 20% of £600. £720.00 comes from multiplying by 1.20, adding the percentage instead of subtracting it.
- (a) 4:3 — Multiply both parts by the lowest common denominator, 6: (2/3) × 6 = 4 and (1/2) × 6 = 3, giving the ratio 4 : 3, which is already in simplest form.