Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) y is always 4 times x. — Check the multiplier for each pair: 12 ÷ 3 = 4, 20 ÷ 5 = 4, 32 ÷ 8 = 4 — the same multiplier every time, so y is always 4 times x. 'x is always 4 times y' comes from writing the multiplier the wrong way round. 'y is always x plus 9' only works for the first pair (3 + 9 = 12); it gives 14 for x = 5 and 17 for x = 8, not 20 and 32. 'y is always double x, plus 6' also only works for the first pair (3 × 2 + 6 = 12); it gives 16 for x = 5, not 20.
- (d) 26.6 — Find the constant multiplier — the mass of each metre of pipe: 12.6 ÷ 4.5 = 2.8, so the mass is always 2.8 times the length. For a length of 9.5 m, the mass is 9.5 × 2.8 = 26.6 kg. 17.6 comes from assuming an additive relationship instead of a multiplicative one — adding the increase in length (9.5 − 4.5 = 5) onto 12.6. 3.4 comes from using the multiplier the wrong way round (4.5 ÷ 12.6, rounded to 1 d.p.), then multiplying by 9.5. 12.6 comes from simply repeating the given mass, without applying the multiplier to the new length.
- (a) 5 — Pressure = force ÷ area = 20 ÷ 4 = 5 pascals. Getting 80 comes from multiplying the force and area instead of dividing. Getting 16 comes from subtracting the area from the force (20 − 4 = 16) instead of dividing. Getting 24 comes from adding the force and area (20 + 4 = 24) instead of dividing.
- (c) 2/7 — Method: each number in a ratio counts parts, so the whole is all the parts added together, and the fraction wanted is the cement parts over that total. Working: the mix has 5 + 2 = 7 parts altogether, and 2 of those parts are cement, so the cement is 2/7 of the mix. Answer: 2/7. The distractors: 2/5 comes from writing the cement parts over the sand parts, comparing one part with the other part instead of with the whole; 5/7 comes from writing the sand parts over the total, which answers about the wrong material; 7/2 comes from writing the total over the cement parts, turning the fraction upside down.
- (b) €230.00 — Multiply the amount in pounds by the exchange rate: 200 × 1.15 = 230, so £200 = €230.00. Working out 200 + 1.15 = 201.15 treats the exchange rate as an amount to add rather than a multiplier. Working out 200 × 0.15 = 30 finds only the extra amount earned for every pound and forgets to add it back to the original £200. Working out 200 × 11.5 = 2300.00 misplaces the decimal point in the exchange rate, multiplying by 11.5 instead of 1.15. £200 converts to €230.00.
- (c) 1 : 25 — The radii are in the ratio 4 : 20, which simplifies to 1 : 5. Areas scale with the square of the length ratio, so the area ratio is 1² : 5² = 1 : 25. Giving 1 : 5 uses the radius ratio without squaring it. Giving 1 : 10 doubles the radius ratio instead of squaring it. Giving 25 : 1 has the areas the right way round for larger to smaller, not smaller to larger.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (c) 3 hours — Method: inverse proportion means speed × time is constant for the journey, so find that constant and divide it by the new speed. Working: 60 × 2 = 120, which is the distance in kilometres; at 40 km/h the time is 120 ÷ 40 = 3 hours. Answer: 3 hours. The distractors: 1.5 hours is the ratio of the speeds, 60 ÷ 40, given as a time instead of being used to scale the original 2 hours; 1 hour 20 minutes comes from treating time as directly proportional to speed, 2 × 40 ÷ 60, which has the slower train arriving sooner; 2 hours comes from finding the constant 120 and then dividing it by the original 60 km/h again, so the time never changes.
- (c) 3 hours — Method: in inverse proportion the product of the two quantities is constant, and here that product is the distance. Working: 60 × 4 = 240 km, so at 80 km/h the time is 240 ÷ 80 = 3. Answer: 3 hours. The distractors: 5 hours 20 minutes comes from treating the relationship as direct, working out 4 × 80 ÷ 60; 2 hours 40 minutes comes from cutting the time by the fraction the speed rose by — the speed went up by one third, so the time was cut by one third — which is not how inverse proportion works; 4 hours comes from dividing the 240 km by the original speed of 60 km/h again instead of by the new speed.
- (c) £310 — Gradient = (210 − 130) ÷ (7 − 3) = 80 ÷ 4 = 20, so the monthly rate is £20. Using C = 20m + c with the point (3, 130): 130 = 60 + c, so c = 70. After 12 months: C = 20 × 12 + 70 = 240 + 70 = £310.
- (c) £3,200 — Method: find the value of one part of the ratio from the first investor's amount, then work out the second investor's share before adding both together. Working: £1,200 is 3 parts, so one part is £1,200 ÷ 3 = £400. The second investor's share is 5 × £400 = £2,000, and the total is £1,200 + £2,000 = £3,200. So the total invested is £3,200. Distractor £2,000 is only the second investor's share, without adding the first investor's £1,200. Distractor £2,400 comes from doubling the first investor's amount instead of using the ratio. Distractor £6,000 comes from multiplying £1,200 by 5 directly instead of first finding the value of one part.
- (a) 1/9 — The ratio copper : tin is 9:1, so write tin over copper: 1/9. (9/1 comes from writing the ratio the wrong way round, copper over tin. 1/10 comes from comparing the tin to the total mass of the alloy, 1 part out of 10. 9/10 comes from comparing the copper to the total mass of the alloy, 9 parts out of 10.)
- (c) 14 litres — Method: find the amount of fuel used per km first, then use it to find the fuel needed for 175 km. Working: 24 ÷ 300 = 0.08 litres per km, and 0.08 × 175 = 14 litres. So 14 litres are needed. Distractor 24 litres comes from assuming the same amount of fuel is used no matter the distance, without scaling. Distractor 21 litres comes from misreading the original distance as 200 km instead of 300 km. Distractor 1.4 litres comes from a decimal-point slip, giving an answer ten times too small.
- (a) £150 — Value after year 1: £800 × 0.75 = £600. Value after year 2: £600 × 0.75 = £450. The loss during the second year alone is £600 − £450 = £150. £450 comes from giving the value remaining after 2 years, not the amount lost during the second year. £200 comes from working out the loss during the first year instead of the second: £800 − £600 = £200. £350 comes from working out the total loss over both years instead of just the second year's loss: £800 − £450 = £350.
- (a) 3.375 — Method: the volume scale factor between similar shapes is the length scale factor cubed, not the length scale factor itself. Working: the length scale factor is 12 ÷ 8 = 1.5, and 1.5³ = 3.375. Answer: 3.375. Jayden's answer, 1.5, is only the LENGTH scale factor — he never cubed it to get the volume scale factor. 2.25 comes from squaring the length scale factor instead of cubing it, which would give the area scale factor. 4.5 comes from multiplying the length scale factor by 3 (the number of dimensions) instead of cubing it.
Build your own mix at the worksheet builder.